ML20037C120

From kanterella
Jump to navigation Jump to search
Confirms That Encl Listed Documents Responding to FOIA Requests Were Received by Firm Representative
ML20037C120
Person / Time
Site: Crane  Constellation icon.png
Issue date: 12/18/1980
From: Carr J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Madden T
KAYE, SCHOLER, FIERMAN, HAYS & HANDLER
Shared Package
ML19341A503 List:
References
FOIA-80-515, FOIA-80-516, FOIA-80-555 NUDOCS 8101260034
Download: ML20037C120 (3)


Text

-

. un

['i

'h UNITED STATES Q

J NUCLEAR REGULATORY COMMISSION

/

WASHINGTON, D.C. 20555 s.

e

-s DEC 1r ESO I

Thomas J. Madden, Esquire Kaye, Scholer, Fierman, Hays &

Handler 1575 Eye Street, N.W.

IN RESPONSE REFER Washington, DC 20555 TO F01A-80-515, 516 AND 555

Dear Mr. Madden:

This is to confirm that a representative of your office has picked up the following listed documents, which are subject to the above-mentioned Freedom of Information Act request.

You will note that we have indicated the number of pages per document in order to maintsin a running total of the pages reproduced for billing purposes.

o

.4<hl

/ John C. Carr, Chief.

Freedom of Information and Privacy Acts Branch

Enclosures:

As stated l

,, n/

! 0 *h 0I h

^l

- Y DjL

/

/

Re:

F0!A-80-515

_ Document Description _

Date Pages_

Item 2 Inspection and Enforcement Manual Chapter 1005 -

10/1/76 2

Reports of flonroutine Events Inspection and Enforcement Manual T-1105/2 (Rev.1) 7/1/78 5

Reporting of Defects and floncompliance - Pt. 21 Reports Inspection and Enforcement Manual Chapter 1110 -

4/25/78 19 Potential Abnormal Occurrences Inspection and Enforcement fianual Chapter 1120 -

6/20/80 12 Telephone and Written Preliminary flotifications Inspection and Enforcement Manual Chapter 1125 -

5/1/78 24 11RC Office of I&E Bulletins and Circulars Compliance Manual - PI 0600/5 Compliance Division 5/5/72 7

v Bulletin Dissemination

~ IE Manual - Temporary Instruction 1105/1 Screening and 6/16/75 6

Evaluation Licensee Reports of tionroutine Events IE Manual Chapter 1126 tiRC Office of 18E Circulars 1/20/76 4

IE Manual Chapter 1120 - Preliminaty tiotifications 5/3/76 12 IE Manual Chapter 1110 '- Potential Abnormal 9/1/77 19 Occurrences IE Manual Chapter 1120 Preliminary flotifications 9/27/77 12 i

floti fica tions" IE Manual

. Temporary Instruction 1105/2 Reports of 11/4/77 6

Defects and tioncompliance - Part 21 Reports IE Manual - revised pages 5 ano 6 of MC.1120 4/28/78 3

I te.n 4 Memo for R. Vollmer from A. Ignatonis Re: TMI-2 Plant 6/8/79 70 Modifications for Cold Shutdown, Revision 2 Memo for W. F. Pasedag from Earl H. Markee, Jr. Input 7/21/80 9

to CRAC Analysis for the First 120 Hours to the TMI Incident Memo for Frank Congel from Earl H. thrkee, Jr. Re:

2/13/80 6

Relative Concentration for Use in Radiological Impact Analysis of HT0 Evaporation at TMI-2

Re: F01A-80-515 Document Description Date Pages Item 5 Miscellaneous Notes Undated 40 NRC Staff Testimony of Phillip G. Stoddart Regarding Undated 4

Plant Design Provisions to Ensure Against Contamina-tion of Groundwater NRC Staff Testimony of Walton L. Jensen, Jr. Relative Undated 4

to Board Question Regarding UCS Contention 8 NRC Staff Testimony of Walton L. Jensen, Jr. Regarding Undated 4

Transient and Accident Analysis and Procedures, Board Question 11 NRC Staff Testimony of Walton L. Jensen, Jr., John C.

Undated 20 Voglewede, Bruce A. Boger, and Peter L. Hearn Relative to Instrument Ranges Testimony of NRC Staff on Effects of Weather Modifica-Undated 8

tion on Flood Protection by T. Johnson and W. Bivins Draft Testimony of NRC Staff on Effects of Ueather Undated 5

~

Modification on Flood Protection by T. Johnson & Bivins Stipulation of Contentions Undated 9

Letter to Dwight E. Nunn from W. P. Gammill Re: Amdt. Undated 1

  1. 30 to Three Mile Island #2 Report Hydrologic Engineering Positions (Q22) Three Mile Undated 13 Island Unit 2 Miscellaneous notes from Johnson's file Undateo 14 Computer Printout Undated 18 Computer Printout Undated 41 Three Mile Island Flooding Fact Sheet Undated 9

Preliminary Sequence of Events (TMI-2, 3/28/79 Undated 65 Incident)

Hydrologic Engineering Section Undated 63 Rough Draft Re: Release of Liquid Effluents from THI Undated 44 to the Susquehanna River for the Period 3/28/79 thru 4/30/79

Re: F01A-80-515 Document Description Date Pages Item 5 Rough Draft Re: R1 eases of Liquid Effluents from TMI Unda ted 57 to the Susquehanna River for the Period of 3/28/80 thru 4/30/79 Draft Re: Surface Water Hydrology Undated 12 Memo for W. Bivens from J. T. Collins Re: Ground Undated 2

Water Monitoring at TMI Diagram - Well Locations Undated 1

Memo for the Commissioners from Harold R. Denton Undated 5

Re: Tritium Concentrations in Groundwater Monitoring Wells Around the TMI Unit 2 Reactor Containment Building Handwirtten Draft Memo for the Commissioners from H.

Undated 8

Denton.Re:_ Tri tium _Concen tra tions. in _ Groundwa ter Monitoring Wells Around the TMI Unit 2 Reactor Containment Building Requests for Action Plan to Evaluate Groundwater Undated 3

Conditions at TMI Riprap Design - TMI Unit 2 Undated 2

Letter to R. C. Arnold from Robert W. Reid Re:

  • Undated 3

Condition of the Dike and Riprap at Three Mile Island 1 and 2 Notes and Computations of Hulman Various Dates 32 TMI Unit 2 Groundwater Study Undated 40 Crystal River - Request for Additional Information Undated 2

Concerning Technical Specification Changes Memo for D. F. Ross from G. R. Mazetis Re: B&W Tech Undated 2

Spec Review Memo for D. F. Ross from B. A. Wilson Re: Reactor Undated 5

Coolant Pump Trip Requirements for B&W Plants (IE Bulletin 79-05C)

Criteria and Conclusions Undated 6

Re:

F01A-80-515 Document Description Date Pages Item 5 Vugraphs Undated 6

Draft Memo for R. Capra from S. Israel Re:

Undated 38 Commissioner Ahearne Memorandum Dated July 19, 1979 l

Comments on Ground Water Monitoring Program - TMI 1/2 2

Unit 2

\\

Tritium levels in Groundwater 1/24 1

Summary of Tritium levels in Groundwater 1/24 1

Tritium levels in Groundwater 1/24 1

Tritium levels in Groundwater (to Bill Bivins) 4/11 2

Status of Groundwater Monitoring at TMI 4/18 1

Note to Johnson from Bivins Re: Dr. Little's 8/22 5

Testimony Safety Evaluation Re: Three Mile Island Nuclear 9/5/69 106 j

Station Unit 2, Dauphin County, Pennsylvania Diagram - Plot Plan - Plant Roads and Parking Areas - 11/4/70 1

Unit 1 l

Diagram - Site Improvements Plot Plan, Finished 1/4/ 71 1

j Gradin'g' Plant Site - Unit 1 l

l Three Mile Island Levee Riprap 3/26/71 3

l Atomic Energy Commission Petition for Intervention 6/20/74 5

i l

Letter to Lewis G. Ilulman from Franklin F. Snyder 6/21/74 6

t TMI-2 Hydrologic Engineering Questions Memo Route Slip to B. W. Washburn from W. Bivins 7/8/74 7

Re: Draft Questions on TMI Memo to Site visit from B. Washburn Re: Operating 7/29/74 4

License Safety Review Site Visit - ilydrology, 7/17/74 Memo to Voss A. Moore from Robert L. Tedesco Re:

8/2/74 9

Request for Additional Information for the TMI Nuclear l

Station, Unit 2

!!emo to V. A. Moore from liarold R. Denton Re:

8/5/74 3

flydrologic Engineering Q-1-FSAR

r q

Re:

F01A-80-515 Document Description Date P_ ages Item 5 Notes of Telecon between Terry Johnson, B. Washburn, 10/23/74 2

C. Kepford Re: Plant Shutdown Senary of October 10, 1974 Meeting in Bethesda with 10/29/74 11 Interveners' Representatives to Discuss Interveners' Contentions l

Memo to K. Kniel from Richard H. Vollmer Re: Regula-2/12/75 1

tory Staff Positions: TMI-2, Quality Assurance, Conduct of Operations Memo to R. Ballard et. al. from William H. Regan 3/5/75 2

Re: Metropolitan Edison Co. Three Mile Island 2 Liquid Radwaste Spill - TMI 3/12/75 4

Memo to Karl Valiel from B. Hashburn Re: Forthcoming 4/1/75 2

Meeting with Met-Ed - TMI-2 h

Letter to Dwight E flunn from W. P. Gammill Re:

4/4/75 1

I Amendments to Three Mile Island 2 Report Letter to Dwight E. Nunn from W. P. Gammill Re:

4/14/75 1

Amendment (26) to Three Mile Island Unit 2 Report Memo to Voss A. Moore from Robert L. Tedesco Re:

4/16/75 7

Request for Additional Information for Three Mile Island Nuclear Station, Unit 2 Letter to Lewis G. Ilulman from Franklin F. Snyder 4/18/75 4

Re: Ilydrologic Engineering Questions - TMI-2 flydrology Questions 4/30/75 4

Memo to V. A. Moore from llarold R. Denton Re:

4/ 'X)/75 5

Ilydrologic Engineering Positions Memo to V. A. Moore from liarold R. Denton Re:

5/7/75 6

Q-2's and Position on Foundations Memo to K. Kniel form Gus C. Lainas Re: TMI-2 5/14/75 1

Containment Penetration Pressurization and Fluid Block Systems Site Visit - llydrology, May 12,1975, TMI-2 5/15/75 4

l l

1

Re:

F0!A-80-515' Document Description Date Pages Item 5 i

Memo to V. A. Moore from Harold R. Denton Re:

5/20/75 2

Hydrologic Engineering Positions (Supplemental)

Memo to Karl R. Galler from Harold R. Denton Re:

5/28/75 3

Degradation of Safety Related Flood Protection at THI-l&2 Memo to Charles Ferrell et. al. from Jan A. Norris 5/30/75 1

Re: Three Mile Island -2 Environmental Review Team Meeting Letter to R. C. Arnold from W. H. Regan, Jr. Re:

6/23/75 3

Confirmation of Site Visit Results of Observations of TMI Station Dike Riprap 6/27/75 6

and Preliminary Recommendations Tropical Storms, Since 1894, Giving Significant 7/2/75 5

Precipitation to Susquehanna River Drainage Above llarrisburg, PA Memo Route Slip to H. R. Denton from W. Bivins Re:

TMI Flood Protection 7/2/75 1

Letter to Dwight E. Nunn from L. G. Hulman Re: Work 8/7/75 1

Directise TR-9 Contract No. AT(49-24)-0058 TMI Liquid Radwaste Spill 8/25/75 1

Memo to W. C. Burke from L. G. Hulman Re:Hydrologic 8/26/75 1

Engineering Input - Postulated Accidental Liquid Radwaste Spill Letter from Franklin Synder to Lewis Hulman Re:

Hydrologic Engineering Summary 9/2/75 7

Letter to Bernard C. Rusche from R. C. Arnold Re:

9/11/75 3

Emergency Shutdown Cooling Water at TMI-l Memo to V. A. Moore from Itarold R. Denton Re:

Ilydrologic Engineering Summary 9/16/75 10 Memo to Daniel R. Muller from Harold R. Denton Re:

Hydrologic Engineering DES Input 9/22/75 6

Letter to Director, Division of Reactor Licensin9 from R. C. Arnold Re: Riprap of dikes 9/29/75 2

Dike Riprap Evaluation Final Report - Three Mile 1sland Nuclear Station 10/75 64

Re:

F0lA-80-515 Document Description Date Pages Item 5 Letter to Dwight E. Nunn from W. P. Gammill Re:

10/14/75 1

Amendment (33) to Three Mile Island #2 Report Memo for Voss A. Moore from Robert L. Tedesco Re:

11/17/75 13 Draft Safety Evaluation Report for TMI Nuclear Station Unit 2 Letter to Karl R. Goller from Harold R. Denton Re:

12/16/75 2

Dredging Permit - Three Mile Island Letter to R. W. Reid from R. C. Arnold Re: Dike 2/12/76 1

and riprap. repairs.

