l

.~

).

Il IDocket Nos. 50-289 '

'qlf* %,,?,

50 320 UNITE D sTA1E s

'g NUCLEAR REGULATORY COMMISSION 4

3 y'

= c r, ASHif4G10rd, D. C. 70%5 g) f

%..../

November 24_,.1980 Thomas J. Madden, Esquire Kaye, Scholer, Fierman, Hays & Handler IN RESP 0fiSE REFER 1575 Eye Street, N.W.

TO F01A-80-515 AND 1.'ashington, DC 20005 80-516

Dear Mr. Madden:

This is to confirm that a representative of your office has picked up the following listed documents, which are subject to the above-mentioned Freedom of Information Act requests.

You will note that we have indicated the number of pages per document in order to maintain a running total of the pages reproduced for billing purposes.

FOIA No.

Document Description _ -

Date Pages Item No. 4 80-515 Babcock & Wilcox Licensing Experience Undated 1

80-515 Cold Shutdo.wn Capability Undated 4

80-515 Generic Review of Feedwater Transient Undated 11 in B&W Designed Reactors b

80-515 Changing the Systems Outside Contain-Undated 10 ment to Vent into Containment Building 80-515 Memo for Howard Daniels f rom Bill 9/19/78 2

LeFave Re: Identification of Safety R? lated Systems and Components80-515 Memo for Howard Danield from Scott 10/10/78 5

Newberry Re: Identification of Safety Related Systems and Components and Instrumentation to Follow the Course of an Accident 80-515 Memo for R. M. Satterfield from T. M.

12/18/78 1

Novak Re: Midland ECCS Pump Trips 8101260Dbg

2 F0IA No._

Document Description Date' Paqes Item No. 4 80-515 Memo for T. M. Novak from R. M.

2/14/79 1

Satterfield Re: Midland ECCS Pump Trips80-515 Memo for E. L. Jordan from R. C. Lewis 4/4/79 34 Re: Potential Problems Identified at Babcock and Wilcox Facilities in Regard to the TMI Occurrence 80-515 Chronology of THI-2 3/28/79 Accident 4/5/79 33 Until Core Cooling Restored 80-515 Statement of Work 4/6/79 27 80-515 Memo for Brain Grimes from R. M.

4/7/79 12 Satterfield Re: Summary of Recent Staff Efforts to Assess Environmental Qualification of Safety Related Electrical Equipment Installed at TMI-2'80-515 Memo for R. L. Tedesco, et. al. from 4/10/79 9

Z. R. Rosztoczy Re: Generic Review of Feedwater Transients in B&W Reactors80-515 Memo for R. Tedesco from R. M.

4/11/79 8

Satterfield Re: An Assessment of Pressurizer Level Instrumentation

. Installed at TMI-2 80-515 Memo for R. Bernero from E. Butcher 6/15/79 1

Re: TMI-2 lacident Response 80-515 Memo for Robe.'t W. Reid from D. C.

10/4/79 2

Dilanni Re: Spurious Reactor Scram Post TMI 80-515 Note to Harley Silver from John 11/9/79 1

Voglewede Re: Draft Safety Evaluation of Lessons Learned in TMI-l Restart Report 1

i 80-515 Memo for Harley Silver from Jerry 11/27/79 2

Mazetis Re: THI-l Review 80-51; Note to H. Silver, et. al.

11/29/79 1

from J. Voglewede Re: Lessons Learned SER on TMI-1 Restart i

e T01A No.

Document Descrip, tion Date Pager Item No. 4 80-515 Memo for Steve S ott from Richard H.

12/5/79 19 Vollmer Re: THI Unit 1 Board Notifica-tion 10 CFR 50.54 80-515 Memo for D. F. Ross from S. L. Israel 12/5/79 2

Re: B&W Porv Lift Frequency Before and After Setpoint Changes80-515 Memo for H. Silver from G. Mazetis Re:

12/18/79 6

Status of B&O Aspect of TMI-l Restart Review 80-515 Memo for D. Okrert from D. F. R'oss Re:

12/28/79

'4 TMI-2 In.plications80-515 Memo for R. Vollmer from S. F.

