Category:CORRESPONDENCE-LETTERS
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20151R5611986-01-30030 January 1986 Summarizes 851216 Mgt Meeting at Oak Ridge Operations Ofc to Review & Inspect Redress & Reclamation of Crbr Site.Drawings Reviewed,Discussions Held & Tour of Site Performed.Site Restoration Concluded to Be as Described in Plans & Specs ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20133C7371985-06-14014 June 1985 Further Response to FOIA Request for Documents Re Site Redress Where Plant Const Begun,Including Clinch River Facility & NRC Legal Analysis Re Redress.Forwards App B Documents.App C Document Withheld (Ref FOIA Exemption 5) ML20128R0001985-06-0606 June 1985 Partial Response to FOIA Request for Records Re Desirability of Voluntary or Required Redress of Nuclear Plant Sites Where Work Undertaken But Const No Longer Contemplated. Forwards Documents Listed in App a ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20107M8141984-11-0707 November 1984 Clarifies & Reaffirms Util Commitments Re Redress of Site in Accordance W/Util 840305 Final Site Redress Plan & NRC 840606 Approval of Plan ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20140C6121984-06-18018 June 1984 Advises That Time for Commission to Review ALAB-761 Expired. Commission Declined Review.Decision Became Final Agency Action on 840611.Served on 840618 ML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20128R0161984-02-29029 February 1984 Expresses Thanks for 840222 Review of Site Redress Planning. Concurs W/Conceptual Approach & 1-yr Period for Development of Final Site Redress Plan & Investigation of Potential Use of Site.Ml Lacy Encl ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20081A5601983-08-11011 August 1983 Summarizes 830808 Informal Meeting on Contract Re PRA Review of Crbr (Task 4) & NRC Concerns Associated W/Technology for Energy Corp Deliverables Schedule ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20024D5121983-07-19019 July 1983 Requests Specs for Electrical Power Cable Insulation to Be Used at Facility ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 1986-03-13
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20107M8141984-11-0707 November 1984 Clarifies & Reaffirms Util Commitments Re Redress of Site in Accordance W/Util 840305 Final Site Redress Plan & NRC 840606 Approval of Plan ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20081A5601983-08-11011 August 1983 Summarizes 830808 Informal Meeting on Contract Re PRA Review of Crbr (Task 4) & NRC Concerns Associated W/Technology for Energy Corp Deliverables Schedule ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20024D5121983-07-19019 July 1983 Requests Specs for Electrical Power Cable Insulation to Be Used at Facility ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 ML20073S2761983-05-0505 May 1983 Forwards Revised Responses to SER Item 6 Re Qa,Including Info to Complete Identification of safety-related Structures,Sys & Components Controlled by Crbr QA Program for PSAR.Marked-up Tech Specs Encl ML20073Q3491983-04-28028 April 1983 Forwards Revised Response to SER Item 6, Qa. Response Provides Addl Info Re Identification of safety-related Structures,Sys & Components Controlled by QA Program ML20073R2221983-04-27027 April 1983 Requests to Make Limited Appearance Statement at 830718 CP Hearings Re Regional Socioeconomic Impacts ML20069L1801983-04-27027 April 1983 Informs That Evaluation of Seismic Adequacy of Primary Heat Transport Sys Branch Line & Consequences of Line Failure Being Conducted,In Response to ACRS 830419 Request.Results Will Be Forwarded by 830517 ML20073K3441983-04-18018 April 1983 Forwards Static Tests of 1/20-Scale Models of Crbr Head in Support on LMFBR Safety Program ML20071G2761983-04-18018 April 1983 Recommends That Commission Retain Technical Cadre of Experts to Review Crbr & Overall DOE Breeder Program 1986-03-13
