Category:CORRESPONDENCE-LETTERS
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20151R5611986-01-30030 January 1986 Summarizes 851216 Mgt Meeting at Oak Ridge Operations Ofc to Review & Inspect Redress & Reclamation of Crbr Site.Drawings Reviewed,Discussions Held & Tour of Site Performed.Site Restoration Concluded to Be as Described in Plans & Specs ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20133C7371985-06-14014 June 1985 Further Response to FOIA Request for Documents Re Site Redress Where Plant Const Begun,Including Clinch River Facility & NRC Legal Analysis Re Redress.Forwards App B Documents.App C Document Withheld (Ref FOIA Exemption 5) ML20128R0001985-06-0606 June 1985 Partial Response to FOIA Request for Records Re Desirability of Voluntary or Required Redress of Nuclear Plant Sites Where Work Undertaken But Const No Longer Contemplated. Forwards Documents Listed in App a ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20107M8141984-11-0707 November 1984 Clarifies & Reaffirms Util Commitments Re Redress of Site in Accordance W/Util 840305 Final Site Redress Plan & NRC 840606 Approval of Plan ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20140C6121984-06-18018 June 1984 Advises That Time for Commission to Review ALAB-761 Expired. Commission Declined Review.Decision Became Final Agency Action on 840611.Served on 840618 ML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20128R0161984-02-29029 February 1984 Expresses Thanks for 840222 Review of Site Redress Planning. Concurs W/Conceptual Approach & 1-yr Period for Development of Final Site Redress Plan & Investigation of Potential Use of Site.Ml Lacy Encl ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20081A5601983-08-11011 August 1983 Summarizes 830808 Informal Meeting on Contract Re PRA Review of Crbr (Task 4) & NRC Concerns Associated W/Technology for Energy Corp Deliverables Schedule ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20024D9511983-07-20020 July 1983 Comments on Re Review Needs for LMFBR Program. Early Submittal of Individual FSAR Chapters Acceptable ML20024D5121983-07-19019 July 1983 Requests Specs for Electrical Power Cable Insulation to Be Used at Facility ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response 1986-03-13
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20107M8141984-11-0707 November 1984 Clarifies & Reaffirms Util Commitments Re Redress of Site in Accordance W/Util 840305 Final Site Redress Plan & NRC 840606 Approval of Plan ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20081A5601983-08-11011 August 1983 Summarizes 830808 Informal Meeting on Contract Re PRA Review of Crbr (Task 4) & NRC Concerns Associated W/Technology for Energy Corp Deliverables Schedule ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20024D5121983-07-19019 July 1983 Requests Specs for Electrical Power Cable Insulation to Be Used at Facility ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 ML20073S2761983-05-0505 May 1983 Forwards Revised Responses to SER Item 6 Re Qa,Including Info to Complete Identification of safety-related Structures,Sys & Components Controlled by Crbr QA Program for PSAR.Marked-up Tech Specs Encl ML20073Q3491983-04-28028 April 1983 Forwards Revised Response to SER Item 6, Qa. Response Provides Addl Info Re Identification of safety-related Structures,Sys & Components Controlled by QA Program ML20069L1801983-04-27027 April 1983 Informs That Evaluation of Seismic Adequacy of Primary Heat Transport Sys Branch Line & Consequences of Line Failure Being Conducted,In Response to ACRS 830419 Request.Results Will Be Forwarded by 830517 ML20073R2221983-04-27027 April 1983 Requests to Make Limited Appearance Statement at 830718 CP Hearings Re Regional Socioeconomic Impacts ML20071G2761983-04-18018 April 1983 Recommends That Commission Retain Technical Cadre of Experts to Review Crbr & Overall DOE Breeder Program ML20073K3441983-04-18018 April 1983 Forwards Static Tests of 1/20-Scale Models of Crbr Head in Support on LMFBR Safety Program 1986-03-13
