Forwards Addl Info Resulting from Mechanical Engineering Branch 820908-09 Meetings & Response to Items 17,19,32,& 68. Responses to Items 3,4,34,49,51 & 54 Will Be Provided by 821025
ML20027C625
Person / Time
Site: Clinch River
Issue date: 10/20/1982
From: Longenecker J
ENERGY, DEPT. OF
To: Check P
Office of Nuclear Reactor Regulation
References
HQ:S:82:109, NUDOCS 8210260302
Download: ML20027C625 (6)


Text

_ _ _

3  ; .

0 -

54 .

Department of Energy Washington, D.C. 20545 5 2 59 OCT 2 01982 Mr. Paul S. Check, Director CRBR Program Office Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ,

Dear Mr. Check:

ADDITIONAL INFORMATION RESULTING FROM THE SEPTEMBER 8-9, 1982, MECHANICAL ENGINEERING BRANCH (MEB)/ CLINCH RIVER BREEDER REACTOR PLANT (CRBRP) MEETING Referencc: Letter, HQ:S:82:093, J. R. Longenecker to P. S. Check, -

" Meeting Summary for MEB/CRBRP September 8 and 9-Meeting," dated September 4,1982 Enclosed is additional information for several items identified in the referenced lett'er from the September 8-9, 1982, meeting between the Project ~and the MEB.

Enclosed are responses to items 17,19, 32, and 68. Responses to items 3, 4, 34, 49, 51, and 54 from the referenced letter will be provided by October 25, 1982. ,

Sincerely,

~

O I. ! - (t

-- S N( 'e e A_'

' John R. Longenecker  %-t

  • Acting Director. Office of the Clinch River Breeder Reactor Plant Project Office of Nuclear Energy

. Enclosures cc: Service List j),fg . go/ esfnhaelsen

()

Standard Distribution Or, ing/. A//4/ red #dM Licensing Distribution 79fedt Wilke r t!M f"f pd

@ M!R angg, .

. PDR

_ _ _ = _ - _

17. NRC QUESTION:

One-third of the computer program verification documents reviewed in the PSAR made reference to documents not readily available. A list of the missing documents was sent to the CRBR Project Office in April 1982. Until those documents ~have been received and reviewed, the adequacy lof computer program verifiction cannot be fully assessed. (Item 5 pg. 3.9.1-9)

RESPONSE

The Project received 'and reviewed on September 1 the list of l computer programs identified by the NRC (EG&G) as not having l readily available verification' documents. Below, each of the listed programs is identified by the reference nur:ber in PSAR Appendix A. The disposition for each request is shown:

A.5 APSA Provided 10/13/82 to EG&G Representative A.23 DRIPS Provided 10/13/82 to EG&G Representative A.35 FESAP Publicly available in the referenced ASME Publication A.61 MRI/STARDYNE Sent to EGES representa'tive on 10/20/82 A.71 PLAP Provided 10/13/62 to EG&G Representative A.81 SNAP Provided 10/13/82 to EG&G Representative A.86 SUPERFIPE This and HDPIPE, which supercede it, provided.10/13/82 to EG&G Representative

> A.100 WECAP Previously provided to the NRC for LWR code verification A.101 WESDYN Previously provided to the NRC for LWR code verification The owner of the copyrighted report for STARDYNE has agreed to permit a limited number of copies to be provided to the NRC.

These will be.available to NRC by October 19. .

19. NRC QUESTION:

l' '

Are the hydrodynamic loads associated with partially filled tanks (sodium and water) considered in the CRBR design?

l (Item 2 pg. 3.9.2-25)

RES PONSE: ,

The load analyses of CRBRP tanks will include any significant hydrodynamic effects from the contents. A modified PSAR page 3.7-8 is attached, stating this conclusion.

O 9

6 0

e O

I s

=

0

Phge 1 (82-1068) [8,03] #56 with mathematical representation of the system or compnents. A sufficient j number of masses with their appropriate degrees of freedom are used in the .

model to adequately describe the behavior of the structural system, and to insure an accurate determination of the dynamic response. Significant {

non-linearities, such as gap or clearances between ICRS components, are l included in the mathematical model. In this case, a nonlinear time history analysis is performed, which considers the impact forces generated at the gap locations. Non-synmetrical features of geometry, mass, and stiffness, are modeled to include their torsional effects in the analysis. Hydrodynamic effects of partially filled tanks will be evaluated wherever they are significant in magnitude. Descriptions of a preliminary reactor system linear

model and a preliminary 3CRS non-linear model are given in Section 3.7.3.15.

W e methods of response. spectra analysis and time history analysis are described in a number of pblications. A description of these analyses 4

techniques is provided in Appendix 3.7-A.

We system or component is analyzed with the seismic input (floor respnse

, spectra or time histories) derived at the particular points of supprt on the structure. All significant =vla= of the mathematical model are included in

the analysis. S e significant, dynamic response modes are those predominant modes which contribute to the total, combines modal respnse of the system.

Other modes, whose inclusion in the square root of the sum of the squares modal sunnation have anegligible effect on the total response would not necessarily be used. With this proce&re the number of modes included will be such that inclusion of additional modes will not result in more than a 10%

increase in responses. Where the respnse spectrum method is used, the indivital modal responses are cabined by the square root of the sum of the squares, except for closely spaced =viaa (frequencies less than about 10%

apart) where the modal responses are combined by the absolute sum. Se analysis is performed independently in each of the two horizontal directions, and the vertical direction. Similar effects obtained for each of the three directions are cabined by the square root of the sum of the squares. Bis is e consistent with Regulatory Guide 1.92.