1/25/80 9

Newberry Re: TMI-l Restart Review:

Emergency Feedwater System. Capacity and Anticipatory Reactor Trip 80-515 Memo for V. Noonan from G. R. Mazetis 1/29/80 9

Re: TMI-l Pressure-Temperature Limits for Emergency Conditions80-515 Memo for Past Members of B&O Task 1/30/80 15 Force from D. Ross Re: Quantifying the Improvements in Prov Performance 80-515 Memo for H. Silver from G. Mazetis 2/6/80 3

Re: TMI-l Restart Review (D0R Interface)80-515 Memo for T. Novak from V. S. Noonan 2/11/80 1

Re: TMI-1, Emergnecy Pressure-Tempera-ture Limits80-515 Memo for H. Silver from G. Mazetis 2/15/80 2

Re: TMI-1 Restart: ECCS Modification and Anticipatory Reactor Trip Pa rameters80-515 Memo for Robert W. Reid from D. C.

2/19/80 4

Dilanni Re: Upgrading the Reliability of Power Operated Relief Valve (PORV)80-515 Summary of Meeting Held on 11/08/79 2/24/80 11 l

with B&W 0 ners' Group Regarding Responses to IE Bulletin 79-05C

.y i

f01A No.

Document Description Date Pages Item No. 4 80-515 Memo for R. H.. Voltmer from S. F.

2/27/80 3

Newberry Re: THI-l Restart Review:

Anticipatory Reactor Trip 80-515 Memo for Harley Silver from Jared 2/28/80-2 Wermiel Re: TMI-l Restart Review, Automatic Initiation of Emergency Feedwater(EFW)80-515 Memo for Harley Silver from Jared 3/5/80 2

Wermiel Re: TMI-1 Restart Review.

Application of SRP Section 10.4.9 80-515 Memo for R. H. Vollmer from G. R.

3/12/80 12 Mazetis Re: THI-l Restart Review 80-515 Note for G. R. Mazetis from S. F.

3/13/80 1

Newberry Re: TMI-l Restart Review Status'- Emergency Feedwater and High Pressure Injection Flow Rates80-515 Memo for H. Silver from R. Fitzpatrick 3/25/80 1

Re: TMI-l - Manual Control of PORY 80-515 Memo for D. F. Ross from B. W. Sheron 4/17/80 13 Re: Status af Reactor Coolant Pump Trip and Effect an Non-LOCA Depressurizing Transients Item No. 5 80-515 Memo to Richard C. DeYoung Undated 2

from Richard H. Vollmer Re: IMI Unit 2, SER Input 80-515 Draft memo to D. Vassallo from Lewis G. Undated 7

Hulman Re: Revised Safety Evaluation Report Input - Meteorology 80-515 Memo to Richard C. DeYoung Undated 7

from Richard H. Vollmer Re: TMI Unit 2. SER Input 80-515 Memo for D. B. Vassallo from J. P.

Undated 5

Knight Re: TMI Unit 2 OTSG Instrumen-tation for Vibration Measurement

FOIA Ho.

Document Description Date Paoes Item No. S-80-515 THI-2 Technical Specifications Undated 1

80-515 Note to'Harley froc, Mike Tokar 1/4 3

Re: Rough Draft c1 Design Evaluation 80-515 Note to Harley from Dick Kiessel Re:

12/1 5

THI-2 Vent Valves80-515 Memo to K. Kniel from Richard H.

3/5/74 4

Vollmer Re: Preliminary Review of FSAR for TMI Unit 2, Quality Assurance 80-515 Note to R. L. Tedesco from S. Cummins 3/6/74 6

Re: QA Plan for Operations80-515 Letter to Robert C. Arnold from A.

3/12/74 2

Schwencer Re: Operating Quality Assurance Plan 80-515 Memo to Roger S. Boyd from Donald J.

4/29/74 1

Skovholt Re: Independence of QA for TMI, Unit 1 80-515 Memo to Roger S. Boyd from Donald J.

7/24/74 1

Skovholt Re: Independnece of QA for TMI, Unit 2 80-515 Memo to K. Kniel from Richard Vollmer 2/12/75 3

Re: Regulatory Staff Positions -

TMI, Unit 2 - QA, Conduct of Operations80-515 Memo to George F. Lear from Richacd H.

2/13/75 1

Vollmer Re: Administrative Section of Technical Specifications. TMI-1 80-515 Memo to K. Kniel from.uchard H.

3/18/75 5

Vollmer Re: Regulatory Staff Postions -

TMI, Unit 2 - QA, Initial Test Program 80-515 Letter to R. C. Arnold from George Lear 4/24/75 3

Re: Quality Assurance Activities80-515 Memo to V. A. Moore from Donald J.

6/30/75 8

Skovholt Re: Safety Evaluation Report l

l

-6 f01A fio.

Document Description Date Pages_

Item No. 5 80-515 Memo to V. A. Moore from Donald J.