Memo'to D. G. Eisenhut from Robert W. Reid Re:

3/2/76 10 Spent Fuel Cask Drop Accident for TMI Unit 1 -

Request for Assistance Letter to R. C. Arnold from Robert.W. Reid Re: Three 3/24/76 2

Mile Island Travel Arrangements Memo to W. S. Bivins from Terry L. Johnson Re: Inspec-5/10/76 1

tion Riprap and Dike Repairs Performed Last Fall &

Winter Memo to R. C. DeYoung from Robert L. Tedesco Re:

5/17/76 9

Revisions to the Draft Safety Evaluation Report for TMI-2, and request for additional information Note to R. Kiessel from James W. Shapaker Re: Contain-6/3/76 1

ment Purge isolation Valves, TMI-2 Attendance List 6/24/76 1

Memo to R. C. DeYoung from' Robert L. Tedesco Re:

7/1/76 4

Revision 2 to the Draft Safety Evaluation Report for TMI-2 Memo to J. T. Collins from William S. Bivins Re:

7/12/76 1

Acceptance Review of 10 CFR Part 50, Appendix I Submittal Memo to D. Vassallo from John T. Collins Re:

7/12/76 2

Acceptance Review of the Appendix I Information for TMI-2 Memo for L. G. Hulman from T. L. Johnson Re: Site 7/12/76 1

Visit to TMI Nuclear Plant

Re:

F01A-80-515 Document Description Date Pages Item 5 Telecopy of Letter to D. Vassallo from R. C. Aron 1d -

7/ 29 / 76 2

TMI Dike and Riprap Repairs Letter to D. B. Vassallo from R. C. Arnold 7/29/76 3

Re: Dike East Exposure where the riprap

~

size was smaller than required Memo to Richard C. DeYoung from Paul E. Norian Re:

8/3/76 2

Requested Additional Information - TMI-2 Letter to D. B. Vassallo from R. C. Arnold Re:

8/6/76 5

July 29 letter clarification and of the recently completed toe of the dike survey Routing Slip to W. Bivins and J. Norris from 8/9/76 1

T. Johnson Re: Review of TMI l 'and 2 'FES Draf t Memo for K. ' R. Goller from D. Eischhut Re:

8/27/76 10 Round One Questions - Cask Drop Report -TMI-1 Letter to Robert W. Reid from R. C. Arnold Re:

10/8/76 2

Dike Repairs Routing Slip for H. Silver from J. Johnson Re:

10/12/76 3

Response to ACRS Questions Memo for W. Regan from L. G. Hulman Re: Response to 10/15/76 2

Agency DES Comments Letter to Robert W. Reid from R. C. Arnold Re: Repairs 12/2/76 1

to the Dikes at Three Mile Island Letter to Robert W. Reid from R. C. Arnold Re: Repairs 12/2/76 2

to the Dikes at Three Mile Island Letter to R. M. Klingaman from A. M. Miramon Re: Rip 12/9/76 9

Rap Repairs: East and West - Three Mile Island Memo for D. Vassallo from R. L. Tedesco Re: Status of 12/17/76 3

the Open Items in the Draft Safety Evaluation Report for THI-2 Memo for K. Kapur from J. Shapaker Re: TMI-2 Reactor 12/23/76 1

Cavity Analysis TMI-1 Surveillance Procedure - Inspection of Dikes 1/17/77 21 Memo for S. Varga from L. G. Hulman Re: Staff 1/21/77 6

Testimony

Re:

F01A-80-515.

Document Description _

Date Pages-Item 5 Hydrographic Survey - Three Mile Island Nuclear 1/24/77 21 Station by Gilbert Associates, Inc.

Memo for J. Shapaker from I. Sihweil Re: TMI-2 2/02/77 1

Reactor Cavity Analysis Memo for D. B. Vassallo from R. L. Tedesco Re: TMI-2 2/4/77 3

Main Steam Line Break Accident Analysis Memo for D. B. Vassallo from D. F. Ross Re: TMI-2 2/9/77 13 Steamline Break Analyses Memo for D. B. Vassallo from R. L. Tedesco Re: TMI-2 3/10/77 7-Main Steam Line Break Accident Analysis Prepared Testimony of C. L. Hosler 3/25/77 3

Letter to Terry Johnson from R. C. Arnold Re:

4/7/77 1

4 Dike Riprap Repairs DB-1 Site Visit for Abnormal Occurrence 9/30/77 10 Routing Slip for F. Congel from W. Bivins Re: TMI-11/29/77 4

Dilution Factors for App. I.

Memo for D. Vassallo from R. L. Tedesco Re: Revision 12/9/77 3

to the Draft Safety Evaluation Report for TMI-2 Memo for D. Vassallo from Robert Tedesco Re: TMI-2 3/2/78 3

Building Spray Pump Head Curves and Net Positive Suction Head (NPSH)

Memo for D. B. Vassallo from R. L. Tedesco Re: CSB 3/6/78 1

Comments on Supplement 2 to the Safety Evaluation Report for TMI-2 Memo for D. Vassallo from R. Tedesco Re: Environmental 3/10/78 2

Qualification Memo for D. Vassallo from R. Tedesco Re: Draft Safety 3/17/78 5

Evaluation Report Supplement for Three Mile Island, Unit 2 Memo for D. Vassallo from R. L. Tedesco Re: Draft 3/23/78 6

Supplement to the Safety Evaluation Report for TMI-2 Memo for D. Vassallo from R. Tedesco Re: Request for 4/3/78 14 Additional Information on Environmental Qualification l

for a Main Steam Line Break Inside Containment for i

TMI-2 l

I l

Ra:

F01A-80-515 Document Description Date Pages Item 5 Memo for D. Vassallo from R. Tedesco Re: Draft 9/18/78 9

Supplement to the Safety Evaluation Repor for TMI-2 NRC Staff Report - Evaluation fo long Term Post 4/79 85 Accident Core Cooling of TMI-2 Memo for B. K. Grimes from G. W. Knighton Re:

4/10/79 1

Accident Considerations for Tank Farm Installation Memo for the files from R. L. Tedesco Re: Westing-4/10/79 3

house Action on TMI-2 Incident Letter to W. R. Cobean from G. R. Capodanno Re:

4/10/79 17 THI-2 Modification Criteria for Use of Steam Generators for Short & Long Term Cooldown Memo to E. Case et. al. from Frank J. Miraglia Re:

4/12/79 12 TMI-2 Accident Routing Slip for Mike Aycock.et. al. from G. Mazetis 4/18/79 16 Re: RSB Package on Review of Alternate Cooling Systems Routing Slip for Mike Aycock from R. Frahm Re: RSB 4/19/79 17 Package on the Review of Alternate Cooling Systems Groundwater Study for TMI-2 by T. Nicholson 4/19/79 23 Groundwater Study for TMI-2 by T. Nicholson 4/19/79 19 Groundwater Study for TMI-2 by T. Nicholson 4/19/79 19 Memo for distribution from Steven A. Varga Re:

4/26/79 17 Responses to Bulletins Memo for R. L. Tedesco from R. K. Frahm Re: Oconee -

4/26/79 2

Small Break Analysis Memo for Karl Kniel from H. J. Richings Re: Decay Heat 5/9/79 4

for TMI-2 Summary of Radionuclides Released to the Susquehanna 5/12/79 11 River Memo to R. Arnold et. al. from S. W. Porter Re: Data 5/15/79 8

and Flowpaths for TMI Liquid Release Presentations of 5/16/79 and 5/?l/79 i

~

Re:

F0!A-80-515 Document Description Date Pages Item 5 Memo to Ben Rusche et. al. from Syd Porter Re:

5/15/79 4

Comparison of Doses to Maximum Individual for 3/28/79 - 5/11/79 vs. 3/28/78 - 5/11/78 Letter to R. L. Williams from J. A. Winterhalter 5/25/79 26 Re: Preliminary Soils Information Solid Waste Staging Facility Memo for Zoltan R. Rosztoczy from G. M. Holahan Re:

6/1/79 5

Recommendations Relative to Reestablishing Natural Circulation at TMI-2 in the Event of Loss of Natural Circulation Routing Slip to D. Muller from W. Bivins Re: Results 6/6/79 22 of the HMB Survey Memo for K. Cornell et. al. from R. C. DeYoung Re:

6/6/79 7

Information Congerning TMI-2 Activities Letter to Jerry llulman from Allen F. Flanders Re:

6/7/79 2

June 5th Meeting of the Hydrology Committee of the Water Resources Council Incident Investigation Report, Oconee 1 6/11/79' 50 Memo for Robert Bernero from Thomas Nicholson Re:

6/19/79 31 Request for Information Concerning TMI-2 Activities Routing Slip to W. S. Farmer et. al. from Gary 6/22/79 14 Bennett Re: Analysis of Nuclear Reactor Events Reported in March 1979 Letter to D. W. Dragnich from L. G. Ilulman Re:

6/24/79 1

Proposal to Determine the Extent of Cesium-137 in Susquehanna River Memo for Richard H. Vollmer from L. G. Hulman Re:

6/26/79 3

Groundwater Monitoring at TMI-2 Memo to R. P. Denise from L. G. Hulman Re: TMI-2 7/3/79 26 Lessons Learned in Meteorology and Hydrology Memo for Ben C. Rusche from John T. Collins Re:

7/6/79 4

Groundwater Monitoring at TMI-2 Memo for Z. R. Rosztoczy from B. W. Sheron RE: THI-2 7/11/79 5

Turbine Overspeed Trip of 3/6/79

Re: F01A-80-515 Document Description _

Date Pages

~

Item 5 Rancho Seco Reactor Trip 7/12/79 2

Letter to Professor C. B. Richardson from Denwood F.

7/16/79 4

Ross Re: Design of the Drain Lind from Arkanasa Nuclear One Routing Slip to R. L. Bangart from W. Bivins Re:

7/24/79 4

Responses to TMI Interrogatories 21, 22, and 40 Letter to J. R. Wallis from Harold R. Denton Re:

7/26/79 4

Site Flooding Memo for Chairman Hendrie et. al. from James J.

7/30/

17 Cummings Re: Michelson Report - Events and Levels of Review Routing Slip to L. G. Hulman from John T. Collins Re:

8/1/79 3

Groundwater Monitoring Program Memo for L. V. Gossick from G. R. Mazetis Re: Corres-8/6/79 29 pondence to the Presidential Commission on TMI Note to files from Johnson Re: Seepage Escaping 8/8/79 1

through the Dike Report - Reason for Investigation 8/8/79 23 Arkansas Nuclear One Unit 1 8/13/79 9

Arkansas Nuclear One - Unit 1 Shut-Down Operation 8/13/79 6

Memo for Zoltan R.