[Table view] Category:OTHER U.S. GOVERNMENT AGENCY/DEPARTMENT TO NRC
MONTHYEARML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 ML20073S2761983-05-0505 May 1983 Forwards Revised Responses to SER Item 6 Re Qa,Including Info to Complete Identification of safety-related Structures,Sys & Components Controlled by Crbr QA Program for PSAR.Marked-up Tech Specs Encl ML20073Q3491983-04-28028 April 1983 Forwards Revised Response to SER Item 6, Qa. Response Provides Addl Info Re Identification of safety-related Structures,Sys & Components Controlled by QA Program ML20069L1801983-04-27027 April 1983 Informs That Evaluation of Seismic Adequacy of Primary Heat Transport Sys Branch Line & Consequences of Line Failure Being Conducted,In Response to ACRS 830419 Request.Results Will Be Forwarded by 830517 ML20073K3441983-04-18018 April 1983 Forwards Static Tests of 1/20-Scale Models of Crbr Head in Support on LMFBR Safety Program ML20073D7311983-04-12012 April 1983 Forwards Addl Info to Resolve SER Open Item 4 Re Solid State Programmable Logic Sys ML20073A1201983-04-0808 April 1983 Forwards Responses to Questions Re Identification of safety- Related Structures,Sys & Components by Crbr QA Program.Info Should Enable NRC to Complete Review of QA List & Close Out SER Open Item 6 ML20073A4591983-04-0808 April 1983 Provides Addl Clarification of Info Contained in PSAR Section 13.3, Emergency Planning (SER Open Item 5). Responses to Questions Identified in Crbr 830321 Meeting in Bethesda,Md & Annotated PSAR Pages Encl ML20073A0941983-04-0808 April 1983 Forwards Response to SER Open Item 3 Re Plant Protection Sys Monitor Mods ML20073A8031983-04-0707 April 1983 Commits to Listed Actions to Close Out SER Open Item 1, Review of Rdt Stds F9-4T & F9-5T. Appropriate Info on Verification of Analysis Methods & Computer Programs Used in High Temp Design Will Be Provided at OL Review Stage ML20069H5331983-04-0404 April 1983 Forwards Analysis of Wall Liner at Square Penetrations for Crbr Cell Liner Design Verification Program,Per Commitment in DOE ML20072P9561983-04-0101 April 1983 Commits to Provide Min Physical Separation of 5 Ft Between DHR Sys & Steam Generator Auxiliary Heat Removal Sys Cabling in Same Div.Commitment Resolves SER Open Item 2 ML20069G0761983-03-23023 March 1983 Forwards New Info Re Cell Liner Design Validation Program. Analysis of Wall Liner at Circular Penetrations Encl ML20071F1931983-03-14014 March 1983 Forwards Adequacy of Crbr Program Reactor Vessel NDE Insps. Rept Supports Conclusion That Exam Performed on Reactor Vessel Adequate.Rept Also Applicable to ex-vessel Storage Tank & Heat Transport Sys Vessels ML20071D2591983-03-0808 March 1983 Comments on Design Change to fission-driven Compaction. Compaction of Core Could Lead to Energetics During Hypothetical Core Disruptive Accident.Design Change Feasible ML20071D2511983-03-0707 March 1983 Forwards Corrected PSAR Table 5.6-12 Covering DHR Operating Cases & Sensitivity Evaluations to Be Included in Future PSAR Amend ML20071C7171983-03-0404 March 1983 Addresses ACRS Questions Re Capability of Facility to Continue Shutdown Heat Removal on Natural Circulation W/Loss of Bulk Ac Power for Greater than 2 H.Info Previously Presented to NRC & Documented in PSAR Section 5.7.5 ML20072B6181983-03-0404 March 1983 Forwards Crbr Program Heat Transport Sys Incontainment Piping Reserve Seismic Margins. Rept Addresses Questions Raised During ACRS 830211 Committee Meeting ML20071C6891983-03-0404 March 1983 Forwards Description of Cell Liner Design Validation Program & Fallback Plan If Base Criteria Not Validated,Per NRC Request ML20071C7021983-03-0404 March 1983 Forwards Response to Questions Re Thermal Margin Beyond Design Base,Design & Analysis.Overly Conservative Assumptions Made by NRC Consultants Re Treatment of Sodium Aerosols