8/26/75 5

Skovholt Re: Response to Standard Review Assignment 80-515 Memo to V. A. Moore from !!arold R.

9/5/75 8

~

Denton Re: Safety Evaluation Report Input - Meteorology 80-515 1emo to Voss A. Moore from Harold R.

9/11/75 1

Denton Re: Safety Evaluation Report 80-515 Memo to Voss A. Moore from liarold R.

9/11/75 5

Denton Re: Safety Evaluation Report 80-515 Letter te V. A. Moore from Victor 9/15/75 19 Stello, Jr., Re: SER Input for TMI-2 80-515 Memo to Voss A. Moore from Harold R.

9/16/75 1

Denton Re: Hydrologic Engineering Summary 80-515 Memo to Voss A. Moore from Harold R.

9/16/75 10 Denton Re: Hydrologic Engineering Summary 80-515 Memo to H. R. Denton from Donald J.

10/3/75 1

Skovholt Re: Organizational Matters for TMI-2 80-515 Memo to V. A. Moore from Robert L.

10/3/75 2

Tedesec Re: Safety Evaluation Report Input for THI, Unit 2 80-515 Memo to V. A. Moore from Robert L.

10/3/75 23 Tedesco Re: Safety Evalution Report Input for TMI, Unit 2 80-515 Memo to V. A. Moore from R. R. Maccary 10/6/75 2

Re: Safety Evaluation Report of FSAR -

TMI, Unit 2 80-515 Memo to V. A. Moore from R. R.

10/6/75 14 Maccary Re: Safety Evaluation Report of FSAR - TMI, Unit 2 80-515 Memo to Voss A. Moore from R. R.

10/8/75 3

Maccary Re: Metropolitan Edison l

Company THI, Unit 2 FOIA !!o.

Docunent Description Date PaSes

_ Item No. 5 80-515 Memo to Daniel R. Muller from Harold R. 10/10/75 i

Denton Re: DES Input from the Cost-Benefit Analysis Branch 80-515 Memo to V. A. Moore from R. R. Maccary 10/14/75 1

Re: SER 80-515 Memo to Voss A. Moore from R. R.

10/14/75 12 Maccary Re: Safety Evaluation Report 80-515 Memo to Voss A. Moore from liarold R.

10/15/75 3

Denton Re: Draft SER Input - Geology.

Seismology, and. Foundation Engineering 80-515 Memo to K. Kniel from Paul F. Collins 11/3/75 3

Re: Response to Review Plan Assignment 80-515 Memo to Voss A. Moore from Robert L.

11/5/75 2

Tedesco Re: Safety Evaluation Report 80-515 Memo to Voss A. Moore from Robert L.

11/5/75 27 Tedesco Re: Safety Evaluation Report 80-515 Memo to V. A. Moore from Donald J.

11/11/75 2

Skovholt Re: Response to Standard Review Assignment 80-515 Memo to Voss A. Moore from Robert L.

11/17/75 3

Tedesco Re: Draft Safety Evaluation Report 80-515 Memo to Voss A. Moore from Robert L.

11/17/75 13 Tedesco Re: Draft Safety Evaluation Report 80-515 Memo to Voss A. Moore from Harold R.

11/25/75 1

Denton Re: TMI, Unit 2 SER Input 80-515 Memo to Voss A. Moore from Victor 12/23/75 6

e l

Stello, Jr., Re: Safety Evaluation Report 80-515 Memo to R. C. DeYoung from R. R.

1/4/ 76 11 Maccary Re: Safety Evaluation Report (Structural) l l

I TOIA No.

Document Description

'Date Item No. 5 P_am 80-515 Memo from Harley Silver Re: Sumary 1/9/76 19 of Meeting on Open Items80-515 Letter to R. C. DeYoung from R. R.

2/4/76 1

Maccary Re:

(Structural) Safety Evaluatica Report 80-515 Memo to Richard C. DeYoung from D. F.

2/6/76 2

Ross Re: Three Mile Island SER Input 80-515 Memo to K. Kniel from John W. Gilray.

Information Pertaining to Full 2/6/76 2

Re:

Control Rod Scram Insertion Times80-515 Memo to Richard C. DeYoung from D. F.

Ross Re: TMI-2, SER Input 2/6/76 22 80-515 Memo to Thomas A. Ippolito from 3/15/76 7

Frank Ashe Re: Sumary Meeting. with Representatives for THI, Unit 2 60-515 Memo to R. C. DeYoung from Robert L.