Rosztoczy from Brian W. Sheron Re: 8/15/79 11 Memorandum, Sheron to Rosztoczy, "TMI-2 Turbine Overspeed Trip of 3/6/79," dated July 11, 1979 Memo for B&O Task Force from D. F. Ross Re: B&W 8/20/79 18 Feedwater Transients Memo for Chairman Hendrie et. al. from Harold R.

8/20/79 37 Denton Re: Resumption of Licensing Reviews for Nuclear Power Plants Note to D. Ross from Leo Beltracchi Re: B&W Feedwater 8/27/79 3

Transients Memo for R. Capra from S. Israel Re: Technical 8/29/79 13 Assistance Request - Proposed Tech Spec Changes for B&W Operating Plants

Re: F01A-80-515 Document Description Date Pages Item 5 Memo for multiple addressees from Roger J.

8/30/79 30 Mattson Re: Final Review of Chronology of Events on TMI-2 Hydrogen Bubble Concerns Letter to Stanley M. Gorinson from Roger J.

9/6/79 106 Mattson Re: Hydrogen Bubble Flammability Concern at TMI-2 Memo for D. F. Ross from R. J. Mattson Re:

9/11/79 1

Sensitivity of Nuclear Steam Supply System Utilizing Once Through Steam Generators Note for Sanford Israel from Frank Ashe Re:

10/2/79 1

Recommendation (for B&W Plants) Concerning the Addition of Interim Circuitry to Automatically Trip the Reactor Coolant Pumps Routing Slip to Paul Leech from J. T. Collins Re: 10/7/79 52 Attached copy of Met-Ed's Report on Managment Options for TMI-2 Contaminated Water Letter to J. J. Barton from John T. Collins Re:

10/16/79 1

Groundwater Monitoring at TMI-2 Routing Slip to S. Israel et. al. from R. A.

10/23/79 5

Capra Re: Arkansas Nuclear One-1 RAI on Proposed Tech Specs Epicor II Processing 10/25/79 1

Memo for Chairman 11endrie et. al. from Harold R.

10/25/79 32 Denton Re: Interim Report on Sensitivity Studies of the B&W Reactor Design Letter to R. W. Heward from R. L. Rider Re:

10/31/79 4

Ground Water Monitoring Program at TMI-2 Memo for Steven A. Varga from Anthony Bournia 11/14/79 25 Re: Summary of Meeting with Utilities and Babcock and Wilcox to Discuss the 10 CFR 50.54 Requests Note to file from W. Bivins Re: Groundwater 12/11/79 1

Monitoring Program at TMI-2 Letter to John T. Collins from R. F. Wilson Re:

12/12/79 1

Engineering Effort to Implement a Groundwater Monitoring System

r Re: F0lA-80-515 Document Description Date Pages

^

Item 5 Note to Robert J. Mattson from L. G. Hulman Re:

12/21/79 7

Recommended Modifications to Task Action Plans Technical Assignment Control Form sent to 12/27/79

-2 reviewers Chronology of Groundwater Monitoring Program 1/80 74 (EIAG)

Tentative Outline for TMI-2 Programmatic EIS 1/10/80 10 Facsmilte Request to L. Holman from J. T. Collins 1/11/80 -

3 Re: Highly Contaminated EPICOR II Filters Stored in Flood Area at TMI Draft Letter to Editor in Chief, Paxton Herald 1/22/80 9

from T. J. Johnson Re: Article.Regarding.the-Flood Vulnerability of TMI Memo for J. T. Collins from G. Kalman Re: Status 1/23/80 1

r of Ground Water Monitoring Wells Memo for R. Vollmer from S. F. Newberry Re: TMI-l 1/25/80 9

Restart Review:

Emergency Feedwater System l

Capacity and Anticipatory Reactor Trip Memo for P. Leech from F. Congel Re: RAB. Input to 1/29/80 6

Programmatic EIS Memo for Jan Norris from William S. Bivins Re:

1/31/80 2

Class 9 Accident Considerations at TMI 3

Memo for R. Vollmer from J. Collins Re: 5tatus 2/5/80 1

of Ground Water Monitoring Wells Around TMI-2 Reactor Building letter to Paul Leech from Steven M. Long Re:

2/15/80 5

Technical Issues Involved in Scoping the Programmatic Environmental Impact Statement (EIS)

Memo to W. Bivins from John T. Collins Re:

2/20/80 2

Status of Ground Water Monitoring Wells for j

THI-2 Reactor Building l

Notes on TMI Visit, Meeting etc.

2/27/80 10 i

i 1

n

Ra: F01A-80-515 Document Description Date Pages Item 5 Status of Offsite Emergency Radiological Environ-3/1/80 72 mental Monitoring Program Routing Slip to Bi.11 from Ted Re: Ground 3/5/80 2

Monitoring Well.s Memo for John T. Collins from George Kalman Re:

3/7/80 6

Status of Ground Monitoring Wells Around TIM-2 Reactor Building Ground Water Observation Well Report 3/7/80 87 Ilandwritten note from W. Bivins Re: TMI Ground-3/10/80 1

water Testing Program Memo for W. Bivins from J. T. Collins Re: Status 3/11/80 2

of Ground Monitoring Wells Around TMI-2 Reactor Building Letter to H. G. Parris from Olan D. Parr Re:

3/25/80 5

Supplemental 10 CFR 50.54 Requests Regarding B&W System Sensitivity for Bellefonte Nuclear Plant 1 & 2 Three Mile Island Groundwater Monitoring Tritium 4/80 9

Concentration Notes by T. Johnson Re: Sample Collected from 4/2/80 1

Wells Ground Water Monitoring Well Sample Summary 4/3/80 3

TMI - PEIS Re: liydrology and Water Use 4/4/80 18 Routing Slip to TM1 File from T. Johnson Re:

4/4/80 1

called River Forecast Center Agenda - Three Mile Island Site 4/14/80 2

Memo for William S. Bivins from Terry L. Johnson 4/18/80 2

Re: Site Visit to TMI-2 to Observe Pumping Operations at Monitor Wells Memo for J. T. Collins from George Kalman Re:

4/25/80 19 Ground Water Monitoring Program Status I

(

Memo for George Lear from Terry L. Johnson Re:

5/6/80 1

Site Visit to TMI

Re:

F01A-80-515 Document Description Date Pages

' Item 5 Memo for William S. Bivins from Terry L. Johnson 5/6/80 2

Re: Site Visit to TMI to Discuss Groundwater Monitoring Program letter to William E. Riethle III from Larry G.

5/6/80 5

Kanipe Re: Analysis of Water and Soil Samples Collected on April 11-15, 1980 Memo to T. P. Speis from Brain W. Sheron Re:

5/30/80 2

Summary of Meeting with Industry on 5/22/80 to Discuss Reactor Coolant Pump Trip During Small l

Break LOCA's l

Memo to G. K. Hovey from T. J. Walsh Re: Three 6/6/80 44 l

Mile Island Nuclear Station Groundwater Results Memo for D. G. Eisenhut from D. F. Ross Re:

6/11/80 14 l

Review of TMI-l Restart Safety Evaluation l

Handwritten note Re: Licensee Requesting Relief 6/13/79 1

from Cleaning Out the Storm Culvert Note to les Rubenstein from J. F. Stolz Re:

6/17/80 5

TMI-1 Potential Core Damage Accident Sequences -

Comments l

Memo to G. K. Hovey from T. J. Walsh Re: Three 6/23/80 26 l

Mile Island Groundwater Results Letter to Gary G. Baker from William H.

6/27/80 5

McTigue and Chaires R. Butts Re: Preliminary Report on Groundwater Monitoring TMI Unit 2 Letter to J. T. Collins from G. K. Hovey Re:

7/2/80

.49 Evaluation of EPICOR II Wastes

^

Memo to G. K. Hovey from T. J. Walsh Re: Three 7/3/80 21 Mile Island Nuclear Station Groundwater Results Memo for W. Bivins from John T. Collins Re:

7/15/80 1

Groundwater Monitoring Results Note to D. Rcss, et. al. from G. Magetis Re:

7/15/80 37 i

Response to TMI-l Contentions i

R2: F01A-80-515 1

l Document Description Date Pages Item 5 l

Routing Slip for '4. Bivins from Johr T. Collins 7/22/80 23 l

Re: Latest tritium results from TMI groundwater and soil samples Memo for R. W. Reid from D. Tondi Re: TMI-l 7/23/80 23 Contention Response Letter to Carlyle Westland from W. E. Riethle 8/4/80 24 Re: Tritium results from TMI groundwater and soil samples as reported by Teledyne Isotopes Draft - NRC Staff Testimony of Walton L.

8/7/80 50 Jensen, Jr., Relative to Reactor System Instrumentation ECNP Contention ld Memo for R. Mattson et. al. from H. R. Denton 8/12/80 10 Re: TMI-l Restart Memo for James R. Tourtellotte from Faust Rosa 8/13/80 8

Re: Requested Material from T!!I-l Witness Memo for Thomas H. Novak from Paul S. Check Re:

8/18/80 36 Response to TMI-1 Contentions Routing Slip for Bernard Snyder from William 8/19/80 9

Bivins Re: Silting Problems at the Intake Structure at TMI, and Proposal for Solving the Problem Memo for Paul Leech from George E. Lear Re:

8/20/80 22 Assessment of Groundwater Liquid Pathway from Leakage of TMI Containment Memo for Thomas M. Novak from Paul S. Check Re:

8/23/80 4

Review of TMI-l Procedures and Board Question 11 Letter to Carlyle Westland from W. E. Riethle Re: 8/28/80 29 Tritium Results from TMI Groundwater and Soil Samples as Reported by Teledyne Isotopes Note to T. Speis from W. Jensen Re: Status of 8/28/80 2

THI-l Testimony Memo for Richard H. Vollmer et. al. from Thomas 9/9/80 3

Novak Re: TMI-l Hearing - Additional Board Questiuns

RS:

F01A-80-515 Document Description Date Pages Item 5 Memorandum for James M. Cutchin et al from Themis 9/12/80 19 Speis Re: Testimony for TMI-1 Restart Hearing Memorandum for James M. Cutchin et al from Themis 9/15/80 11 Speis Re: Testimony for TMI-1 Restart Hearing Letter to Carlyle Westland from W. E. Riethle 9/16/80 25 Re: Tritium Results from TMI Grcundwater and Soil Samples Routing Slip to T. Novak from G. E. Lear Re:

9/17/80 1

Reviewer for the Board Questions Regarding Groundwater Memo for Thomas M. Novak from Paul S. Check Re:

10/10/80 106 Final Response to TMI-1 Restart Hearing Board Question 6 Note to M. Cutchin from Walton Jensen Re:

10/14/80 6

Testimony by R. Pollard on UCS Contention 3 Memo for Robert W. Reid from George E. Lear 10/17/80 11 l

Re: Staff Testimony Regarding Groundwater Contamination at TMI Memo for Robert W. Reid from George E. Lear Re:

10/17/80 7

Staff Testimany Regarding Groundwater Contamina-tion at 1MI Note to T. Johnson from G. Kalman Re: Cleanup 10/21/80 1

Operaticns Letter to Carlyle Westland from W. E. Riethle 10/28/80 30 Re: Information Concerning Groundwater at TMI Draft - NRC Staff Testimony of Mohan Thadani Re: Restart of TMI-l Potential Accidents Eval.