Inappropriate ML20072B5191983-03-0202 March 1983 Advises That Reliability Assurance Program Will Be Modified to Comply W/Criteria Presented in NRC 830225 Submittal. Project Will Provide Reliability Assurance Program Plan & Schedule Approx 6 Months After Issuance of CP ML20071C2201983-02-28028 February 1983 Forwards Revised PSAR Pages Re Inservice Insp & Addl Info Re NDE Procedure,Per 830214 Discussions.Pages Clarify Design & Provide Info Relative to Piping Insulation & NDE Requirements for Cell Liners & Fire Suppression Decks ML20071C1331983-02-28028 February 1983 Forwards Updated Page to PSAR Chapter 4.4,design Bases Section.Info Concerns Primary Sodium Gas Entrainment & Assembly Flow Blockage Criteria.Page Will Be Submitted W/ Next PSAR Amend ML20071C1391983-02-25025 February 1983 Forwards Addl Info on Psar,Section 13.3 Re Coordination W/State of Nc & Local Officials for Emergency Planning.Info Will Be Incorporated in Next PSAR Amend ML20071B0621983-02-24024 February 1983 Forwards Revised Responses to Mechanical Engineering Branch Items 26 & 70 Re Low Temp Components.Info to Be Included in Next Amend to PSAR ML20071B0301983-02-23023 February 1983 Forwards Amended PSAR Page 10.4-7 Re Consequences of Flooding Due to Failures in Circulating Water Sys.Pages Respond to NRC Questions & Will Be Included in Next PSAR Amend 1985-06-27
[Table view] |
Text
@
Department of Energy Washington, D.C. 20545 Docket No. 50-537 HQ:S:83:237 MAR 2 31983 Dr. J. Nelson Grace, Director CRBR Program Office Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Dr. Grace:
CELL LINER DESIGN VALIDATION PROGRAM - CIRCULAR PENETRATION ANALYSIS
Reference:
Letter HQ:S:83:231, J. R. Longenecke. to J. N. Grace,
" Cell Liner Design Validation Progra,1," dated March 4, 1983 This letter transmits new information related to the Clinch River Breeder Reactor Plant Cell Liner Design Validation Program promised in the reference. Specifically attached is the analysis of the wall liner at circular penetrations.
Any questions regarding the information provided or further submittals can be addressed to Mr. P. Washer (FTS 626-6179) or Mr. V. Fayne (FTS 626-6394) of the Project Office Oak Ridge staff.
Sincerely, b.
JhnR.Longen er Acting Director, Office of Breeder Demonstration Projects Office of Nuclear Energy Enclosure cc: Service List O
Standard Distribution gO Licensing Distributiol
$$ h $0h o 0 0 A
i
/
ATTACHMENT I CELL LINER WALL LINER AT CIRCULAR PENETRATIONS considered based on the mathematical model of Figure A-1 The following ANSYS elements were used in the model:
STIF 48 for the plate, STIF 20 and STIF B for the studs a d S 52 for the interface between the plate and the concrete n
TIF Two cases were considered:
a)
Initiating a diagonal checkerboard buckling pattern This was considered by imposing forces in the center of the liner panels as shown in Figure A-2.
b)
With the liner plate initially flat and allowing the plate to buckle without imposing any buckling pattern 1
two cases are in very close agreement.The analyses upto 240 F indica e
analyses up to the design temperature was limited to ca Therefore, further only.
circular penetration is 670 F.
Table A-1 shows the maximum strains and Figure A-3 show calculated buckling pattern in terms of the displacement contours s the The maximum equivalent von Mises strains are:
Plate -
.011 (in/in) (Membrane);.026 (in/in) (Membrane plus Bending)
Stud
.051 (in/in) (Membrane) ; 0.143 (in/in) (Membrane plus Bending) criteria are.105The strain allowables in accordance with the liner d (in/in) s gn for the membrane plus bending strain.for the membrane strain and 0.141 (in/in)
Liner strains are well below allowables by a factor of 5 5 Stud strains are at the maximum allowable for combined membrane plus bending, however this is acceptable be liner integrity.
e I
/
~
k__
h j
/
i 3/8" Thick Liner i
st i as e
1/2" Diameter Stud 7 aft sat 9 15" o.c. each
/u'I 2:2 vay.(Typical)
, me n.