Tedesco Re: Request for Additional 3/23/76 6

Information on TMI-2 80-515 Memo to Karl Kni il from C. J. Heltemes Initial Test Program 4/14/76 Re:

3 80-515 Memo to Voss A. Moore from Jim Watt Three Mile Island 2 SER Input 5/4/76 1

Re:

80-515 Memo to Richard C. DeYoung from 5/13/76 5

Richard C. Vollmer Re: Three Mile Island, Unit 2, SER Input 80-515 Memo to Richard C. DeYoung from 5/14/76 Donald J. Skovholt Re: Met Ed Safety 5

Evaluation Report for Initial Tests and Operation 80-515 Note to Harley Silver and Charlie 5/18/76 3

Ferrell from Ken Murphy Re: TMI-2 SER Input 80-515 Memo to R. C. DeYoung from W. P.

5/18/76 3

Garanill Re: Revision to Hydrologic i

Engineering Surmoy l

l 1

'l b

_g.

101A No._

_Docunant Description Date Pages Item No. 5 80-515 Memo to R. C. DeYoung from Donald J.

5/27/76 4

Skovholt Re: Safety Evaluation Report Conduct of Operations80-515 Memo to Richard C. DeYoung from Richard 6/8/76 5

Vollmer Re: TMI-2 SER Input 80-515 Memo to R. C. DeYoung from R. R.

6/10/76 5

Maccary Re: Met Ed Company, TMI-2 80-515 Memo to R. C. DeYoung from Robert L.

7/21/76 3

Tedesco Re: Safety Evaluation Report Auxiliary and Power Conversion Systems Branch 80-515-Memo to R. C. DeYoung from J. P. Knight 7/26/76 1

Re: Safety Evaluation Report of FSAR 80-515 Note.to H. Silver from C. Ferrell 7/26/76 14 Re: Containment Spray System & LOCA dose analysis80-515 Memo to R. C. DeYoung from Robert L.

8/3/76 3

Tedesco Re: Safety Evaluation Report Auxiliary and Power Conversion Systems Branch 80-515 Memo to R. C. DeYoung from J. P.

8/4/76 1

Knight Re: Amendment No. 43 80-515 Draft memo to Richard DeYoung from 8/5/76 7

Richard Vollmer Re: TMI-2 SER Input 80-515 Memo to Richard C. DeYoung from Richard 8/6/76 7

Vollmer Re: TMI-2 SER Input 80-515 Memo to Richard DeYoung from D. F.

8/5/76 25 Ross Re: TMI-2 SER Input Update 80-515 Memo to Richard DeYoung from D. F.

8/6/76 23

-Ross Re: TMI-2 SER Update 80-515 Meno to D. Vassallo from Lewis G.

8/12/76 7

Hulman Re: Revised Safety Evaluation Report Input - Meteorology 1

i

TOIA fio.

Document Description Date Pages.

Item No. 5 80-515 Memo for D. B. Vassallo from R. Vollmer 10/27/76 14 Re: Supplement to the SER for TMI-2 Regarding Compliance with Appendix I 80-515 Memo for S. Varga from C. J. Heltemes 11/4/76 1

Re: Review Amendment for QA to TMI-2 80-515 Memo for S. A. Varga from C. J.

11/19/76 1

Heltemes Re: Review Amendment for QA to TMI 80-515 Memo for S. Varga from L. G.

11/24/76 2

Hulman Re: Hydrologic Engineering SER Supplement Input 80-515 Memo for D. B. Vassallo from D. F.

11/24/76 5

Ross Re: SER Supplement for TMI-2 80-515 Memo for Steven A. Varga from Donald 11/29/76 6

Skovholt Re: Analysis' Prepared by Tom Noonan 80-515 Memo for Steven Varga from C. J.

12/2/7s 3

Heltemes Re: Conduct of Operations80-515 Note to Harley Silver from R. Wayne 12/22/76 2

Houston Re: TMI Station Security Plan 80-515 Hand Written Notes from Siegel Re:

12/22/76 2

B&W Fuel Rod Design 80-515 Memo for D. B. Vassallo from J. P.