10/28/80 27 Memo for Darrell G. Eisenhut et al from H. Silver 10/29/80 5

Re: TMI-l Restart Hearing Schedule and Location Memo for Robert W. Reid from George E. Lear Re:

11/3/80 15 Staff Testimony Regarding Groundwater Contamina-tion at TMI NUREG 0683 NUREG 0662 Draft and Final HUREG 0560

Re: F01A-80-515 Document Description Date Pages Item 6 Draft Memo for Robert L. Tedesco from Zoltan Undated 6

Rosztoczy Re: Comments on " Generic Assessment of feedwater Transients in Reactors Designed by B&W" Responses to NRC Questions on llYTRAN Topical Undated 7

Review Chart Re: liydrogen B-SAR-205 Undated 1

Draf t Memo for D. B. Vassallo. from R. L. Tedesco Undated 4

Re: Draft' Safety Evaluat,i.on for Midland 1 & 2 Memo for R. C. DeYoung from Victor Stello 'e:

10/16/73 2

R Review of B&W Letter Report Entitled " Operational Parameters for Rancho Seco Unit 1" Memo for R. C. D'eYoung from Victor Stello Re:

11/8/73 4

Review of B&W Report "KAPP4 - Digital Computer Program for Solution of Reactor Kinetice:;- and Primary System Pressure Response" Memo for V. A. Moore from Victor Stello Re:

8/12/74 1

Review of B&W Report "Three Dimensional Power Distribution Analysis" Letter to James F. Mallay from A. Schwencer Re:

8/29/74 4

Review of Report " Calculation of Maximum Fuel Enthalpy During Rod Ejection Accident" Quality Assurance - PSAR Review Checklist Per 10/74 34 Standard Review Plan PSAR Review Checklist 11/74 32 PSAR Review Checklist 11/74 21 Memo for V. A. Moore from Victor Stello Re:

11/19/74 1

Review of B&W Report Entitled "CADD-Computer Application to Direct Digital Simulation of Transients in Water Reactors" Letter to James F. Mallay from A. Schwencer Re:

12/4/74 1

CADD - Computer Application to Direct Digital Simulation of Transients in. Water Reactors Letter to James F. Mallay from A. Schwencer Re:

12/10/74 6

Topical Report Evaluation - BAW-10076 & 10080 Letter to Wayne llodges from Judith M. Cuta Re:

1/24/75 14 BAW-2 Critical lleat Flux Correlation

~

R2:

F01A-80-515 Document Description Date Pages Item 6 Memo for Voss A. Moore from Robert L. Tedesco 11/24/75 5

Re: Acceptance Review of B-SAR-205 Memo for R. C. DeYoung from Gus C. Lainas Re:

5/11/76 8

Request for Additional Information for B-SAR-205 Memo for Robert L. Tedesco from James W. Shapaker 6/22/76 2

Re: Proposed Position on B&W Containment Isolation System Memo for D. Vassallo from Robert L. Tedesco Re:

9/9/76 5

Request of Additional Information for B-SAR-205 Memo for S. Varga from P. S. Check Re: B&W 5/4/77 3

Submittal on Combination of Peaking Factors Memo for D. Vassallo from R. L. Tedesco Re:

5/4/77 10 Draft Safety Evaluation Report for B-SAR-205 Letter to James H. Taylor from Steven A. Varga 5/13/77 3

Re: Comments on B&W's Submittal on Combination of Peaking Factors Memo for D. Vassallo from R. Tedesco Re: Revision 9/23/77 4

to Report to ACRS in the Matter of BSAR-205 Letter to James Taylor from Steven A. Varga Re:

12/5/77 1

Update of BAW-10055, " Fuel Densification Report" Decay 11 eat Removal During a Very Small Break 1/78 36 LOCA for a B&W 205-Fuel-Assembly PWR Memo for D. B. Vassallo from R. L. Tedesco Re:

11/24/78 9

Power Peaking Nuclear Reliability Factors (TAR-4629)

Draf't Memo for D. B. Vassallo f rom R. Tedesco 2/29/79 6

Re: Midland 1 & 2 SER Input from Analysis Branch Draft Memo for D. B. Vassallo from R. L. Tedesco 4/79 12 Re: Midland 1 & 2 SER Input from Analysi,s Branch Memo for R. L. Tedesco, et. al. from Z. R.

4/10/79 9

Rosztoczy Re: Genaric Review of Feedwater Transients in B&W Reactors Note to R. Mattson from S. Israel Re: Ove r-4/23/79 2

pressure Transients in B&W Plants t

1

Re:

F01A-80-bl5 Document Description Date Pages Item 6 Analysis of the Three Mile Island Accident, 6/8/79 28 EG&G report Re: B&W Audit Calculations 8/14/79 32 Memo for Chairman Ahearne from Harold R. -

1/11/80 3

Denton Re: B&W Analyses of the 9/24/77 Accident at Davis-Besse Memo for Paul S.' Check from Rodney M.

5/9/80 100 Satterfield Re: Assessment of B&W Report BAW-1564, " Integrated Control System Reliability Analysis" Memo'for Robert W. Reid from Olan D. Parr 8/5/80 24 Re: Crystal River 3 Auxiliary Feedwater System Reliability Evaluation Letter to S. Gupta from C. W. Stewart Re: Review 10/20/80 4

of B&W Documents on the LYNX-1 and LYNX-2 Codes Draft Memo for T. Novak from L. S. Rubenstein Re: 11/80 14 Midland 1 and 2 SER Input from Core Performance 1

Branch Item 10 Memo for Lee V. Gossick from Thomas J. McTiernan 7/16/76 1

Re: GA0 Draft Report Entitled " Poor Management of a Nuclear Li Code 76A-34)ght Water Reactor Safety Pr6fect (OIA Memo for Lee V. Gossick from 0. Gean Abston Re:

10/2/78 1

Draft GAO Report to the Chairman Entitled " Reports of Events at Conmercial Nuclear Facilities:

Opportunities to Improve Nuclear Regulatory Commission Oversight" Item 12 Information Report for the Commissioners from 7/20/77 4

Ernst Volgenau Re: Resident Inspection Program SECY-77-138B Information Report for the Commissioners from 11/9/77 5

Ernst Volgenau Re: Resident Inspection Program SECY-77-138C Memo for Victor Stello, Jr. from Elliott Greher 10/6/80 2

Re: Rcsponse to Request from Presidential Over-sight Committee

F-N

  • u..

b UNITED s1 AT Es NUCLEAR REGULATORY COMt.11SSION i

r.

$.;.h'illaf]5 fE WASWNGTON, D. C. 20LLS e v.J

  • ...+

DEC 8 1380 Thomas J. Madden, Esquire Kaye, Scholer, Fierman, Hays & Handler 1575 Eye Street, N.W.

IN RESPONSE REFER Washington, DC 20005 TO F01A-80-515

Dear Mr. Madden:

This is to confirm that a representative of your office has picked up the following listed documents, which are subject to the above-mentioned Freedom of Information Act request.

You will note that we have indicated the number of pages per doc. ment in order to maintain a running total of the pages reproduced for billing purposes.

F0IA No.

Document Description Date Pages Items 1 and 3 80-515 Manual Chapter NRC-0123 - Organization 5/23/80 26 and Functions Office of Nuclear Reactor Regulations80-515 Manual Chapter NRC-0123 - Organization 9/8/80 3

and FJnctions Office of Nuclear Reactor Regulations80-515 Manual Chapter NRC-0127 - Organization 2/23/78 10 and Functions Office of Inspection and Enforcement 80-515 Manual Chapter NRC-0127 - Organization 9/25/79 4

and Functions Office of Inspection and Enforcement 80-515 NUREG 0039-3 Rudget Estimates Fiscal 1/23/78 22 Year 1979 80-515 NUREG-0503 Budget Estimates Fiscal 1/22/79 25 Year 1980 80-515 NUREG-0503, Supp.1 Fiscal Year 1980 12/10/79 6

Supplemental Budget Request 9

/' /

3 se

F0IA No.

Document Description Date "Pages '

l Item 2 1

80-515 Summary of Abnormal Occurrences 5/74 275 Reported to the Atomic Energy

~

Commission During 1973 i

80-515 NUREG 75/090 Report to the Congress 10/75 36 on Abnormal Occurrences i

80-515 Memo to W. G. MacDonald from B. C.

4/14/76 1

Rusche Re: Continuation of Publication l

Current Events - Power Reactors and i

Bulletin Close Out Reports80-515 Memo to J. Carr from R. H. Hartfield 12/3/30 3

80-515 Letter from Eugenia L. Boyle Re:

6/4/80 107-Licensee Event Reports80-515 Important Notice to Nelson D.

Undated 1

Brown Re: Monthly Reports i

30-515 Report Re: " Current Events - Power 7/ 74 25 Reactors"80-515 Memo for R. A. Hartfield from J.

12/9/77 6

McMillen Re: Current Events Program Review 80-515 Abnormal Occurrence Reports 2/23/77 2

80-515 Note for Norman M. Haller from R. A.

6/12/78 3

Hartfield Re: Current Events, Power Reactors l

l 80-515 Note for Norman M. Haller from R. A.

3/2/79 2

Hartfield Re: Meeting with IE on Information Dissemination 80-515 Manual Chapter NRC-0137 - Organization 5/27/80 10 and Functions Offi.ce of Management and Program Analysis l

l l

I

4% -

F0IA No.

Document Description Date Pages Item 5 80-515 Letter to Morris K. Udall from Joseph 10/16/79 5

llendrie Re: letter of August 8,1979 concerning NUREG-0600 80-515 Draft Letter to Morris K. Udall from 9/11/79 9

Joseph llendrie Re: I&E Investigative Report of the TMI Accident (NUREG-0600)80-515 Memo for J. F. Streeter from J. S.

1/8/79 28 Creswell Re: Conveying New Informa-tion to Licensing Boards - Davis-Besse Units 2 & 3 and Midland Units 1 & 2 Item 10 80-515 Letter to Abraham A. Ribicoff from 7/15/75 10 E. B. Staats Re: Commissions Organiza-tional Structure Sincerely, John C. Carr, Chief Freedom of Information and Privacy Acts Branch

Enclosures:

As stated k

s

.N PR.

  • }

l Ut:ntDS3ATEs

'%.,d af /

NUCLEAR REGUL AlORY COMMISSION

.',,,/

wasmNoTou.o c. rosss t

j December *2, 1980 I

\\

\\

s, i

}

Thomas J. Madden. Esquire Kaye, Scholer, Fierman. Hays &

llandler IN RESPONSE REFER 1575 Eye Street, N.W.~.

10 T01A-80-515, 516 Mashington, DC 20005 AND 555

Dear Mr. Madden:

)

has picked up the following listed'docume

\\

{

e subject to the above-menticed Freedom of Informatio

, which are Act requests.

You will note that we' have indicated th number of pages per document in order to gnaintain a running total of the pages reproduced for billing l

purposes.

^

't

,f,'/.' ffu s

\\

. John C. Carr, Chief

/

Freedom of Information and

(

-Privacy Acts Branch

Enclosures:

As stated c

1 5'/

(f

\\

L

e i

ITEM _3 (F01A-80-516)_

NRR RESPONSE _

Date Document Description No._ Pa ges-9/77 Preliminary Notification of Event or Unusual 1

\\

Occurrence, Davis-Besse Unit No. I 10/6/77 Note to Donald J. Skovholt from R. J. McDermott 2

re: Reactor Coolant System Depressorization Event at Davis Besse-2 (08-2)

ITEM 1 (f0lA-80-555)_

OPE RESPONSE Date Document Description No. Pages 11/17/80 Note to Inter-Office Steering Group on 14 Development of a Safety Goal from George Sege re:

Working Paper on Criteria, with attachment 11/12/80 Note to Inter-Office Steering Group on 1

Development of a Sa fety Goal from Edward J.

Hanrahan, re: Third Meeting g

10/31/80 Letter to Dr. Myron Tribus from George Sege 1

10/30/80 Note to Inter-Office Steering Group on 12 Development of a Safety Goal from George Sege, with attachment 10/30/80 Note to Inter-Office Steering Group on 1

Development of a Safety Goal from Edward J.