i AX%N'%N'%X
/M%M%M%MX 5
o as:
XXX%%%X%y
'~
i
/
1 1/4" Thick ^
c11 y,,',e:"AX%X%M%N:%
i
,p
,-F MA*yX7
[1 i
s.i e,
./
sh i
i 12" Il. 6" J l
60" l
I-
'~
o z
H 161 232 250 269 391 409 428 447) 163 234 252 271 393 411 430 449 Element Numbers 165 236 254 273 395
'413 432 451 for studs 167 23B 256 275 397 415 434 453 "
Mn FIGURE A-1 WALL LINER AT CIRCULAR PENETRATION MATHEMATICAL MODEL
_..--.,,----e.
ew e-
- - - ' ' ' ~ -
1 9
1/2" DIAMETER STUD g
g UNIT FORCE (1 lb) AWAY FROM THE WALL
\\
g UNIT FORCE TOWARDS THE WALL N
N x
(-)
e N
\\
N O
/
O O'
l e
l FIGURE A-2 WALL LINER AT CIRCULAR PENETRATION APPLIED INITIAL FORCES
I~
r,
/
N I
N 75- )
CONTOUR VALUES
\\\\
(INCHES)*
a -1.6 f
3..: 4 3
I f c*~;.,
[
D -:
l
/
E
.s s t v
"[fff/C -
r...s 4 N,1 j
f
- c..*
H H
.2 f
,l
[
h 1*C
/,
f i
2..e t,s, jp/
I
\\
E la
,1 nc j
f w,.
F
,V f
l l
f 1
H J
\\\\
l i i,t l
I l
- Negative value indicates displacement away from concrete.
l i
FIGURE A-3 WALL LINER AT CIRCULAR PENETRATIONS DISPLACEMENT CONTOURS
/
g 1
Sheet I of 8 TABLE A-1 WALL LINER AT CIRCULAR PENETRATIONS; EQUIVALENT STRAINS (IN/IN)
MEMBRANE +
ELEMENT MEMBRANE BENDING 123 0.003884 0.013095 LINER 224 0.002956 0.012740 LINER 126 0.002813 0.012403 LINER 127 0.001063 0.009686 LINER 129 0.001064 0 009563 LINER 330 0.000877 0.009670 LINER 132 0.000695 0.009709 LINER 133 0.000609 0.000584 LINER 136 0.002647 0.003248 LINER 137 0.000027 0.001987 LINER 339 0.001134 0.002175 LINER 140 0.001667 0.002517 LINER,
142 0.001363 0.002347 LINER 143 0.000851 0.001823 LINER 145 0.000672 0.002064 LINER 146
- 0.001346 0.002689 LINER 149 0.007734 0.020-187 LINER 150 0.004982 0.013505 LINER 152 0.004243 0.033444 LINER 153 0.001669 0.003374 LINER ISS 0.001307 0.003046 L]NER 356 0.001411 0.00320Y LINER 350 0.001646 0.003234 LINER 359 0.001325 0.002760 LINER 261 0.026526 0.061?45
-S1 Uli-T OP 263 0.0239"2 0.026Y75 S1 Ull-D OT T OM 163 0.024,.25 0.027V35 STUD -T OP
,ene---
gw-
-s w
/, -
)
Sheet 2 of 8 TABLE A-1 WALL LINER AT CIRCULAR PENEIRATIONS; EQUIVALENT STRAINS (IN/IN)