[Table view] Category:OTHER U.S. GOVERNMENT AGENCY/DEPARTMENT TO NRC
MONTHYEARML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 ML20073S2761983-05-0505 May 1983 Forwards Revised Responses to SER Item 6 Re Qa,Including Info to Complete Identification of safety-related Structures,Sys & Components Controlled by Crbr QA Program for PSAR.Marked-up Tech Specs Encl ML20073Q3491983-04-28028 April 1983 Forwards Revised Response to SER Item 6, Qa. Response Provides Addl Info Re Identification of safety-related Structures,Sys & Components Controlled by QA Program ML20069L1801983-04-27027 April 1983 Informs That Evaluation of Seismic Adequacy of Primary Heat Transport Sys Branch Line & Consequences of Line Failure Being Conducted,In Response to ACRS 830419 Request.Results Will Be Forwarded by 830517 ML20073K3441983-04-18018 April 1983 Forwards Static Tests of 1/20-Scale Models of Crbr Head in Support on LMFBR Safety Program ML20073D7311983-04-12012 April 1983 Forwards Addl Info to Resolve SER Open Item 4 Re Solid State Programmable Logic Sys ML20073A1201983-04-0808 April 1983 Forwards Responses to Questions Re Identification of safety- Related Structures,Sys & Components by Crbr QA Program.Info Should Enable NRC to Complete Review of QA List & Close Out SER Open Item 6 ML20073A4591983-04-0808 April 1983 Provides Addl Clarification of Info Contained in PSAR Section 13.3, Emergency Planning (SER Open Item 5). Responses to Questions Identified in Crbr 830321 Meeting in Bethesda,Md & Annotated PSAR Pages Encl ML20073A0941983-04-0808 April 1983 Forwards Response to SER Open Item 3 Re Plant Protection Sys Monitor Mods ML20073A8031983-04-0707 April 1983 Commits to Listed Actions to Close Out SER Open Item 1, Review of Rdt Stds F9-4T & F9-5T. Appropriate Info on Verification of Analysis Methods & Computer Programs Used in High Temp Design Will Be Provided at OL Review Stage ML20069H5331983-04-0404 April 1983 Forwards Analysis of Wall Liner at Square Penetrations for Crbr Cell Liner Design Verification Program,Per Commitment in DOE ML20072P9561983-04-0101 April 1983 Commits to Provide Min Physical Separation of 5 Ft Between DHR Sys & Steam Generator Auxiliary Heat Removal Sys Cabling in Same Div.Commitment Resolves SER Open Item 2 ML20069G0761983-03-23023 March 1983 Forwards New Info Re Cell Liner Design Validation Program. Analysis of Wall Liner at Circular Penetrations Encl ML20071F1931983-03-14014 March 1983 Forwards Adequacy of Crbr Program Reactor Vessel NDE Insps. Rept Supports Conclusion That Exam Performed on Reactor Vessel Adequate.Rept Also Applicable to ex-vessel Storage Tank & Heat Transport Sys Vessels ML20071D2591983-03-0808 March 1983 Comments on Design Change to fission-driven Compaction. Compaction of Core Could Lead to Energetics During Hypothetical Core Disruptive Accident.Design Change Feasible ML20071D2511983-03-0707 March 1983 Forwards Corrected PSAR Table 5.6-12 Covering DHR Operating Cases & Sensitivity Evaluations to Be Included in Future PSAR Amend ML20071C7171983-03-0404 March 1983 Addresses ACRS Questions Re Capability of Facility to Continue Shutdown Heat Removal on Natural Circulation W/Loss of Bulk Ac Power for Greater than 2 H.Info Previously Presented to NRC & Documented in PSAR Section 5.7.5 ML20072B6181983-03-0404 March 1983 Forwards Crbr Program Heat Transport Sys Incontainment Piping Reserve Seismic Margins. Rept Addresses Questions Raised During ACRS 830211 Committee Meeting ML20071C6891983-03-0404 March 1983 Forwards Description of Cell Liner Design Validation Program & Fallback Plan If Base Criteria Not Validated,Per NRC Request ML20071C7021983-03-0404 March 1983 Forwards Response to Questions Re Thermal Margin Beyond Design Base,Design & Analysis.Overly Conservative Assumptions Made by NRC Consultants Re Treatment of Sodium Aerosols Inappropriate ML20072B5191983-03-0202 March 