12/23/76 3

Knight Re: Reactor Vessel Support Analysis80-515 Memo for S. A. Varga from L. G. Hulman 12/27/76 5

Re: Meteorological Supplement to the SER for THI-2 80-515 Note to H. Silver from P. Stoddart Re:

1/11/77 3

THI-2 Charcoal Bed Iodine Retention Tests80-515 Memo for Domenic B. Vassallo from 1/28/77 5

Richard H. Vollmer Re: TMI-2, SER Supplemental Input

[_01_A flo._

Document _ Description Date Pges ljem No. 5 80-515 Memo for Domenic Vassallo from Robert 2/3/77 21 Tedesco Re: Instrumentation Control and Electric Power Systems80-515 Memo for Domenic Vassallo from Richard 2/11/77 3

Vollmer Re:.SER Supplemental Input 80-515 Memo for Domenic Vassallo from Richard 2/16/77 6

Vollmer Re: SER Supplemental Input 80-515 Memo for J. Shapaker froa. C. P. Tan 3/3/77 1

Re: TMI-2 Reactor Cavity Analysis80-515

~

~

Memo for D. Vassallo from R. L. Tedesco 3/16/77 5

Re: Revision of the Draft Safety Evaluation Report for TMI-2 80-515 Memo for S. A. Varga from C. J.

4/26/77 4

Heltemes Re: Response time Testing of Reactor Protection System for TMI-2 80-515 Memo for D. B. Vassallo from Donald J.

5/6/77 2

Skovholt Re: TMI-2, Safety Evaluation Report, Conduct of Operations80-515 Memo for S. A. Varga from C. J.

5/27/77 1

Helthes Re. Review of Met Ed Anendment's for QA to TMI-2 80-515 Memo fac Domenic B. Vassallo from R. L. 6/29/77 2

Tedesco Re: Safety Features Actuation System Output Relays80-515 Memo for D. B. Vassallo from D. F.

8/15/77 6

~

Ross Re: TMI-2, SER Supplement 80-515 Memo for D. Vassallo from Robert L.

8/16/77 17 Tedesco Re: Low Grid Voltage and Class 1E Electrical Equipment Qualification (Outside Containment)80-515 Memo for D. B. Vassallo from Donald 8/22/77 2

Skovholt Re: Supplement to Safety Evaluation Report for Initial Tests and Operation mm o

y J o o m o MUA.$lnlo

F0IA tio.

_ Doc ~ument Description Date

Pages, Item flo. 5 80-515 Memo for Karl R. Coller from Brian K.

9/26/77 25 Grimes Re: Spent Fuel Pool Expansion 80-515 Memo for D. B. Vassallo from D. F.

11/10/77 3

Ross Re: Draft Safety Evaluation for THI-2 80-515 flote to H. Silver from W. Jensen 11/17/77 2

Re: Documentation Concerning the EWHAM code 80-515 Memo for D. Vassallo from R. L-12/9/77 3

Tedesco Re: Revision to Draft Safety Evaluation Report 80-515 Memo for D. B. Vassallo from R. O.

12/29/77 9

Meyer Re: SER Supplement Concernin'g Burnable Poison Materials80-515 Memo for D. B. Vassallo from R. L.

1/17/78 2

Tedesco Re: Supplement flo. 3 to the TMI-2 SER 80-515 Memo for D. B. Vassallo from D. F.

1/25/78 2

Rass Re: THI-2, Cycle 1 Steam Line Break 80-515 11and Written flotes Re: Filter Spec 2/3/78 1

80-515 flote to Harley Silver from P. Stoddart 2/6/78 1

Re: ETSB Review of Proposed Technical Specification 80-515 Memo for G. Knighton from J. T. Collins 1/22/79 19 Re: Amendment to Operating License 80-515 Summary of Telephone Call with James R. 9/18/79 1

l Seelinger by Ronald R. Bellamy l

80-515 Memo for R. Reid from G. Knighton Re:

9/27/79 7

i Fuel Handlino Accident Inside Contain-ment 80-515 Memo for Harley Silver from Walter P.

10/5/79 5

Haass Re: TMI-1 Review 80-515 Memo for liarley Silver from Walter P.

10/11/79 2

I?aass Re: THI-l Restart Review

13-f01Afio.

Document Description Date Pages Item fio. 5,80-515 Memo for R. Reid from G. W. Knighton 10/17/79 5

Re: R.G.1.52 Type Ventilation Filter Tech Specs80-515 Memo for liar 1cy Silver from Walter P.

10/30/79 2

11aass Re: TMI-l Review 80-515 Memo for liarley Silver from Walter P.

11/21/79 6

Haass Re: TMI-l Review 80-515 Memo for liarley Silver from Donald J.

12/7/79 8

Skovholt Re: Quality Assurance SER Supplement for TMI-l 80-515 Memo for liarley Silver from Donald 12/7/79 7

Skovholt Re: Organizational anC Administrative Controls SER Input for THI-l Restart 80-515 Memo for G. W. Knighton from R'. L.

12/13/79 2

Bangart Re: Amendment to Operating License on Air Treatment Systems80-515 Memo for R. W. Reid from G. W.