Hanrahan, re:

Second Meeting 10/28/80 Note to Inter-Office Steering Group on 4

Development of a Safety Goal from George Sege, re: Tentative General Outline for Preliminary Policy Paper, with attachment 10/27/80 Note to Members, Interoffice Steering Group on 2

Development of a Safety Goal from Edward J.

Hanrahan, re:

First Meeting, with attachment 10/18/80 Memo for the Commissioners from Leonard Bickwit, 39 re:

Adequate Protection of the Health and Safety of the Public, with attachment i

10/10/80 Memo for the Commissioners from Edward J. Hanrahan 5

re:

Consideration of Generic Issues in Response to Section 110 of Public Law 95-265 (The Bingham Amendment) 10/80 NUREG-0735, " Plan for Developing a Safety Goal" : D 9/23/80 Memo for Chaiman Ahearne from Edward J. Hanrahan, 7

Status of Chapter V of the Action Plan 4

re:

4 l

A e

f ITEM 1 (F0!A-8_0-555), continued 0PE RESPONSE Date Document Description No. Pages 8/12/80 SECY-80-379, " Proposed Plan for Developing 29 a Safety Goal", with attachments 5/15/80 Memo for the Commissioners from Edward J.

7

!!anrahan, re:

TMI-2 Action Plan 12/18/79 Memo for the Commissioners, re:

" Comparison 25 of President's and HRC's Responses to Kemeny Commission Recomendations," from Edward J.

flanrahan 12/17/79 Memo for the Commissioners from Edward J.

10 llanrahan, re:

TMI Action Plan, with attachment 9/13/79 Memo for the Commissioners from Al Kenneke, 5

re: SECY-79-330F, Qualifications of Reactor Operators, with attachment 8/10/79 Memo for the Commissioners from Al Kenneke, 4

SECY-79-330E, Qualifications of Reactor Operators,

(

(Commission Action) 6/21/79 Memo for the Commissioners from Al Kenneke, re:

2 SECY-79-371 - Recommendations on Operational Data Analysis and Evaluation for Nuclear Power Plants (CommissionerAction) 3/5/80 Memo for Ed Hanrahan from Al Kenneke, re: AIF 2

Working Group Evaluation of TMI Action Plan Priorities Tel. Request (F01A-80-555)

Date Document Description No. Pages 11/80 NUREG-0689. " Potential Impact of Licensee Default on Cleanup of TMI-2" 9/26/80 Letter to the lionorable Jimmy Carter from the members 6 of the Nuclear Safety Oversight Comittee ITEM 6 (F01A-80-515) 1/80 NUREG-0565, " Generic Evaluation of Small Break Loss-of-Coolant Accident Behavior in Babcock & Wilcox Designed 177-FA Operating Plants" d

SAj ga rs%,Ig

+

UNITED STATES p

g

' p, NUCLEAR REGULATORY COMMISSION

f
  • C WASHWG TON, D. C. 20555

/

%,..... e November 24, 1980 Thomas J. Madden, Esquire Kaye, Scholer, Fierman, llays & llandler IN RESPONSE REFER 15'/5 Eye Street, N.W.

TO F01A-80-515 AND Washington, DC 20005 80-516

Dear Mr. Madden:

This is to confirm that a representative of your office has picked up the following listed documents, which are subject to the above-mentioned Freedom of Information Act requests. You will note that we have indicated the number of pages per document in order to maintain a running total of the pages reproduced for billing purposes.

FOIA No.

Document Description Date Pages Item No. 4 80-515 Babcock & Wilcox Licensing Experience Undated 1

80-515 Cold Shutdown Capability Undated 4

80-515 Generic Review of Feedwater Transient Undated 11 in B&W Designed Reactors80-515 Changing the Systems Outside Contain-Undated 10 ment to Vent into Containment Building 80-515 Memo for floward Daniels from Bill 9/19/78 2

LeFave Re: Identification of Safety Related Systems and Components80-515 Memo for 110 ward Danield from Scott 10/10/78 5

Newberry Re: Identification of Safety Related Systems and Components and Instrumentation to Follow the Course of an Accident 80-515 Memo for R. M. Satterfield from T. M.

12/18/78 1

Novakq: Midland ECCS Pump Trips gfl$4<wN 0

F0IA No.

Document Description Date Pages Item No. 4 80-515 Memo for T. M. Novak from R. M.

2/14/79 1

Satterfield Re: Midland ECCS Pump

,i Trips80-515 Meno for E. L. Jordan from R. C. Lewis 4/4/79 34 Re: Potential Problems Identified at Babcock and Wilcox Facilities in Regard to the TMI Occurrence 80-515 Chronology of TMI-2 3/28/79 Accident 4/5/79 33 Until Core Cooling Restored 80-515 Statement of Work 4/6/79 27 80-515 Memo for Brain Grimes from R. M.

4/7/79 12 Satterfield Re: Summary of Recent Staff Efforts to Assess Environmental Qualification of Safety Related Electrical Equipment Installed at TMI-2 80-515 Memo for R. L. Tedesco, et. al. from 4/10/79 9

Z. R. Rosztoczy Re: Generic Review of Feedwater Transients in B&W Reactors80-515 Memo for R. Tedesco from R. M.

4/11/79 8

Satterfield Re: An Assessment of Pressurizer Level Instrumentation Installed at TMI-2 80-515 Memo for R. Bernero from E. Butcher 6/15/79 1

Re: TMI-2 Incident Response 80-515 Memo for Robert W. Reid from D. C.

10/4/79 2

Dilanni Re: Spurious Reactor Scram Post TMI 80-515 Note to Harley Silver from John 11/9/79 1

Voglewede Re: Draft Safety Evaluation of Lessons Learned in TMI-1 Restart Report 80-515 Memo for Harley Silver.from Jerry 11/27/79 2

Mazetis Re: TMI-l Review 80-515 Note to H. Silver, et. al.

11/29/79 1

from J. Voglewede Re: Lessons i

Learned SER on TMI-1 Restart r

i t

FOIA No.

Document Description Date Pages Item No. 4 80-515 Memo for Steve Scott from Peichprd H.

12/5/79 19 i

Vollmer Re: TMI Unit 1 Board Notifica-tion 10 CFR 50.54 80-515 Memo.for D. F. Ross from S. L. Israel 12/5/79 2

Re: 6&W Porv Lift Frequency Before and Af ter Setpoint Changes80-515 Memo for H. Silver from G. Mazetis Re:

12/18/79 6

Status of B&O Aspect of TMI-1 Restart Review 80-515 Memo for D. Okrent from D. F. Ross Re:

12/28/79 4

TMI-2 Implications80-515 Memo for R. Vollmer from S. F.

1/25/80 9

Newberry Re: TMI-l Restart Review:

Emergency Feedwater System Capacity and Anticipatory Reactor Trip 80-515 Memo for V. Noonan from G. R. Mazetis 1/29/80 9

Re: TMI-l Pressure-Temperature Limits for Emergency Conditions80-515 Memo for Past Members of B&O Task 1/30/80 15 Force from D. Ross Re: Quantifying the Improvements in Prov Performance 80-515 Memo for H. Silver from G. Mazetis 2/6/80 3

Re: TMI-l Restart Review (DOR Interface)80-515 Memo for T. Novak from V. S. Noonan 2/11/80 1

Re: TMI-1 Emergnecy Pressure-Tempera-ture Limits80-515 Memo for H. Silver from G. Mazetis 2/15/80 2

Re: TMI-l Restart: ECCS Modification and Anticipatory Reactor Trip Parameters80-515 Memo for Robert W. Reid from D. C.

2/19/80 4

Dilanni Re: Upgrading the' Reliability of Power Operated Relief Valve (PORV)80-515 Summary of Meeting Held on 11/08/79 2/24/80 11 with B&W Owners' Group Regarding Responses to IE Bulletin 79-05C l

t e

- 4 TOIA No.

Document Description Date Pages Item No. 4 8,0-51 5 Memo for R. H. Vollmer from S. F.

2/27/80 3

i Newberry Re: TMI-1 Restart Review:

Anticipatory Reactor Trip 80-515 Memo for liarley Silver from Jared 2/28/80 2

Wermiel Re: TMI-1 Restart Review, 1

Automatic Initiation of Emergency Feedwater (EFW)80-515 Memo for liarley Silver from Jared 3/5/80 2

Wenniel Re: THI-1 Restart Review, Application of SRP Section 10.4.9 80-515 Memo for R. H. Vollmer from G. R.

3/12/80 12 Mazetis Re: TM1-1 Restart Review 80-515 Note for G. R. Marctis from S. F.

3/13/80 1

Newberry Re: TMi-1 Restart Review Status'- Emergency Feedwater and liigh Pressure Injection Flow Rates80-515 Memo for H. Silver from R. Fitzpatrick 3/25/80 1

Re: TMI Manual Control of PORV 80-515 Memo for D. F. Ross from B. W. Sheron 4/17/80 13 Re: Status of Reactor Coolant Pump Trip and Effect on Non-LOCA Dcpressurizing Transients Item No. 5 80-515 Memo to Richard C. DeYoung Undated 2

from Richard H. Vollmer Re: TMI Unit 2. SER Input 80-515 Draft memo to D. Vassallo from Lewis G. Undated 7

Ilulman Re: Revised Safety Evaluation Report Input - Meteorology 80-515 Memo to Richard C. DeYoung Undated 7

from Richard H. Vollmer Re: TMI Unit 2. SER Input 80-515 Memo for D. B. Vassallo from J. P.

Undated 5

Knight Re: TMI Unit 2 OTSG Instrumen-tation for Vibration Measurement

F0IA No.

Document Description Date Pages Item No. 5-80-515 TMI-2 Technical Specifications Undated 1

\\

80-515 Note to Harley from Mike Tokar 1/4 3

Re: Rough Draft on Design Evaluation 80-515 Note to liarley from Dick Kiessel Re:

12/1 5

TMI-2 Vent Valves80-515 Memo to K. Kniel from Richard H.

3/5/74 4

Vollmer Re: Preliminary Review of FSAR for TMI Unit 2, Quality Assurance

~

80-515 Note to R. L. Tedesco from S. Cummins 3/6/74 6

Re: QA Plan for Operations80-515 Letter to Robert C. Arnold from A.

3/12/74 2

Schwencer Re: Operating Quality Assurance Plan 80-515 Memo to Roger S. Boyd from Donald J.

4/29/74 1

Skovholt Re: Independence of QA for TMI, Unit 1 80-515 Memo to Roger S. Boyd from Donald J.

7/24/74 1

Skovholt Re: Independnece of QA for THI, Unit 2 80-515 Memo to K. Kniel from Richard Vollmer 2/12/75 3

Re: Regulatory Staff Positions -

TMI, Unit 2 - QA, Conduct of Operations80-515 Memo to George F. Lear from Richard H.

2/13/75 1

Vollmer Re: Administrative Section of Technical Specifications. TMI-1 80-515 Memo to K. Kniel from Richard H.

3/18/75 5

Vollmer Re: Regulatory Staff Postions -

TMI, Unit 2 - QA, Initial Test Program 80-515 Letter to R. C. Arnold from George Lear 4/24/75 3

Re: Quality Assurance Activities80-515 Memo to V. A. Moore from Do'nald J.

6/30/75 8

Skovholt Re: Safety Evaluation Report i

l l

l L

6 r..

F0IA No.

Document Description Date Pages Item No. 5 80-515 Memo -to V. A. Moore from Donald J.

8/26/75 5

Skovholt Re: Response to Standard i

Review Assignment 80-515 Memo to V. A. Moore from Harold R.

9/5/75

~

8 Denton Re: Safety Evaluation Report Input - Meteorology 80-515 Memo to Voss A. Moore from Harold R.

9/11/75 1

Denton Re: Safety Evaluation Report 80-515 Memo to Voss A. Moore from Harold R.