1983 Advises That Reliability Assurance Program Will Be Modified to Comply W/Criteria Presented in NRC 830225 Submittal. Project Will Provide Reliability Assurance Program Plan & Schedule Approx 6 Months After Issuance of CP ML20071C2201983-02-28028 February 1983 Forwards Revised PSAR Pages Re Inservice Insp & Addl Info Re NDE Procedure,Per 830214 Discussions.Pages Clarify Design & Provide Info Relative to Piping Insulation & NDE Requirements for Cell Liners & Fire Suppression Decks ML20071C1331983-02-28028 February 1983 Forwards Updated Page to PSAR Chapter 4.4,design Bases Section.Info Concerns Primary Sodium Gas Entrainment & Assembly Flow Blockage Criteria.Page Will Be Submitted W/ Next PSAR Amend ML20071C1391983-02-25025 February 1983 Forwards Addl Info on Psar,Section 13.3 Re Coordination W/State of Nc & Local Officials for Emergency Planning.Info Will Be Incorporated in Next PSAR Amend ML20071B0621983-02-24024 February 1983 Forwards Revised Responses to Mechanical Engineering Branch Items 26 & 70 Re Low Temp Components.Info to Be Included in Next Amend to PSAR ML20071B0301983-02-23023 February 1983 Forwards Amended PSAR Page 10.4-7 Re Consequences of Flooding Due to Failures in Circulating Water Sys.Pages Respond to NRC Questions & Will Be Included in Next PSAR Amend 1985-06-27
[Table view] |
Text
_ _ _
3 ; .
0 -
54 .
Department of Energy Washington, D.C. 20545 5 2 59 OCT 2 01982 Mr. Paul S. Check, Director CRBR Program Office Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ,
Dear Mr. Check:
ADDITIONAL INFORMATION RESULTING FROM THE SEPTEMBER 8-9, 1982, MECHANICAL ENGINEERING BRANCH (MEB)/ CLINCH RIVER BREEDER REACTOR PLANT (CRBRP) MEETING Referencc: Letter, HQ:S:82:093, J. R. Longenecker to P. S. Check, -
" Meeting Summary for MEB/CRBRP September 8 and 9-Meeting," dated September 4,1982 Enclosed is additional information for several items identified in the referenced lett'er from the September 8-9, 1982, meeting between the Project ~and the MEB.
Enclosed are responses to items 17,19, 32, and 68. Responses to items 3, 4, 34, 49, 51, and 54 from the referenced letter will be provided by October 25, 1982. ,
Sincerely,
~
O I. ! - (t
-- S N( 'e e A_'
' John R. Longenecker %-t
- Acting Director. Office of the Clinch River Breeder Reactor Plant Project Office of Nuclear Energy
. Enclosures cc: Service List j),fg . go/ esfnhaelsen
()
Standard Distribution Or, ing/. A//4/ red #dM Licensing Distribution 79fedt Wilke r t!M f"f pd
@ M!R angg, .
. PDR
_ _ _ = _ - _
- 17. NRC QUESTION:
One-third of the computer program verification documents reviewed in the PSAR made reference to documents not readily available. A list of the missing documents was sent to the CRBR Project Office in April 1982. Until those documents ~have been received and reviewed, the adequacy lof computer program verifiction cannot be fully assessed. (Item 5 pg. 3.9.1-9)
RESPONSE
The Project received 'and reviewed on September 1 the list of l computer programs identified by the NRC (EG&G) as not having l readily available verification' documents. Below, each of the listed programs is identified by the reference nur:ber in PSAR Appendix A. The disposition for each request is shown:
A.5 APSA Provided 10/13/82 to EG&G Representative A.23 DRIPS Provided 10/13/82 to EG&G Representative A.35 FESAP Publicly available in the referenced ASME Publication A.61 MRI/STARDYNE Sent to EGES representa'tive on 10/20/82 A.71 PLAP Provided 10/13/62 to EG&G Representative A.81 SNAP Provided 10/13/82 to EG&G Representative A.86 SUPERFIPE This and HDPIPE, which supercede it, provided.10/13/82 to EG&G Representative
> A.100 WECAP Previously provided to the NRC for LWR code verification A.101 WESDYN Previously provided to the NRC for LWR code verification The owner of the copyrighted report for STARDYNE has agreed to permit a limited number of copies to be provided to the NRC.