12/28/79 2

Knighton Re: Amendment to Operating License on ESF Filter 80-515 Memo for R. W. Reid from G. W.-

1/7/80 1

Knighton Re: TMI-l Technical Specifications Change Request 80-515 Memo for 11arley Silver from Walter 2/4/80 9

flaass Re: TMI-l Restart Review 80-515 Memo for R. W. Reid from George W.

2/28/80 18 Knighton Re: Amendment to Operating License on ESF Filter 80-515 Memo for llarley Silver from Walter P.

4/30/80 13 Haass Re: Quality Assurance SER Supplen,ent for TMI-l Item !!o. 6 80-515 Testimony of P. R. Mathews regarding Undated 36 Adequacy of the Pressurizer and Pressurizer Relief Tank Size l

l

101A Ho.

Document Descrip_t_fon Date Paje_s,s Item No. 6 80-515 Handwritten notes re: LOFW Information Undated 3

on Various Nuclear Power Plants80-515 Emergency Feed System Information on Undated 18 Oconee 1, 2, & 3 80-515 Difference between TMI-2 and Other Undated 18 Huclear Power Plants80-515 Memo for S. Varga from Faust Rosa Re:

2/15 2

Additional Second Round Question 80-515 Memo for R. A. Purple et. al. from 3/12/76 5

A. Schwencer Re: ECCS Reviews in the Electrical, Instrumentation and Controls Areas80-515 Memo for Tom Cox from G. Mazetis Re:

1/13/77 3

B-SAR-205 Schedule 80-515 Memo for G. Mazetis from Thomas A.

3/23/77 8

Ippolito Re: ECCS and Decay Heat Removal Systems Reviews in 18CSB Areas for B-SAR-205 80-515 Memo from Thomas H.

4/12/77 11 Cox Re: Summary of Meeting to Discuss System Operating Sequence Diagrams &

Failure Modes & Effects Analyses, BSAR-205 80-515 Memo for T. H. Novak from R. O. Meyer 5/3/77 3

Ret Fuel Damage Acceptance Criteria for B-5AR-205 Main Line Steam Break Analysis80-515 Memo for Olan D. Parr from Thomas Cox 5/16/77 1

Re: BSAR-205 Schedule 80-515 Memo for Gordon Chipman from G. R.

5/24/77 1

Mazetis Re: Main Steam Line Break and Reactor Coolant Pump Locked Rotor Accident Dose Calculations for B-SAR-205 80-515 Memo for Domenic Vassallo from D. F.

6/28/77 55 Ross Re: Safety Evaluation Report -

Standard Nuclear Steam System, B-SAR-205

TOIA r;o.

Document Description Date Paaes Item I;o. 6 80-515 Memo from Thomas Cox Re:

7/22/77 6

Meeting Summary of Staff Positions on Two Outstanding Issues in BSAR-205 Review 80-515 Memo for T. Cox from G. R. Mazetis 8/19/77 2

Re: RSB Status of B-SAR-205 Items80-515 Memo for D. B. Vassallo from T. M.

9/6/77.

3 Novak Re: B-SAR-205 Open Items80-515 Memo for James Knight et. al. from 9/14/77 2

Domenic B. Vassa11o'Re: Final SER Input on BSAR-205 80-515 Note to D. Ross from Scott Newberry 9/20/77 5

Re: Estimate of the B-SAR-205 Input Schedule 80-515 Memo for T. Cox from'G. R. Mazetis 9/22/77 2

Re: B-SAR-205 Open Issue on Provisions for Shutdown 80-515 Memo for D. B. Vassallo from G. R.

9/28/77 7

Mazetis Re: Acceptance Review of the Consumers Power Co. Midland Plants 1 4

and 2 FSAR 80-515 Memo for T. M. Novak from Z. R.

10/11/77 2

Rosztoczy Re: B&W and GE Systems Transient Code Checkout Requirements80-515 Memo for D. B. Vassallo from D. F.

10/21/77 5

Ross Re: Open Issues on Pebble Springs80-515 Memo for S. Varga froni R. J. Bosnak 11/7/77 3

and I. S. Sihweil Re: Review of Topical Report BAW 10131 80-515 Memo for D. B. Vassallo from D. F.

11/8/77 10 Ross Re: SER Input for B-SAR-205 80-515 Letter for S. A. Varga from Joseph L.

11/30/77 55 Williams Re: 26 Questions Raised by the ACRS on the Pepple Springs Applica-tion

f_01ANo._

_Documant Description Date_

Pages 0

Item f;o. 6

~

80-515 Memo for Thomas Cox from Gerald 2/8/78 l

Mazetis Re: B-SAR-205 ECCS Review 80-515 Memo for D. B. Vassallo from D. F.