9/11/75 5

Denton Re: Safety Evaluation Report 80-515 Letter to V. A. Moore from Victor 9/15/75 19 Stello, Jr., Re: SER Input for TMI-2 80-515 Memo to Voss A. Moore from Harold R.

9/16/75 1

Denton Re: Hydrologic Engineering Summary 80-515 Memo to Voss A. Moore from Harold R.

9/16/75 10 Denton Re: Hydrologic Engineering Surmiary 1

80-515 Memo to H. R. Denton from Donald J.

10/3/75 1

Skovholt Re: Organizational Matters for TMI-2 80-515 Memo to V. A. Moore from Robert L.

10/3/75 2

Tedesco Re: Safety Evaluation Report Input for TMI, Unit 2 80-515 Memo to V. A. Moore from Robert L.

10/3/75 23 Tedesco Re: Safety Evalution Report Input for TMI Unit 2 80-515 Memo to V. A. Moore from R. R. Maccary 10/6/75 2

Re: Safety Evaluation Report of FSAR -

THI, Unit 2 80-515 Memo to V. A. Moore from R. R.

10/6/75 14 Maccary Re: Safety Evaluation Report of FSArc - TMI, Unit 2 80-515 Memo to Voss A. Moore from R. R.

10/8/75 3

Maccary Re: Metropolitan Edison Company TMI, Unit 2

-7 F0IA No.

Document Description Date Pages Item No. 5 80-515 Memo to Daniel R. Muller from Harold R. 10/10/75 1

Denton Re: DES Input from the Cost-i Benefit Analysis Branch 80-515 Memo to V. A. Moore from R. R. Maccary 10/14/75 1

Re: SER 80-515 Memo to Voss A. Moore from R. R.

10/14/75 12 Maccary Re: Safety Evaluation Report 80-515 Memo to Voss A. Moore from Harold R.

10/15/75 3

Denton Re: Draft SER Input - Geology, Seismology, and Foundation Engineering 80-515 Memo to K. Kniel from Paul F. Collins 11/3/75 3

Re: Response to Review Plan Assignment 80-515 Memo to Vass A. Moore from Robert L.

11/5/75 2

Tedesco Re: Safety Evaluation Report 80-515 Memo to Voss A. Moore from Robert L.

11/5/75 27 Tedesco Re: Safety Evaluation Report 80-515 Memo to V. A. Moore from Donald J.

11/11/75 2

i Skovholt Re: Response to Standard Review Assignment 80-515 Memo to Voss A. Moore from Robert L.

11/17/75 3

Tedesco Re: Draft Safety Evaluation Report 80-515 Memo to Voss A. Moore from Robert L.

11/17/75 13 Tedesco Re: Draft Safety Evaluation Report I

80-515 Memo to Voss A. Moore from Harold R.

11/25/75 1

1 Denton Re: TMI, Unit 2, SER Input 80-515 Memo to Voss A. Moore from Victor 12/23/75 6

Stello, Jr., Re: Safety Evaluation Report 80-515 Memo to R. C. DeYoung from R. R.

1/4/76 11 Maccary Re: Safety Evaluation Report (Structural)

~

r P3 es F0IA No.

Document Description Date Item No. 5 80-515 Memo from llarley Silver Re: Sumary 1/9/76 19 of Meeting on Open Items g

80-515 Letter to R. C. DeYoung from R. R.

2/4/76 1

Maccary Re: Safety Evaluation Report (Structural)80-515 Memo to Richard C. DeYoung from D. F.

2/6/76 2

Ross Re: Three Mile Island SER Input 80-515 Memo to K. Kniel from John W. Gilray 2/6/76 2

Re: Information Pertaining to Full Control Rod Scram Insertic, Times80-515 Memo to Richard C. DeYoung from D. F.

2/6/76 22 Ross Re: TMI-2. SER Input 80-515 Memo to Thomas A. Ippolito from 3/15/76 7

Frank Ashe Re: Sumary Meeting with Representatives for TMI, Unit 2 80-515 Memo to R. C. DeYoung from Robert L.

3/23/76 6

Tedesco Re: Request for Additional Information on TMI-2 80-515 Memo to Karl Kniel from C. J. Heltemes 4/14/76 3

Re: Initial Test Program 80-515 Memo to Voss A. Moore from Jim Watt 5/4/76 1

Re: Three Mile Island 2 SER Input 80-515 Memo to Richard C. DeYoung from 5/13/76 5

Richard C. Vollmer Re: Three Mile Island, Unit 2 SER Input 80-515 Memo to Richard C. DeYoung from 5/14/76 5

Donald J. Skovholt Re: Met Ed, Safety Evaluation Report for Initial Tests and Operation 80-515 Note to liarley Silver and Charlie 5/18/76 3

Ferrell from Ken Murphy Re: TMI-2 SER Input 80-515 Memo to R. C. DeYoung from W. P.

5/18/76 3

Gammill Re: Revision to flydrologic Engineering Summary

.g.

F0IA No.

Document Description Date_

Pages_

j Item No. 5_

80-515 Memo to R. C. DeYoung from Donald J.

5/27/76 4

Skovholt Re: Safety Evaluation Report

\\

Conduct of Operations80-515 Memo to Richard C. DeYoung from Richard 6/8/76 5

Vollmer Re: TMI-2 SER Input 80-515 Memo to R. C. DeYoung from R. R.

6/10/76 5

Maccary Re: Met Ed Company, TMI-2 80-515 Memo to R. C. DeYoung from Robert L.

7/21/76 3

Tedesco Re: Safety Evaluation Report Auxiliary and Power Conversion Systems Branch 80-515 Memo to R. C. DeYoung from J. P. Knight 7/26/76 1

Re: Safety Evaluation Report of FSAR 80-515 Note to H. Silver from C. Ferrell 7/26/76 14 Re: Containment Spray System & LOCA dose analysis80-515 Memo to R. C. DeYoung from Robert L.

8/3/76 3

Tedesco Re: Safety Evaluation Report Auxiliary and Power Conversion Systems Branch i

i 80-515 Memo to R. C. DeYoung from J. P.

8/4/76 1

I Knight Re: Amendment No. 43 80-515 Draft memo to Richard DeYoung from 8/5/76 7

Richard Vollmer Re: TMI-2 SER Input 80-515 Memo to Richard C. DeYoung from Richard 8/6/76 7

Voilmer Re: TMI-2 SER Input 80-515 Memo to Richard DeYoung from D. F.

8/5/76 25 Ross Re: TMI-2 SER Input Update 80-515 Memo to Richard DeYoung from D. F.

8/6/76 23 Ross Re: THI-? SER Update 80-515 Memo to D. Vassallo from Lewis G.

8/12/76 7

Hulman Re: Revised Safety Evaluation Report Input - Meteorology

F0IA No.

Document Description Date Pages Item No. 5 80-515 Memo for D. B. Vassallo from R. Vollmer 10/27/76 14 Re: Supplement to the SER for TMI-2 i

Regarding Compliance with Appendix I 80-515 Memo for S. Varga from C. J. Heltemes 11/4/76 1

Re: Review Amendment for QA to TMI-2 80-515 Memo for S. A. Varga from C. J.

11/19/76 1

lleltemes Re: Review knendment for QA to TMI 80-515 Memo for S. Varga from i.. G.

11/24/76 2

Ilulman Re: Ilydrologic Engineering SER Supplement Input 80-515 Memo for D. B. Vassallo from D. F.

11/24/76 5

Ross Re: SER Supplement for TMI-2 80-515 Memo for Steven A. Varga from Donald 11/29/76 6

Skovholt Re: Analysis Prepared by Tom Noonan 80-515 Memo for Steven Varga from C. J.

12/2/76 3

Heltemes Re: Conduct of Operations80-515 Note to liarley Silver from R. Wayne 12/22/76 2

Houston Re: TMI Station Security Plan 80-515 Hand Written Notes from Siegel Re:

12/22/76 2

B&W Fuel Rod Design 80-515 Memo for D. B. Vassallo from J. P.

12/23/76 3

Knight Re: Reactor Vessel Support Analysis I

80-515 Memo for S. A. Varga from L. G. Ilulman 12/27/76 5

Re: Meteorological Supplement to the SER for TMI-2 80-515 Note to H. Silver from P. Stoddart Re:

1/11/77 3

TMI-2 Charcoal Bed Iodine Retention Tests80-515 Memo for Domenic B. Vassallo from 1/28/77 5

Richard H. Vollmer Re: TMI-2, SER Supplemental Input

_11 F_01 A fio.

Document Description Date Pages Item fio. 5 80-515 Memo for Domenic Vassallo from Robert 2/3/77 21 Tedesco Re: Instrumentation Control

\\

and Electric Power Systems80-515 flemo for Domenic Vassallo from Richard 2/11/77 3

Vollmer Re: SER Supplemental Input 80-515 Memo for Domenic Vassallo from Richard 2/16/77 6

Vollmer Re: SER Supplemental Input 80-515 Memo for J. Shapaker from C. P. Tan 3/3/77 1

Re: TMI-2 Reactor Cavity Analysis80-515 Memo for D. Vassallo from R. L. Tedesco 3/16/77 5

Re: Revision of the Draft Safety Evaluation Report for TMI-2 80-515 Memo for S. A. Varga from C. J.

4/26/77 4

Heltemes Re: Response time Testing of Reactor Protection System for TMI-2 80-515 Memo for D. B. Vassallo from Donald J.

5/6/77 2

Skovholt Re: TMI-2, Safety Evaluation Report, Conduct of Operations80-515 Memo for S. A. Varga from C. J.

5/27/77 1

Heltemes Re: Review of Met Ed Amendments for QA to TMI-2 80-515 Memo for Domenic B. Vassallo from R. L. 6/29/77 2

Tedesco Re: Safety Features Actuation System Output Relays80-515 Memo for D. B. Vassallo from D. F.

8/15/77 6

Ross Re: TMI-2. SER Supplement 80-515 Memo for D. Vassallo from Robert L.

8/16/77 17 Tedesco Re: Low Grid Voltage and Class lE Electrical Equipment Qualification (OutsideContainment)80-515 Memo for D. B. Vassallo.from Donald 8/22/77 2

Skovholt Re: Supplement to Safety Evaluation Report for Initial Tests and Operation

o

. [01A No.

Document Description Date Pages Item No. 5 80-515 Memo for Karl R. Goller from Brian K.

9/26/77 22 Grimes Re: Spent Fuel Pool Expansion

\\

80-515 Memo for D. B. Vassallo from D. F.

11/10/77 3

Ross Re: Draft Safety Evaluation for TMI-2 80-515 Note to H. Silver from W. Jensen 11/17/77 2

Re: Documentation Concerning the EWHAM code 80-515 Memo for D. Vassallo from R. L.

12/9/77 3

Tedesco Re: Revision to Draft Safety Evaluation Report 80-515 Memo for D. B. Vassallo from R. O.

12/29/77 9

Meyer Re: SER Supplement Concerning Burnable Poison Materials80-515 Memo for D. B. Vassallo from R. L.

1/17/78 2

Tedesco Rc: Supplement No. 3 to the THI-2 SER 80-515 Memo for D. B. Vassallo from D. F.

1/25/78 2

Ross Re: THI-2, Cycle 1, Steam Line Break 80-515 Hand Written Notes Re: Filter Spec 2/3/78 1

80-515 Note to Harley Silver frora P. Stoddart 2/6/78 1

Re: ETSB Review of Proposed Technical Specification 80-515 Memo for G. Knighton from J. T. Collins 1/22/79 19 Re: Amendment to Operating License 80-515 Summary of Telephone Call with James R. 9/18/79 1

Seelinger by Ronald R. Bellamy 80-515 Memo for R. Reid from G. Knighton Re:

9/27/79 7

Fuel Handling Accident Inside-Contain-ment 80-515 Memo for Harley Silver from Walter P.