These will be.available to NRC by October 19. .
- 19. NRC QUESTION:
l' '
Are the hydrodynamic loads associated with partially filled tanks (sodium and water) considered in the CRBR design?
l (Item 2 pg. 3.9.2-25)
RES PONSE: ,
The load analyses of CRBRP tanks will include any significant hydrodynamic effects from the contents. A modified PSAR page 3.7-8 is attached, stating this conclusion.
O 9
6 0
e O
I s
=
0
Phge 1 (82-1068) [8,03] #56 with mathematical representation of the system or compnents. A sufficient j number of masses with their appropriate degrees of freedom are used in the .
model to adequately describe the behavior of the structural system, and to insure an accurate determination of the dynamic response. Significant {
non-linearities, such as gap or clearances between ICRS components, are l included in the mathematical model. In this case, a nonlinear time history analysis is performed, which considers the impact forces generated at the gap locations. Non-synmetrical features of geometry, mass, and stiffness, are modeled to include their torsional effects in the analysis. Hydrodynamic effects of partially filled tanks will be evaluated wherever they are significant in magnitude. Descriptions of a preliminary reactor system linear
- model and a preliminary 3CRS non-linear model are given in Section 3.7.3.15.
W e methods of response. spectra analysis and time history analysis are described in a number of pblications. A description of these analyses 4
techniques is provided in Appendix 3.7-A.
We system or component is analyzed with the seismic input (floor respnse
, spectra or time histories) derived at the particular points of supprt on the structure. All significant =vla= of the mathematical model are included in
- the analysis. S e significant, dynamic response modes are those predominant modes which contribute to the total, combines modal respnse of the system.
Other modes, whose inclusion in the square root of the sum of the squares modal sunnation have anegligible effect on the total response would not necessarily be used. With this proce&re the number of modes included will be such that inclusion of additional modes will not result in more than a 10%
increase in responses. Where the respnse spectrum method is used, the indivital modal responses are cabined by the square root of the sum of the squares, except for closely spaced =viaa (frequencies less than about 10%
apart) where the modal responses are combined by the absolute sum. Se analysis is performed independently in each of the two horizontal directions, and the vertical direction. Similar effects obtained for each of the three directions are cabined by the square root of the sum of the squares. Bis is e consistent with Regulatory Guide 1.92.
A simplified analysis based on a single mass model or an equivalent static load _ method may be used when it can be demonstrated that the simplified analysis provides adequate conservatism. For the simplified analysis, the equivalent static force,' F is distributed proportional to the mass of the component, and is calculates by the following equatim: ,
F,= 1.5 W As .
where W is gthe total weight of the compnent, and A is the ==v4== peak acceleration of the response spectra, which apply af the pints of support of the canponent. Components whose fundamental frequencies are greater than 33 az in any directicn, are a===ad to be rigid in that direction and may be designed for at least the =vi== acceleraticn at t e hir supports.
3.7-8 Amend. 73 Nov.1982
l l .
1 l
l
- 32. NRC QUESTION: l The description of the piping startup test program found in Chapter 14 of the PSAR is inadequate. See Subsection V.1 above for a list of the elements which should be included in an adequate description. (Item 15 pg. 3.9.2-26)
RES PONSE: ,
PSAR Section 3.9 discusses the startup functional testing which will include vibration, thermal expansion, and dynamic effects (operational transients) on specified high and moderate energy piping, and the associated , supports and restraints. The test program, to be supplied by'the'FSAR, will include:'
(1) A list of systems to be monitored.
(2) A listing of flow modes and transients. .
(3) A list of selected locations in the piping systems where
. visual inspections and measurements (as needed) will be performed.
(4) A list of snubbers on systems that will be measured for snubber travel from cold to hot positions.
~
(5) A description of the thermal motion monitoring program.