2/10/78 23 Ross Re: SER Supplement Input for Pebble Springs Units 1 and 2 80-515-Memo for D. B. Vassallo from G. R.

3/8/78 15 Mazetis Re: First Round Questions -

Midland Plants Units 1 and 2 80-515 Memo for D. B. Vassallo from G. R.

3/9/78 -

4 Mazetis Re: First.Round Questions -

~

~

Midland Plants Units 1 and 2 80-515 Routing Slip for B. LeFane, et. al.

3/13/78 3

from D. Hood Re: Mazetis memo of 3/9/78 80-515 Memo 'for D. B. Vassallo from P. E.'

3/13/78 3

Norian Re: First Round Questions Midland Plants Units 1 & 2 on Steamline Break and Feedline Break Analysis80-515 Routing Slip to Scott tiewberry 3/16/78 2

from Darl Hood Re: B&W Emergency Core Cooling System Problem 80-515 Memo for Tom Cox from T. Ippolito 3/16/78 1

Re: B-SAR-205 Design Change in Main Steam Line Isolation 80-515 Memo for D. B. Vassallo from D. F.

4/4/78 9

Ross Re: SER Input for SSAR-205 80-515 Memo for D. B. Vassallo from D. F.

4/23/78 3

Ross Re: SER Supplement Input for Pebble Springs Units 1 and 2 80-515 Memo for D. B. Vassallo from D. F.

4/24/78 4

Ross Re: Additional Partial Loop Operation Analyses for THI-2 80-515 Memo for S. A. Varga from T. M. Novak 5/15/78 4

i Re: ASLB Questions on Pebble Springs I

FOIA No Document Description

_Date Pages Item No. 6 80-515 Memo for D. B. Vassallo from D. F.

5/23/78 3

Ross Re: Evaluation of the Effect of a Change in the Flow Haldistribution Factor on DNB for B&W 250 Fuel Assembly 80-515 Memo for Darl Hood from G. R. Mazetis 6/26/78 1

Re: Midland Units 1 and 2 Small Break Analysis80-515 Memo for W. Brooks et. al. from H. A.

9/8/78 1

Daniels Re: Identification of Safety Related Systems and Equipment for Midland 1 & 2

~

80-515 Memo for W. Brooks et. al. from H. A.

9/8/78 1

Daniels Re: Identification of Safety Related Systems and Equipment for Midland 1 & 2 80-515 Memo for W. LeFave from H. A. Daniels 9/8/78 1

Re: Midland 1 & 2 Instrumentation to Follow the Course of an Accident 80-515 Memo for D. B. Vassallo from D. F.

9/28/78 23 Ross Re: Second Round Questions -

Midland Plant Units 1 and 2 80-515 Memo for S. Varga ~from R. M.

10/2/78-21 Satterfield Re: Midland Plant Units 1 & 2, First Round Questions80-515 Memo for D. B. Vassallo from Frank 10/11/78 4

Schroeder Re: SER Supplement Input for Pebble Springs Units 1 and 2 80-515 Memo for D. B. Vassallo from Frank 10/26/78 4

Schroeder Re: Supplemental Second Round Questions - Midland Plant Units I and 2 80-515 Memo for S. Varga from Fauct Rosa 12/21/78 5

Re: Supplemental Second Round Questions for Midland Nuclear Station, Units 1 and 2 80-515 Memo for D. B. Vassallo from R. L.

12/27/78 8

Tedesco Re: Second Round Questions -

Midland Plant Units 1 and 2 1

e

.- =

JOIA No.

Document Description pate Pages Item No. 6 80-515 Memo for Darl llood from' Gerald R.

1/19/79 3

Mazetis Re: RSB Open Items on Midland 1 and 2 80-515 Memo for D. B. Vassallo from R. L.

1/19/79 5

Tedesco Re: Request Additional Information for B&W's Steam Generator Analysis Code TRAP-2 80-515 Memo for R. Satte' rfield from D. Tondi 1/25/79 3

Re: Instrument Piping on Reactor Coolant Flow Transmitters RPS, B&W Plants80-515 Memo for Domenic Vassallo from Darrell 1/26/79 3

Eisenhut Re: B&W Interim Procedure for Calculating DNBR Reductions Due to Rod 80W 80-515 Memo for S. A. Varga from Walter P.