10/5/79 5

Haass Re: TMI-1 Review 80-515 Memo for Harley Silver from Walter P.

10/11/79 2

Haass Re: TMI-l Restart Review

r F0IA No.

Document Description Date Pages Item No. 5 80-515 Memo for R. Reid from G. W. Knighton 10/17/79 5

Re: R.G.1.52 Type Ventilation Filter i

Tech Specs80-515 Memo for liarley Silver from Walter P.

10/30/79 2

Haass Re: TMI-1 Review 80-515 Memo for Harley Silver from Walter P.

11/21/79 6

Haass Re: TMI-1 Review 80-515 Memo for liarley Silver from Donald J.

12/7/79 8

Skovholt Re: Quality Assurance SER Supplement for TMI-1 80-515 Memo for liarley Silver from Donald 12/7/79 7

Skovholt Re: Organizational and Administrative Controls SER Input for TMI-1 Restart 80-515 Memo for G. W. Knighton from R. L.

12/13/79 2

Bangart Re: Amendment.to Operating License on Air Treatment Systems80-515 Memo for R. W. Reid from G. W.

12/28/79 2

Knighton Re: Amendment to Operating License on ESF Filter 80-515 Memo for R. W. Reid from G. W.

1/7/80 1

Knighton Re: THI-1 Technical Specifications Change Request 80-515 Memo for Harley Silver from Walter 2/4/80 9

Haass Re: TMI-1 Restart Review 80-515 Memo for R. W. Reid from George W.

2/28/80 18 Knighton Re: Amendment to Operating License on ESF Filter 80-515 Memo for Harley Silver from Walter P.

4/30/80 13 Haass Re: Quality Assurance SER Supplement for TMI-1 Item No. 6 80-515 Testimony of P. R. Mathews regarding Undated 36 Adequacy of the Pressurizer and Pressurizer Relief Tank Size

14 F0IA No.

Document Description Date Pages Item No. 6 80-515 Handwritten notes re: LOFW Information Undated 3

on Various Nuclear Power Plants

\\

80-515 Emergency feed System Information on Undated 18 Oconce 1, 2, & 3 80-515 Difference between TMI-2 and Other Undated 18 Nuclear Power Plants80-515 Memo for S. Varga from Faust Rosa Re:

2/15 2

Additional Second Round Question 80-515 Memo for R. A. Purple et. al. from 3/12/76 5'

A. Schwencer Re: ECCS Reviews in the Electrical Instrumentation and Controls Areas80-515 Memo for Tom Cox from G. Mazetis Re:

1/13/77 3

B-SAR-205 Schedule 80-515 Memo for G. Mazetis from Thomas A.

3/23/77 8

Ippolito Re: ECCS and Decay Heat Removal Systems Reviews in I&CSB Areas for B-SAR-205 80-515 Memo from Thomas H.

4/12/77 11 Cox Re: Summary of Meeting to Discuss System Operating Sequence Diagrams &

Failure Modes & Effects Analyses, BSAR-205 80-515 Memo for T. H. Novak from R. O. Meyer 5/3/77 3

Re: Fuel Damage Acceptance Criteria for B-SAR-205 Main Line Steam Break Analysis80-515 Memo for Olan D. Parr from Thomas Cox 5/16/77 1

Re: BSAR-205 Schedule 80-515 Memo for Gordon Chipman from G. R.

5/24/77 1

Mazetis Re: Main Steam Line Break and Reactor Coolant Pump Locked Rotor Accident Dose Calculations for B-SAR-205 80-515 Memo for Domenic Vassallo from D. F.

6/28/77 55 Ross Re: Safety Evaluation Report -

Standard Nuclear Steam System, B-SAR-205 t

O

.-. FOIA No.

Document Description Date Pages Item No. 6 80-515 Memo from Thomas Cox Re:

7/22/77 6

Meeting Sumnary of Staff Positions i

on Two Outstanding Issues in BSAR-205 Review 80-515 Memo for T. Cox from G. R. Mazetis 8/19/77 2

Re: RSB Status of B-SAR-205 Items80-515 Memo for D. B. Vassallo from T. M.

9/6/77 3

Novak Re: B-SAR-205 Open Items80-515 Memo for James Knight et. al. from 9/14/77 2

Domenic B. Vassallo Re: Final SER Input on BSAR-205 80-515 Note to D. Ross from Scott Newberry 9/20/77 5

Re: Estimate of the B-SAR-205 Input Schedule 80-515 Memo for T. Cox from'G. R. Mazetis 9/22/77 2

Re: B-SAR-205 Open Issue on Provisions for Shutdown 80-515 Memo for D. B. Vassallo from G. R.

9/28/77 7

Mazetis Re: Acceptance Review of the Consumers Power Co. Midland Plants 1 and 2 FSAR 80-515 Memo for T. M. Novak from Z. R.

10/11/77 2

Rosztoczy Re: B&W and GE Systems Transient Code Checkout Requirements80-515 Memo for D. B. Vassallo from D. F.

10/21/77 5

Ross Re: Open Issues on Pebble Springs80-515 Memo for S. Varga from R. J. Bosnak 11/7/77 3

and I. S. Sihweil Re: Review of Topical Report BAW 10131 i

80-515 Memo for D. B. Vassallo from D. F.

11/8/77 10 l

Ross Re: SER Input for B-SAR-205 80-515 Letter for S.

A.' Varga from Joseph L.

11/30/77 55 l

Williams Re: 26 Questions Raised by the ACRS on the Pepple Springs Applica-tion l

, F0IA No.

Document Description Date Pages Item No. 6 80-515 Memo for Thomas Cox from Gerald 2/8/78 1

Mazetis Re: B-SAR-205 ECCS Review

\\

80-515 Memo for D. B. Vassallo from D. F.

2/10/78 23 Ross Re: SER Supplement Input for Pebble Springs Units 1 and 2 80-515 Memo for D. B. Vassallo from G. R.

3/8/78 15 Mazetis Re: First Round Questions -

Midland Plants Units 1 and 2 80-515 Memo for D. B. Vassallo from G. R.

3/9/78 4

Mazetis Re: First Round Questions -

Midland Plants Units 1 and 2 80-515 Routing Slip for B. LeFane, et. al.

3/13/78 3

from D. Ilood Re: Mazetis memo of 3/9/78 80-515 Memo for D. B. Vassallo from P.

E.*

3/13/78 3

Norian Re: First Round Questions Midland Plants Units 1 & 2 on Steamline Break and Feedline Break Analysis80-515 Routing Slip to Scott Newberry 3/16/78 2

from Darl llood Re: B&W Emergency Core Cooling System Problem 80-515 Memo for Tom Cox from T. Ippolito 3/16/78 1

Re: B-SAR-205 Design Change in Main Steam Line Isolation 80-515 Memo for D. B. Vassallo from D. F.

4/4/78 9

Ross Re: SER Input for BSAR-205 80-515 Memo for D. B. Vassallo from D. F.

4/23/78 3

Ross Re: SER Supplement Input for Pebble Springs Units 1 and 2 80-515 Memo for D. B. Vassallo from D. F.

4/24/78 4

Ross Re: Additional Partial Loop Operation Analyses for TMI-2 80-515 Memo for S. A. Varga from T. M. Novak 5/15/78 4

Re: ASLB Questions on Pebble Springs u

_17 i

FOIA No.

Document Description Date Pages Item No. 6 80-515 Memo for D. B. Vassallo from D. F.

5/23/78 3

Reds Re: Evaluation of the Effect of

\\

a Change in the Flow Maldistribution Factor on DNB for B&W 250 Fuel Assembly 80-515 Memo for Darl Hood from G. R. Mazetis 6/26/78 1

Re: Midland Units 1 and 2 Small Break Analysis80-515 Memo for W. Brooks et. al. from H. A.

9/8/78 1

Daniels Re: Identification of Safety Related Systems and Equipment for Midland 1 & 2 80-515 Memo for W. Brooks et. al. from H. A.

9/8/78 1

Daniels Re: Identification of Safety Related Systems and Equipment for Midland 1 & 2 80-515 Memo for W. LeFave from H. A. Daniels 9/8/78' 1

Re: Midland 1 & 2 Instrumentation to Follow the Course of an Accident 80-515 Memo for D. B. Vassallo from D. F.

9/28/78 23 Ross Re: Second Round Questions -

Midland Plant Units 1 and 2 80-515 Memo for S. Varga from R. M.

10/2/78-21 Satterfield Re: Midland Plant Units 1 & 2. First Round Questions80-515 Memo for D. B. Vassallo from Frank 10/11/78 4

Schroeder Re: SER Supplement Input for Pebble Springs Units 1 and 2 80-515 Memo for D. B. Vassallo from Frank 10/26/78 4

Schroeder Re: Supplemental Second Round Questions - Midland Plant Units 1 and 2 80-515 Memo for S. Varga from Faust Rosa 12/21/78 5

Re: Supplemental Second Round Questions for Midland Nuclear Station, Units 1 and 2 80-515 Memo for D. B. Vassallo from R. L.

12/27/78 8

Tedesco Re: Second Round Questions -

Midland Plant Units 1 and 2 W_

. i 8

Date Pages FOI A flo._

Document Description _

Item fio. 6

~

80-515 Memo for Darl llood from Gerald R.

1/19/79 3

L Mazetis Re: RSB Open Items on Midland I

1 and 2 80-515 Memo for D. B. Vassallo from R. L..

1/19/79 5

Tedesco Re: Request Additional 1

Information for B&W's Steam Generator Analysis Code TRAP-2 Memo for R. Satterfield from D. Tondi 1/25/79 3

80-515 Re: Instrument Piping on Reactor Coolant Flow Transmitters RPS, B&W Plants Memo for Domenic Vassallo from Darrell 1/26/79 3

80-515 Eisenhut Re: B&W Interim Procedure for Calculating DilBR Reductions Due to Rod 80W 80-515 Memo for S. A. Varga from Walter P.

2/28/79 16 llaass Re: Staff Positions and Requests for Additional Information on Midland Plant Units 1 & 2 Initial Test Program 80-515 Memo for D. Ilood from floward Daniels 2/28/79 5

Re: Midland Plant Units 1 & 2 Open Items80-515 Memo for C. M. Farrell from S. F.

3/12/79 3

flewberry Re: ECCS Passive Failure Leak Rate Memo for P. S. Check from T. M. flovak 3/16/79 1

80-515 Re: Review of BAW-1461 " Reactivity Insertion Assumptions Used in Safety Analysis Calculations"80-515 Memo for S. Varga from R. M.

3/20/79 13 I

Satterfield Re: Midland Plant Units 1 & 2 Second Round Questions80-515 Memo for I. R. Rosztoczy from T. M.

3/26/79 1

flovak Re: Review of TRAP-2 (BAW-101E8)80-515 Auxiliary Feed System - Oconee Plant 4/3/79 2

1, 2, and 3 e

u Date Pag;_s, Document Description F0I A No._

Item No. 6 4

4/7/79 Telecopier Transmittal Request to 80-515 Ed Butcher from Jim Taylor Re: Loss I

of Feedwater Analysis Summary 4

7/20/79 Memo for N. Dye and 3. Elam fromTHI-2 Mini i

80-515 A. Ignatcnis & S. Newberry Re:

+

Removal System Preliminary Decay lleat Design Criteria, Revision A 1

7/31/79 Memo to B. Elam from E. C. Dye 80-515 Mini Decay iteat Removal Re:

System Tie-In

~

l 7/31/79 Memo to B. Elam from E. C. Dye 80-515 Mini Decay iteat Removal System -

Re:

Isolation Valve Motor Operators 2

8/14/79 Letter to Robert Arnold from John T.80-515 Collins Re: MOHR System 2

9/7/79 Letter to John tierbein from J. T.80-515 Collins Re: Power Supply for MDHR Pump Motors 3

1/30/80 Memo for H. Silver from G. Mazetis TMI-l Implementation of NUREG-0565 80-515 Re:

" Generic Evaluation of Small Break LOCA Behavior in B&W Designed 177-FA Operating Plants" 5/20/80 7

Memo for J. T. Collins from R. G.