A simplified analysis based on a single mass model or an equivalent static load _ method may be used when it can be demonstrated that the simplified analysis provides adequate conservatism. For the simplified analysis, the equivalent static force,' F is distributed proportional to the mass of the component, and is calculates by the following equatim: ,

F,= 1.5 W As .

where W is gthe total weight of the compnent, and A is the ==v4== peak acceleration of the response spectra, which apply af the pints of support of the canponent. Components whose fundamental frequencies are greater than 33 az in any directicn, are a===ad to be rigid in that direction and may be designed for at least the =vi== acceleraticn at t e hir supports.

3.7-8 Amend. 73 Nov.1982

  • ~

l l .

1 l

l

32. NRC QUESTION: l The description of the piping startup test program found in Chapter 14 of the PSAR is inadequate. See Subsection V.1 above for a list of the elements which should be included in an adequate description. (Item 15 pg. 3.9.2-26)

RES PONSE: ,

PSAR Section 3.9 discusses the startup functional testing which will include vibration, thermal expansion, and dynamic effects (operational transients) on specified high and moderate energy piping, and the associated , supports and restraints. The test program, to be supplied by'the'FSAR, will include:'

(1) A list of systems to be monitored.

(2) A listing of flow modes and transients. .

(3) A list of selected locations in the piping systems where

. visual inspections and measurements (as needed) will be performed.

(4) A list of snubbers on systems that will be measured for snubber travel from cold to hot positions.

~

(5) A description of the thermal motion monitoring program.

(6) A description of action's necessary to correct vibration that i.s beyond the acceptance levels. ,

PSA2 Section 3.9 will be modified,to reflect the 'above in i Amendment 73 sch'eduled for November.

l r.

i l

68. NRC QUESTION:

Large thermal stresses arise in the outer region of the perforated area of the steam generator tubesheet to the rim.

Creep rupture damage combined with fatique due to relaxation of

.high residual stresses limits life of .the component. The ASME

~ Code does not provide acceptance criteria for the design of the perforated plates in elevated temperature service.

NRC is planning to provide a position on the acceptance criteria for a perf orated tubesheet operating in elevated temperature service. (Finding 14 pg. 21 of Attachment 1) .

RES PONSE: .

A. The steam generator design has been changed from a bolted '

streamhead to an integral (welded) steamhead for both the superheater and evaporator. The PSAR is currently being revised to include the present welded steamhead and an update will be supplied in Amendment 73 scheduled in November.

B. The NRC question is generally true with regard to the type of loading and the associated failure mode at the outer rim of the perforated regions of the Steam Generator tubesheets. By eliminating the tubesheet stud holes in the present.(welded) steambead design, the areas of the largest stress concentration are removed and the level of the peak stress in the entire tubesheet is reduced. In a comparative study between the bolted l

and welded designs, with the same radial temperature i

distribution, the elastica 11y calculated peak stress is reduced from about 74 kai at the stud-hol.e circumference of the bolted design to 43 kai at the outermost tube-hole circumference of the welded design.

The question, however, is incorrect with regard to the acceptance l' criteria for perforated plates in elevated temperature service.

The. acceptance criteria for ASME Class I components provided in Code Case 1592-4, as supplemented by RDT Standard FS-4T, are the acceptance criteria for all structuralObviously, membersfor including such regions, perforated regions of tubesheets.

creep and fatigue damage evaluation will require more intricate types of stress analyses to determine the largest possible i

  1. - creep-fatique damage that could result aroundremain the circumferences

.of the outermost holes. The acceptance willThe same the same as rationale has described in Appendix T cf the Code Case.

been adopted by the ASME Code in setting the acceptance criteria for the design of perforated plates at service temperature below l the creep regime. Article A-8000 in Section III provides analysis methods that greatly facilitate the analysis of perforated plates, but in the same time the article adheres to the same acceptance criteria of Class I components given in l

e Subsection NB. .

C. The tube-to-tubesheet joint is a critical location in the steam generator. However, the design of this joirt conforms to the same acceptance criteria used for the primary coolant pressure boundary (ASME Class 1, Code Case 1592-4, as supplemented by RDT

....._. . .__. . Standard F9-4T).

Bosses are machined on the face of the tubesheet to permit full  !

penetration butt welds with the tubes. The welds are ocated at 1-3/4" from the tubesheet surface, i.e. more than 8 Rt, and thus are beyond the range of any local stresses that arise due to the interaction between the tube and tubesheet. Therefore, the joint stresses do not occur at the same location as the weld.

The analysis method for the tube-to-tubesheet joints are more complicated than that for common pressure vessels. The analysis have to account for the interactions between the tube and tubesheet and the loadings on both parts should be simultaneouly applied. But the acceptance criteria (for creep-fatique damage and inelastic strain accumulation)'will remain the same as provided in Appendix T of the Code Case.

D. Tests were planned as part of the structural evaluation of a previous bolted steamhead design which used Alloy 718 studs to-attach the steamhead bo the main tubesheet. Accelerated testing of the Alloy 718 studs and the f emale 21/4 CR-1 Mo steel was planned. In the present steam generator design, however, the welded steamhead concept is* adopted and the studs are no longer used. Also, the present structural evaluation of the steam generator ~does not include any other pro 6f testing where creep could affect the outcome of the testing.

E. The acceptance criteria presently available in the ASME Code for

(

j Class I components are sufficient to demonstrate the structural integrity of the perforated tubesheet and the tube-to-tubesheet joints operating in elevated temperatue service. Alternative or additional criteria in this regard do not seem necessary.

Since the structural evaluation of the steam generator tubesheets does not presently rely on any accelerated scale model testing in which thermal creep could be a factor, there is no need for .

acceptance criteria in this area.

~

. .