ELEMENT ji E+B 163 0.023790 0.023899 STUD-EDTTOM 165 0.024002 0.024268 STUD-TOP 165 0.023799 0.024236 STUD-BOTTOM 167 0.023775 0.024217 STUD-TOP 167 0.024161 0.026358 STUD-BOTTOM 169 0.003591 0.009243 LINER 171 0.003926 0.007179 LINER 173 0.001980 0.009838 LINER 175 0.001409 0.006651 LINER 176 0.002374 0.006250 LINER 178 0.002431 0.006060 LINER 179 0.001970 0.006508 LINER 181 0 002198 0 007191 LINER 183 0.001830 0.004952 LINER 185 0.001737 0.007229 LINER 186 0.000913 0.005770 LINER 100 0.001280 0.002153 LINER 189 0.001227 0.001712 LINER 191 0.001036 0.004539 LINER 192 0.000941 0.006193 LINER 194 0.001074 0.007564 LINER 195 0.001060 0.010082 LINER 197 0.001257 0.006906 LINER 398 0.001038 0.009196 LINER 200 0.002023 0.011426 LINER 202 0.002760 0.012227 LINER 203 0.003203 0.014540 LINER 206 0 003671 0.004213 LINER 200 0 002803 0.004972 LINER 209 0.002617 0.004541
- LINER, 211 0.002121
- 0.006242 LINER 212 0.002197 0.005477 LINER 214 0.001238 0.002935 LINER 215 0.000847 0.002274 LINER 217 0.000962 0.005503 LINER 218 0.001094 0.008634 LINER 220 0.000973 0.006146 LINER 221 0.000944 0.006802 LINER 223 0.001249 0.003115 LINER 224 0.001396 0.002965 LINER
...n
..-.n,
-y
/
Sheet 3 of 8 TABLE A-1 WALL LINER AT CIRCULAR PENETRATIONS; EQUIVALENT STRAINS (IN/IN)
ELEMENT ji M+B 226 O.001102 0 002389 LINER 227 0.001259 0.002948 LINER 229 0.001321 0.002745 LINER 230 0.000847 0.002638 LINER 232 0.047910 0.130693 STUD-TOP 232 0.034918 0.044234 STUD-BOTTON 234 0.037478 0.047358 STUD-TOP
. 234 0.036057 0.036427 STUD-BOTTON 236 0.036266 0.036743 STUD-TOP 236 0.036326 0.037609 STUD-BOTT0h 238 0.036050 0.037168 STUD-TOP 238 0.037642 0.051584 STUD-BOTTOli 240 0.003029 0 010751 LINER 242 0.003906 0.007529-LINER' 243 0.004043 0.004461 LINER 245 0.003438 0.006660 LINER 246 0.002979 0.005278 LINER 248 0.003264 0.006136 LINER 249 0.003032 0.005506 LINER 250 0.000736 0.030007 STUD-TOP 250 0.000220 0.004924 STUD-BOTTOtt 252 0.000443 0.006258 STUD-TOP 252 0.000204 0.001233 STUD-BOTT0ti 254 0.000265 0.00J351 STUD-TOP 254 0.000323 0.001691 STUD-BOTT0fi 256 0.000394 0.001430 STUD-10P 256 0 000511 0.006496 STUD-DOT 1 Oli 258 0,002102 0 004612 L.) t!E R' 259 0.001997 0.005555 LIDER 2/1 0.003016 0.0079Y4 LINER 262 0.002223 0.000445 LINER 264 0.001159 0.004947 LINER 265 0.001136 0.002300 LINER 267 0.001390 0.003336 LINER 268 0.001578 0.003769 LINER 269 0.013333 0.045345 STUD-TOP 269 0.006569 0.011469 STUD-BOTTON 271 0.000141 0.013646 STUD-TOP 271 0.006223 0.006396 STUD-BOTTOM 273 0.006671 0.007004 STUD-TOP
, ~., - -., -,.,,..
..,-.-n----
-,-..n,
/,
s Sheet 4 of 8 TABLE A-1 WALL LINER AT CIRCULAR PENETRATIONS;
. EQUIVALENT STRAINS (IN/IN)
ELEMENT M.
