ML20039C391

From kanterella
Jump to navigation Jump to search
LER 81-075/03L-0:on 811127,while Performing SP-155,channel Check of Triaxial Peak accelographs,SI-5-MEI Accelograph Discovered Inoperative.Caused by Rigorous Environ & Age. Accelograph Replaced
ML20039C391
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/23/1981
From: Charles Brown
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20039C385 List:
References
LER-81-075-03L, LER-81-75-3L, NUDOCS 8112290301
Download: ML20039C391 (2)


Text

.- _-_ _ _ _ _ _ _ _ _ _

LICENSEE EVENT REPORT CONTROL BLOCK: l l l l l l l (PLE ASE PRINT oR TYPE ALL REQUIRED IRFORMATION)

. I 6 jo l l l F l L l C l R l P l 3 lgl 0 l0 l- l 0 l0 l0 l0 l0 l -l 0l0 lgl 4l 1l 1l 1l 1lgl l lg V 8 9 LICENSEE CODE 14 tb LtCENSE Nuv8ER 2b 26 LICENSE 14PE JO b7 CAT 68 j WT loTTl ,s"C '

I t l@l q 5 l0 l- 10 l 3 l 0 l2 l@l1 l li 217l s i 11@l 112 l 2 l 3 l 811 l@

7 8 60 61 DOCK kT NUMBER 68 69 EVENT DATE 74 7b REPORf DATE 80 EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h a 3 lAt 0822, while performing SP-155, Channel Check of the Triaxial Peak Accelographs, it l o 3 gwas discovered that SI-5-MEI accelograph did not meet the requirement that all seismic l lo g l monitoring instrumentation be operable as per T.S. 3.3.3.3. Redundancy was provided by l o 3 lSI-4-MEI and SI-6-MEI channels. There was no effect upon the health or safety of the g a g ggeneral public. This is the first occurrence for accelograph SI-5-MEI, and this is g o , gthe second report under this Technical Specification. g 10181 l l V 8 9 80 C DE CODE SUSC E COMPONENT CODE SUSC D'E 5 DE 7

o 9 8

lI lE lh Wh l Z l@ lA l Cl Cl El Ll 0 lh Jh W h 9 10 11 12 13 18 19 20

_ SEQUE NTI AL OCCURRENCE REPORT REVISION LE R *RO EVENT YEAR REPORT NO. CODE TYPE NO.

aP O57yu'sgRT [8 l1l22 [--J 23 l0 l7 l5 l 24 y l0 l3 l M

y30

[--j Q

_ 21 26 27 28 31 32 Kk AC ON ON PL NT MET HOURS S8 IT FOR 8. SUPPL MANUFACTURER

(( l33 A l@@@ 34 lJSZ l@ W@ 31l 0l 0l 0l 0l40 l Ylg 36 di

]g 42 lX lg 43 l44 Tl 0l 8l 0lQ 47 CAUSE OESCRIPTION AND CORRECTIVE ACTIONS h i o lThe cause of this event is attributed to a rigorous environment and age. Accelograph l i i lSI-5-MEI was replaced and'SP-155 was performed and completed satisfactorily. Opera- I bility was restored on December 3, 1981.

11131 1 - I

g. 11101I I 7 8 9 80 STA  % POWE R OTHER STATUS D15 O RY DISCOVERY DESCRIPTION i s W @ l0l0l0l@l NA l lB[glTechnicianobservation l ACTIVITY CO TENT RELE ASED OF RELE ASE AMOUNT OF ACTIVITY LOCATION OF RELEASE NA NA l1_l6.] (_Zj h (_' ZJ ,

gl l l l PERSONNEL ExPOSMES

, ~UMB E R TvPE oESCR ,nON @

i 7 l 0l 0 l 0 l@l Z lgl NA l

.PmO~~i'L nuuLS NumER oESCRiPTiO~@ NA i R l0l0l0lgl l 7 8 9 11 12 - . 30 LCSS OF OR DAMAGE To FACILnTY TYPE DESCRIPTION d( U h!

7 8 9 to NA 80 ISSUE DE SCRIPTION

  • 2 o ~ [_N_jhl NA l lllllllllll]lj

' s8 s9 81122903D1 811223 80 :

PDR ADOCK 05000302 , I pjpy) psong 904/795-6486 E S PDR terr arramh RIIPPLDIENTARY INFORMATION SHEET)

SUPPLEMENTARY INFORMATION

. Report No.: 50-302/81-075/03L-0 Facility: Crystal River Unit 3 Report Date: December 23, 1981

, Occurrence Date: November 27, 1981 Identification of Occurrence:

Failure to meet Technical Specification 3.3.3.3, that all-seismic monitoring instrumentation is operable.

Conditions Prior to Occurrence:

Mode 5 (0%).

Description of Occurrence:

At 0322, during performance of SP-155, Channel Check of the Triaxial Peak Accelographs, it was discovered that accelo-graph SI-5-MEI, did not meet the requirement that all seismic monitoring instruments are to be operable as per Technical Specification 3.3.3.3. The unit was replaced and operability was restored on December 3, 1981.

Designation of Apparent Cause:

The cause of this event is attributed to a rigorous environ-ment and age.

Analysis of Occurrence:

There was no effect upon the health or safety of the general public.

Corrective Action:

Accelograph SI-5-MEI was replaced and SP-155 was performed satisfactorily. Further corrective action is deemed unnecessary.

Failure Data

This is the first occurrence for accelograph SI-5-MEI, and this is the second report under this Technical Specification.

d

/rc .

O