Fitzpatrick Re: Proposed Modifications 80-S15 to the THI-2 B0P Power System Various dates 238 B&W Standard Nuclear Steam System 80-515 B-SAR-205 Work Book Item No. 8_

4/29/80 5

Routing Slip to R. H. Vollmer from John T. Collins Re: Relief from 50.55a 80-515 Requirement

_ Item No. 9 Undated 40 Report on Pressurizer Level Indication 80-515 a

r

. F0IA No.

Document Description Date Pages Item No. 9 80-515 Memo to H. Silver from Robert J.

10/16/75 1

McDermott Re: Review of Amendments

\\

80-515 Memo for D. B. Vassallo from R. L.

12/20/78 2

Tedesco Re: Safety Evaluation of Proposed Change to the Technical Specifications for TMI-2 80-515 Routing Slip to Jim Watt from Rod S.

4/18/79 11 Re: Changes to Conclusions Regarding Pressurizer Level Instrumenta tion 80-515 Memo to R. L. Tedesco from W. R. Butler 7/30/79 6

Re: CSB Review of Containment Isolation Provisions for THI-2 80-516 Letter to Victor Stello, Jr., from 5/20/80 19 D. E. C iilbert, with attachments80-516 NUREG-0510. " Identification of 1/78 Unresolved Safety Issues Relating to Nuclear Power Plants"80-516 Letter to The !!onorable Walter Mondale 12/30/77 2

from Joseph M. liendrie, transmitting NUREC-0410 to Congress80-516 NUREG-0410. "NRC Program for the 1/1/78 Resolution of Generic Issues Related to Nuclear Power Plants (Includes Plans for the Resolution of " Unresolved Safety Issues" Pursuant to Section 210 of the Energy Reorganization Act of 197A, as Amended)80-516 NRR - TMI site file index Undated 15 80-516 Office of the General Counsel File 3/19/80 16 Index 80-516 Standard Subject Identification 1/1/79 71 Numbering System (SSINS) Basic Code M

' i F0IA No.

Docunent Description Date Pages80-516 Standard Subject Identification 6/1/78~

110 l

Numbering System (SSINS) Basic Code Si cerely, I

}

h/,vV John C. Carr, Chief Freedom of Information and Privacy Acts Branch

/

Enclosures:

As stated s

9 9

7 i

b

'.9. >

UNITED STATES

[\\'

'g NUCLdAR REGULATORY COMMISSION C

WASHi> GTON, D. C. 20555 s

%,,,, *#j s

Nover.ber 10, 1980 i

Thomas J. Madden, Esquire Kaye, Scholer, Fierman, Hays & Hanc'ler IN RESPONSE REFER 1575 Eye Street, N.W.

TO F01A-80-515 AND Washington, DC 20005 80-516

Dear Mr. Madden:

This is to confirm that a representative of your office has picked up the following listed documents, which are subject to the above-mentioned Freedom of Information Act requests.

You will note that we have indicated the number of pages per document in order to maintain a running total of the pages reproduced for billing purposes.

F0IA No.

Document Description Date Pages80-515 Memo from D. F. Ross to V. A.

1/16/76 9

Moore,

Subject:

Topical Report Evaluationt BAW-10103, "ECCS Analysis of B&W's 177-FA Lowered-Loop NSS."80-515 Telecopy from B&W to G. R. Mazetis 12/16/76 32 (NRC),

Subject:

Small Break LOCA Analysis for Crystal River 3.80-515 Memo from Z. R. Rosztoczy to 1/24/77 2

J. F. Stolz,

Subject:

Review of B&W Small Break Analysis for 177 Lowered Loop NSS.80-515 Memo from D. F. Ross to D. B.

2/3/77 5

Vassallo,

Subject:

Letter Report Evaluation - B&W Small Break Analysis for 177-FA Lowered Loop NSS.80-515 Memo from D. F. Ross to D. B.

5/2/77 2

Vassallo,

Subject:

To Evaluation (TAR-1677)pical Report "ECCS Evaluation of B&W's 205-FA NSS."80-515 Memo from D. F. Ross to T. Novak 5/10/78 29 (et al),

Subject:

Proposed Model Cha hges to B&W ECCS Model.

6O? b

F0IA N.4.

Document Description Date Pages80-515 Meeting agenda

Subject:

B&W S:,all 5/18/78 1

Break LOCA Analysis (2772 MWt Interim Fix).80-515 Memo from D. F. Ross to D.

6/1/78 8

\\

Eisenhut,

Subject:

Review of Proposed B&W Small Break Model Modifications.80-515 Notes from Telecon R. Audette 6/2/78 10 (ERC) and H. Baily/R. Jones (B&W)

Subject:

Small Break Model Change Questions.80-515 Federal Register Notice of TMI-2 6/5/78 4

Order for Modification of License.80-515 Supplementary information to the 6/9/78 33 proposed model modifications in the letter from Taylor (B&W) to Varga (NRC) of 5/26/78.80-515 Memo from D. F. Ross to D. B.

6/8/78 9

Vassallo,

Subject:

Review of Proposed B&W Small Break ECCS Evaluation Model Modifications.80-515 Memo from Z. R. Rosztoczy to 7/5/78 3

D. F. Ross,

Subject:

B&W Small Break ECSS Model.80-515 Notes from Telcon R. Audette (NRC) 7/7/78 5

and R. Jones (B&W),

Subject:

B&W Small Break Model.80-515 Memo from D. F. Ross to D. B.

7/20/78 10 Vassallo,

Subject:

Review of Proposed B&W Small Break ECCS Evaluation Model Modifications.80-515 Memo from T. Novak to Z. Rosztoczy 7/25/78 1

Subject:

B&W Code Review.80-515 Memo from D. F. Ross to D. B.

8/10/78 8

Vassallo,

Subject:

Topical Report Evaluation, BAW-10102 "ECCS Evaluation of B&W's 205-FA NSS."80-515 Letter from S. A. Varga (NRC) 9/5/78 11 to J. H. Talyor (B&W),

Subject:

Evaluation of BAW-10104, Rev. 4.

F01A No.

Document Description Date Pages80-515 Memo from P. S. Check to R. W.

9/12/78 1

Reid,

Subject:

B&W Small Break F0AM Analysis,80-515 Letter from Suhrke (B&W) to S. A.

10/8/76 9

Varga (tiRC),

Subject:

Additional Analysis of the Transition Break (0.5 square feet).

u 80-515 Memo from H. Baily (B&W) to G. R.

11/11/76 19 i

Mazetis (flRC),

Subject:

Small-Break

')

Analysis-BAW10103.80-515 Letter from K. W. Suhrke (B&W) to 12/17/76 32 S. A. Varga (NRC),

Subject:

Additional ECCS small break analysis for B&W's 177 FA Lowered-Loop NSS.

i 80-515 Letter from J. T. Rodgers (FPC) to 1/6/77 2

J. Stolz (NRC),

Subject:

Stating applicability of reference 5 above to Crystal River 3.80-515 Letter from J. H. Taylor (B&W) to 5/1/78 17 R. L. Baer (NRC),

Subject:

Analysis of Small Breaks in the RCP Discharge a

Piping for B&W Lowered loop 177 FA Plants.

E 80-515 Letter from J. H. Taylor (B&W) to 5/26/78 31 S. A. Varga (NRC),

Subject:

Proposed a

Modifications to B&W's ECCS Evaluation Model.80-515 Letter from J. H. Taylor (B&W) to 6/19/78 10 S. A. Varga (NRC),

Subject:

Additional ECCS Small Break analysis for 177-FA Lowered-loop NSS.80-515 Letter from J. H. Taylor (B&W) to 7/10/78 2

D. F. Ross (NRC), Sub; :ct: ECCS Model Changes.

2 80-515 Letter from J. H. Taylor (B&W) to 7/18/78 11 S. A. Varga (F J),

Subject:

Additional ECSS Small Break Analysis for 177 FA Lowered-loop NSS.80-515 Memo from F. G. Pagano to R. W. Reid 9/3/80 1

A

Subject:

TMI-l Emergency Plan.

=

F0IA No.

Document Description Date Pages80-515 Letter from J. H. Taylor (B&W) to 8/11/78 7

S. A. Varga (NRC),

Subject:

Supplementary Report in Support of Small Break Analyses Submittal.

\\

80-515 Letter from R. W. Reid from R. C.

9/8/80 4

Arnold,

Subject:

Emergency Plan for TMI-1.80-515 Letter from R. W. Reid from R. C.

10/14/80 2

Arnold,

Subject:

TMI, Unit 1.80-515 Memo from D. G. Eisenhut from K. R.

4/77 11 Goller,

Subject:

Safety Evaluation -

TMI Unit 1 Cycle 3 Reload.80-515 Note from Charles Ferrell to J. Read, 10/5/76 3

K. Campe, P. Tam, and W. Pascoag.80-515 Letter from Harley Silver to those 9/11/75 3

on attached list,

Subject:

TMI-2 Ser Inputs.80-515 Memo from H. R. Denton to V. A. Moore 11/25/75 19

Subject:

TMI Accident Analysis.80-515 Letter from A. Schwencer to Babcox &

9/20/74 2

Wilcox,

Subject:

Topical Report Evaluation.80-515 Letter from A. bchwencer to K. E.

7/30/75 5

Suhrke,

Subject:

Topical Report Evaluation.80-515 Letter from A. Schwencer to K. E.

12/22/75 4

Suhrke,

Subject:

Topical Report Evaluation BAW-10073.80-515 Memo from V. Stello to V. A. Moore 11/19/74 5

Subject:

Topical Report Evaluation.80-515 Letter from S. A. Varga to J. H.

2/13/78 4

Taylor,

Subject:

Evaluation of BAW-10095, Revision 1.80-515 Letter from A. Schwencsr to K. E.

1/8/76 11 Suhrke,

Subject:

Topical Report BAW-10104,80-515 Memo from D. F. Ross for D. B. Vassallo 3/8/78 4

Subject:

Babcock and Wilcox Reflook Model Changes.

F0IA No.

Document Description Date Pages80-515 Letter from S. Varga to K. E. Suhrke 2/18/77 6

Subject:

Evaluation of BAW-10103.80-515 Letter from S. Varga to K. E. Suhrke 2/18/77 6

Subject:

B&W ECCS Evaluation Model.80-515 Memo from B. F. Ross for D. B. Vassallo 5/5/77 3

Subject:

Error Corrections in the Craft 2 Code.80-515 Commissioner Action 11/28/79 24 80-515 SECY-77-130B 1/19/78 18 80-516 Memo for John F. Ahearne from 4/2/80 2

James J. Cummings, Re: Babcock and Wilcox (B&W) Investigations - Review far Criminality.80-516 Memo for The commissioners from 3/25/80 13 Victor Stello, Jr., Re: Babcock and Wilcox llandling of Information Relative to the Resporde to B&W PWRs to Small LOCAs.80-516 NMSS File Index - several sections undated 54 80-516 0CA Filing Codes undated 8

'80-516 Documentation Relating to Event of undated 7

September 24, 1977 - Davis-Besse 1 80-516 NRR Filing System:

Division of Licensing undated 13 Management Analysis Branch 6/11/80 6

Research and Standards Coordination 7/1/80 12 Branch - several sections r

Emergency Preparedness Program undated 16 Office Division of Systems Integration -

2/1/78 58 1

several sections TMI Program Office undated 2

Division of fiuman Factors undated 24 Division of Engineering - several various dates 99 sections

/

(

Sincerely.