M+B 273 0.006408 0.007681 STUD-DOTTOM 275 0.006034 0.007270 STUD-TOP 275 0.008320 0.013182 STUD-BOTTOM 277 0.001137 0.003359 LINER 270 0.000086 0.003532 LINER 280 0.000527 0.001373 LINER 281 0.000718 0.001264 LINER 284 0 001660 0.003795 LINER 286 0.002702 0.004551 LINER 287 0.003132 0.011727 LINER 289 0.003148 0.009780 LINER 290 0.005026 0.010528 LINER 292 0 006549 0 015396 LINER 293 0.004261 0.007765 LINER 295 0.004536 0.008450 LINER 296 0.004194 0.007435 LINER 298 0.003622 0 006235 LINER 299 0.002514 0.005916 LINER 301 0.003002 0 009268 LINER 302 0.002966 0.006139 LINER 304 0 002081 0.003641 LINER 305 0.000937 0.002031 LINER 307 0.001168 0.003976 LINER 300 0.001768 0.006309 LINER 310 0.000929 0.004777 LINER 311 0.000056 0.006142 LINER 313 0.000630 0.004242 LINER 334 0.000039 0.00-1059 LINER-317 0.000937 0.009356 LINER 319 0.001082 0.007400 LINER 320 0.002925 0.012068 LINER 322 0.003693 0.011?25 LINER 323 0.004019 0.012950 LINER 325 0.004852 0.012819 LINER 326 0.005326 0.009392 LINER 328 0.006796 0.030677 LINER 329 0.006500 0.014057 LINER 331 0.004346 0.005017 LINER 332 0.004403 0.000565 LINER 334 0.003860 0.005970 LINER
-r
-A' Sheet 5 of 8 TABLE A-1 WALL LINER AT CIRCULAR PENETRATIONS; EQUIVALENT STRAINS (IN/IN)
ELEMENT M
M+B 335 0.003329 0.004836 LINER 337 0.002813 0.004307 LINER 338 0.003215 0.004053 LINER 340 0.002124 0.004173 LINER 341 0.002644 0.004543 -
LINER 343 0.002168 0 004651 LINER 344 0.001815 0.004364 LINER 346 0.000906 0.002257 LINER 347 0.000929 0.001984 LINER 349 0.000837 0.002027 LINER 350 0.000639 0.001970 LINER 353 0.002323 0.014190 LINER 355 0.001316 0.013719 LINER 356 0.001001 0.011323 LINER 358 0.003190 0.009864 LINER 359 0.003770 0.014364 LINER 361 0.004978 0.014668 LINER 362 0.006026 0.018642 LINER 364 0.007447 0.018708 LINER 365 0.007608 0.014292 LINER 367 0.007;333 0.012416 LINER 368 0.006451 0.014077 LINER 370 0.004147 0.005668 LINER 371 0.003899 0.007231 LINER 373 0.003273 0.005765 LINER t
374 0.003968 0.008264 LINER 376 0.003531 0.003170 lit!ER l
377 0.002025 O.007715 LINER-379 0.002229 0.006950 LINER 380 0.002656 0.004923 LINER 382 0.002187 0.00-1978 LINER 303 0.001533 0.002496 LINER 385 O.001242 0.002001 LINER
(
386 0.000944 0.001970 LINER i
3CS 0.000836 0.001969 LINER 389 0.000074 0.001919 LINER l
391 0.042028
'O.113334 STUD-TOP 391 0.028348 0.036948 STUD-BOTTOM 393 0.031063 0.040330 STUD-TOP l
393 0.029744 0.030f31 STUD-D0TTOM l
v r.
e s
s
/
Sheet 6 of 8 TABLE A-1 WALL LINER AT* CIRCULAR PENETRATIONS; EQUIVALENT STRAINS (IN/IN)
ELEMENT
]!
M+B 395 0 029989 0.030557 STUD-TOP 395 0.029845 0.030400 STUD-BOTTOM 397 0.029734 0 030307 CTUD-10P 397 0.030768 0.030604 STUD-BOTTOM 399 0.010029 0.016409 LINER 401 0.006471 0.014251 LINER 402 0.006227 0.012071 LINER 404 0.003975 0.011182 LINER 405 0.005039 0 018589 LINER 407 0.005391 0.009916 LINER 408 0.004770 0.008466 LINER 409 0.035214 0 127611 STUD-TOP
~
409 0.014614 0.02C516 STUD-BOTTOM 411 0.018091 0.034141 STUD-TOP 411 0.013607 0.014741 STUD-BOTTOM 433 0.014426 0 016032 STUD-TOP 413
,0.014439 0 016793 STUD-BOTTOM 415 0.013559 0.015404 STUD-TOP 415 0.018381 0.034651 STUD-BOTTOM 417 0.004738 0.007489 LINER 438 0.005189 0.019727 LINER 420 0.004661 0 015313 LIllER 421 0.008454 0.010361 LINER 423 0.008601 0.0205C2 LINER 424 0.006763 0.013707 LINER 426 0.00582?