(6) A description of action's necessary to correct vibration that i.s beyond the acceptance levels. ,
PSA2 Section 3.9 will be modified,to reflect the 'above in i Amendment 73 sch'eduled for November.
l r.
i l
- 68. NRC QUESTION:
Large thermal stresses arise in the outer region of the perforated area of the steam generator tubesheet to the rim.
Creep rupture damage combined with fatique due to relaxation of
.high residual stresses limits life of .the component. The ASME
~ Code does not provide acceptance criteria for the design of the perforated plates in elevated temperature service.
NRC is planning to provide a position on the acceptance criteria for a perf orated tubesheet operating in elevated temperature service. (Finding 14 pg. 21 of Attachment 1) .
RES PONSE: .
A. The steam generator design has been changed from a bolted '
streamhead to an integral (welded) steamhead for both the superheater and evaporator. The PSAR is currently being revised to include the present welded steamhead and an update will be supplied in Amendment 73 scheduled in November.
B. The NRC question is generally true with regard to the type of loading and the associated failure mode at the outer rim of the perforated regions of the Steam Generator tubesheets. By eliminating the tubesheet stud holes in the present.(welded) steambead design, the areas of the largest stress concentration are removed and the level of the peak stress in the entire tubesheet is reduced. In a comparative study between the bolted l
and welded designs, with the same radial temperature i
distribution, the elastica 11y calculated peak stress is reduced from about 74 kai at the stud-hol.e circumference of the bolted design to 43 kai at the outermost tube-hole circumference of the welded design.
The question, however, is incorrect with regard to the acceptance l' criteria for perforated plates in elevated temperature service.
The. acceptance criteria for ASME Class I components provided in Code Case 1592-4, as supplemented by RDT Standard FS-4T, are the acceptance criteria for all structuralObviously, membersfor including such regions, perforated regions of tubesheets.
creep and fatigue damage evaluation will require more intricate types of stress analyses to determine the largest possible i
- - creep-fatique damage that could result aroundremain the circumferences
.of the outermost holes. The acceptance willThe same the same as rationale has described in Appendix T cf the Code Case.
been adopted by the ASME Code in setting the acceptance criteria for the design of perforated plates at service temperature below l the creep regime. Article A-8000 in Section III provides analysis methods that greatly facilitate the analysis of perforated plates, but in the same time the article adheres to the same acceptance criteria of Class I components given in l
e Subsection NB. .
C. The tube-to-tubesheet joint is a critical location in the steam generator. However, the design of this joirt conforms to the same acceptance criteria used for the primary coolant pressure boundary (ASME Class 1, Code Case 1592-4, as supplemented by RDT
....._. . .__. . Standard F9-4T).
Bosses are machined on the face of the tubesheet to permit full !
penetration butt welds with the tubes. The welds are ocated at 1-3/4" from the tubesheet surface, i.e. more than 8 Rt, and thus are beyond the range of any local stresses that arise due to the interaction between the tube and tubesheet. Therefore, the joint stresses do not occur at the same location as the weld.
The analysis method for the tube-to-tubesheet joints are more complicated than that for common pressure vessels. The analysis have to account for the interactions between the tube and tubesheet and the loadings on both parts should be simultaneouly applied. But the acceptance criteria (for creep-fatique damage and inelastic strain accumulation)'will remain the same as provided in Appendix T of the Code Case.
D. Tests were planned as part of the structural evaluation of a previous bolted steamhead design which used Alloy 718 studs to-attach the steamhead bo the main tubesheet. Accelerated testing of the Alloy 718 studs and the f emale 21/4 CR-1 Mo steel was planned. In the present steam generator design, however, the welded steamhead concept is* adopted and the studs are no longer used. Also, the present structural evaluation of the steam generator ~does not include any other pro 6f testing where creep could affect the outcome of the testing.
E. The acceptance criteria presently available in the ASME Code for
(
j Class I components are sufficient to demonstrate the structural integrity of the perforated tubesheet and the tube-to-tubesheet joints operating in elevated temperatue service. Alternative or additional criteria in this regard do not seem necessary.
Since the structural evaluation of the steam generator tubesheets does not presently rely on any accelerated scale model testing in which thermal creep could be a factor, there is no need for .
acceptance criteria in this area.
~
. .