2/28/79 16 '

Haass Re: Staff Positions and Requests for Additional Information on Midland Plant Units 1 & 2 Initial Test Program 80-515 Memo for D. Ilood from floward Daniels 2/28/79 5

Re: Midland Plant Units 1 & 2 Open Items80-515 Memo for C. M. Farrell from S. 'F.

3/12/79 3

Newberry Re: ECCS Passive Failure Leak Rate 80-515 Memo for P. S. Check from T. M. Novak 3/16/79 1

Re: Review of BAW-1461 " Reactivity Insertion Assumptions Used in Safety Analysis Calculations"80-515 Memo for S. Varga from R. M.

3/20/79 13 Satterfield Re: Midland Plant Units 1 & 2 Second Round Questions80-515 Memo for Z. R. Rosztoczy from T. M.

3/26/79 1

Novak Re: Review of TRAP-2 (DAW-10128)80-515 Auxiliary Feed System - 0:enee Plant 4/3/ 79 2

1, 2, and 3 1

FOIA fio.

Document Description Date.

Pages Item No. 6 80-515 Telecopier Transmittal Request to 4/7/79 4

Ed Butcher from Jim Taylor Re: Loss of feedwater Analysis Summary 80-515 Memo for N. Dye and 8. Elam from 7/20/79 4

A. Ignatcnis & S. Newberry Re:.TMI-2 Mini Decay IIcat Removal System Preliminary Design Criteria, Revisica A 80-515 Memo to B. Elam from E. C. Dye 7/31/79 l'

Re: Mini Decay Heat Removal System Tic-In 80-515 Memo to B. Elam from E. C. Dye 7/31/79 1

Re: Mini Decay lleat Removal System -

Isolation Valve Motor Operators80-515 Letter to Robert Arnold from John T.

8/14/79 2

Collins Re: MDHR System 80-515 Letter to John Herbein from J. T.

9/7/79 2

Collins Re: Power Supply for MDHR Pump Motors80-515 Memo for H. Silver from G. Mazetis 1/30/80 3

Re: TMI-l Implementation of HUREG-0565

" Generic Evaluation of Small Break LOCA Behavior in B&W Designed 177-FA Operating Plants"80-515 Memo for J. T. Collins from R. G.

5/20/80 7

Fitzpatrick Re: Proposed ModificaLions to the TMI-2 B0P Power System 80-515 B&W Standard Nuclear Steam System Various dates 238 B-SAR-205 Work Book Item No. 8 80-515 Routing Slip to R. H. Vollmer from 4/29/80 5

John T. Collins Re: Relief from 50.55a Requirement Item No. 9 80-515 Report on Pressurizer Level Indication Undated 40

,?

-20 F01 A' flo.

_ Document Description Date.

Pages

_ Item flo. 9 80-515 Memo to H. Silver from Robert J.

10/16/75 1

McDermott Re: Review of Amendments.80-515 Memo for D. B. Vassallo from R. L.

12/20/78 2

Tedesco Re: Safety Evaluation of Proposed Change to the Technical Specifications for THI-2 80-515 Routing Slip to Jim Watt from Rod S.

4/18/79 11 Re: Changes to Conclusions Regarding Pressurizer Level Instrumentation -

80-515 Memo'to R. L. Tedesco from W. R. Butler 7/30/79 6

~

Re: CSB Review of Containment Isolation Provisions for THI-2 80-516 tetter to Victor Stello, Jr., from 5/20/80 19 D. E. Guilbert, with attachments80-516

!!UREG-0510. " Identification of 1/78 Unresolved Safety Issues Relating to fluclear Power Plants"80-516 Letter to The lionorable Walter Mondale 12/30/77 2

from Joseph M. Hendrie, transmitting flVREG-0410 to Congress80-516 liUREG-0410. "ilRC Program for the 1/1/78 Resolution of Generic Issues Related to fluclear Power Plants (Includes Plans for the Resolution of " Unresolved Safety Issues" Pursuant to Section l

210 of the Energy Reorganization Act of 1974, as Amended)"80-516 t;RR - TMI site file index Undated 15 80-516 Office of the General Counsel File 3/19/80 16 Index 80-516 Standard Subject Identification 1/1/79 71 l

fiumbering System (SSIllS) Basic Code l

l

.d b

l e

e

101A'No.

Docunent Description Date.

Pages80-516 Standard Subject Identification 6/1/78 110 NumberingSystem(SSINS)BasicCode Sincerely,

}

s4 *'

John C. Carr, Chief Freedom of Information and Privacy

/.

Ac te, Branch

Enclosures:

As stated 4

T 4

e m

.