0.035090 LINER 427 0.005353 0.015270 LINER 428 0.022236 0.096372 STUD. TOP 428 0.011619 0.022350 STUD-DOTTOM l
430 0.013039 0.025990 STUD-TOP l
430 0.010543 0.011539 DTUD-DOTTOM 432 0.010909 0.032263 STUD-TOP 432 0.011334 0.013671 STUD-DOTTOM 434 0.010619 0.012463 STUD-TOP 434 0.014649 0.029461 STUD-DOTTOM 436 0.004714 0.014229 LINER 437 0.003832 0.013113 LINER 439 0.003983 0.012312 LINER 440 0.003567 0.012815 LINER 442 0.003063 0.012227 LINER 4
9 e
S
,..--.m
-,a
/
o
/
Sheet 7 of a TABLE A-1 WALL LINER AT, CIRCULAR PENETRATIONS; EQUIVALENT STRAINS (IN/IN)
ELEMENT M_
M+B
~
443 0.001333 0.011117 LINER 445 0.001207 0.012674 LINER 446 0.001755 0.012235 LINER 4 4 */
O.051451 0.142780 STUD-TOP 447 0.029136 0 041227 STUD-BOTTOM 449 0.033249 0.046732 STUD-TOP 449 0.031219 0 031760 STUD-BOTTOM
'451 0.033614 0.032358 STUD-TOP 451 0.031542 0 033034 STUD-BOTTOM 453 0.033200 0 032555 STUD-TOP 453 0.033137 0.049206 STUD-B0TT0il 455 0.001343 0.011011 LINER 456 0.000880 0.012783 LINER 458 0 001006 0.011357 LINER 459 0.001716 0.012429 LINER 462 0.002034 0.013455 LINER 464 O.005235 0 015168 LINER 465 O.005583 0.013932 LINER 467 0.005402 0.014118 LINER 46S 0.009101 O.022738 LINER 470 0.008306 0.018313 LINER 473 0.006254 0.017580 LINER 4 ~73 0.005026 0.010925 LINER 474 0.005573 0.018473 LINER 476
- 0. 0022M O.020726 LINER 477 0.005955 0.020742 LINER
- 79 0 009309 0.033782 LINER 480 0.030906 0.013082 LIi;!ER
/.02 0.00720e.
O.011594 LINER 403 0.003714 0.006690 uINER
- t. O G O.002438 0.007391 LINER 406 0.002134 0.003733 LINER 488 0.002119 0.003648 LINER 489 0.001235 O.002474 LINER 491 0.001502 0.003136 LINER 492 0.001036 0.001984 LINER 494 0.001379 0.002101 LINER 495 0.001045 O.001935 LINER 497 0.001004 O.002624 LIhER 498 0.000758 0.002563 LINER e
--g
/
/
m Sheet 8 of 8 TABLE A-1 WALL LINER AT. CIRCULAR PENETRATIONS; EQUIVALENT STRAINS (IN/IN)
ELEMENT M
M+B 500 0.000355 0.002204 LINER 501 0.000418 0.001936 LINER 503 0.000663 0.001918 LINER 504 0.000415 0.000823 LINER 507 0.000489 0.000900 LINER 509 0.002422 0.008539 LINER 510 0.001392 0.007680 LINER 512 0.002840 0.009120 LINER
'513 0.004899 0.011181 LINER 515 0.010145 0.026256 LINER 516 0.010911 0.022456 LINER 518 0.010304 0.018841 LINER 519 0.007571 0.014991 LINER 521 0.006783 0.021701 LINER 522 0 003792 0.014148 LINER 524 0.003678 0.015399 LINER 525 0.006006 0.012056 LINER 527 0 005803 0.009442 LINER 528 0.008307 0.017090 LINER 530 0.007313 0.017361 LINER 531 0.008167 0.020679 LINER 533 0.007370 0 010005 LINER 534 0.004201 0.017610 LINER 536 0.004153 0.016?31 LINER 537 0.00356?
0.015754 LINER I
539 0.003572 0.01b623 LINER 540 0.002096 0.03 4NO LINER l
542 0.003956 0.03A.776 LINER l
543 0.002494 0.035703 L I t{ER '
l 545 0.002630 0.015721 LINER 546 0.002681 0.016204 LINER 548 0.002727 0.016470 LINER 549 0.001666 0 015074 LINER l
551 0.001604 0.015072 LINER i
552 0.001107 0.014416 LINER 0
0 Allowable Strains 1
0.105 (in/in) Membrane 0.141 (in/in) Membrane Plus Bending n
,