Category:CORRESPONDENCE-LETTERS
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20151R5611986-01-30030 January 1986 Summarizes 851216 Mgt Meeting at Oak Ridge Operations Ofc to Review & Inspect Redress & Reclamation of Crbr Site.Drawings Reviewed,Discussions Held & Tour of Site Performed.Site Restoration Concluded to Be as Described in Plans & Specs ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20133C7371985-06-14014 June 1985 Further Response to FOIA Request for Documents Re Site Redress Where Plant Const Begun,Including Clinch River Facility & NRC Legal Analysis Re Redress.Forwards App B Documents.App C Document Withheld (Ref FOIA Exemption 5) ML20128R0001985-06-0606 June 1985 Partial Response to FOIA Request for Records Re Desirability of Voluntary or Required Redress of Nuclear Plant Sites Where Work Undertaken But Const No Longer Contemplated. Forwards Documents Listed in App a ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20107M8141984-11-0707 November 1984 Clarifies & Reaffirms Util Commitments Re Redress of Site in Accordance W/Util 840305 Final Site Redress Plan & NRC 840606 Approval of Plan ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20140C6121984-06-18018 June 1984 Advises That Time for Commission to Review ALAB-761 Expired. Commission Declined Review.Decision Became Final Agency Action on 840611.Served on 840618 ML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20128R0161984-02-29029 February 1984 Expresses Thanks for 840222 Review of Site Redress Planning. Concurs W/Conceptual Approach & 1-yr Period for Development of Final Site Redress Plan & Investigation of Potential Use of Site.Ml Lacy Encl ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20081A5601983-08-11011 August 1983 Summarizes 830808 Informal Meeting on Contract Re PRA Review of Crbr (Task 4) & NRC Concerns Associated W/Technology for Energy Corp Deliverables Schedule ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20024D9511983-07-20020 July 1983 Comments on Re Review Needs for LMFBR Program. Early Submittal of Individual FSAR Chapters Acceptable ML20024D5121983-07-19019 July 1983 Requests Specs for Electrical Power Cable Insulation to Be Used at Facility ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response 1986-03-13
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20107M8141984-11-0707 November 1984 Clarifies & Reaffirms Util Commitments Re Redress of Site in Accordance W/Util 840305 Final Site Redress Plan & NRC 840606 Approval of Plan ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20081A5601983-08-11011 August 1983 Summarizes 830808 Informal Meeting on Contract Re PRA Review of Crbr (Task 4) & NRC Concerns Associated W/Technology for Energy Corp Deliverables Schedule ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20024D5121983-07-19019 July 1983 Requests Specs for Electrical Power Cable Insulation to Be Used at Facility ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 ML20073S2761983-05-0505 May 1983 Forwards Revised Responses to SER Item 6 Re Qa,Including Info to Complete Identification of safety-related Structures,Sys & Components Controlled by Crbr QA Program for PSAR.Marked-up Tech Specs Encl ML20073Q3491983-04-28028 April 1983 Forwards Revised Response to SER Item 6, Qa. Response Provides Addl Info Re Identification of safety-related Structures,Sys & Components Controlled by QA Program ML20069L1801983-04-27027 April 1983 Informs That Evaluation of Seismic Adequacy of Primary Heat Transport Sys Branch Line & Consequences of Line Failure Being Conducted,In Response to ACRS 830419 Request.Results Will Be Forwarded by 830517 ML20073R2221983-04-27027 April 1983 Requests to Make Limited Appearance Statement at 830718 CP Hearings Re Regional Socioeconomic Impacts ML20071G2761983-04-18018 April 1983 Recommends That Commission Retain Technical Cadre of Experts to Review Crbr & Overall DOE Breeder Program ML20073K3441983-04-18018 April 1983 Forwards Static Tests of 1/20-Scale Models of Crbr Head in Support on LMFBR Safety Program 1986-03-13
[Table view] Category:OTHER U.S. GOVERNMENT AGENCY/DEPARTMENT TO NRC
MONTHYEARML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 ML20073S2761983-05-0505 May 1983 Forwards Revised Responses to SER Item 6 Re Qa,Including Info to Complete Identification of safety-related Structures,Sys & Components Controlled by Crbr QA Program for PSAR.Marked-up Tech Specs Encl ML20073Q3491983-04-28028 April 1983 Forwards Revised Response to SER Item 6, Qa. Response Provides Addl Info Re Identification of safety-related Structures,Sys & Components Controlled by QA Program ML20069L1801983-04-27027 April 1983 Informs That Evaluation of Seismic Adequacy of Primary Heat Transport Sys Branch Line & Consequences of Line Failure Being Conducted,In Response to ACRS 830419 Request.Results Will Be Forwarded by 830517 ML20073K3441983-04-18018 April 1983 Forwards Static Tests of 1/20-Scale Models of Crbr Head in Support on LMFBR Safety Program ML20073D7311983-04-12012 April 1983 Forwards Addl Info to Resolve SER Open Item 4 Re Solid State Programmable Logic Sys ML20073A1201983-04-0808 April 1983 Forwards Responses to Questions Re Identification of safety- Related Structures,Sys & Components by Crbr QA Program.Info Should Enable NRC to Complete Review of QA List & Close Out SER Open Item 6 ML20073A4591983-04-0808 April 1983 Provides Addl Clarification of Info Contained in PSAR Section 13.3, Emergency Planning (SER Open Item 5). Responses to Questions Identified in Crbr 830321 Meeting in Bethesda,Md & Annotated PSAR Pages Encl ML20073A0941983-04-0808 April 1983 Forwards Response to SER Open Item 3 Re Plant Protection Sys Monitor Mods ML20073A8031983-04-0707 April 1983 Commits to Listed Actions to Close Out SER Open Item 1, Review of Rdt Stds F9-4T & F9-5T. Appropriate Info on Verification of Analysis Methods & Computer Programs Used in High Temp Design Will Be Provided at OL Review Stage ML20069H5331983-04-0404 April 1983 Forwards Analysis of Wall Liner at Square Penetrations for Crbr Cell Liner Design Verification Program,Per Commitment in DOE ML20072P9561983-04-0101 April 1983 Commits to Provide Min Physical Separation of 5 Ft Between DHR Sys & Steam Generator Auxiliary Heat Removal Sys Cabling in Same Div.Commitment Resolves SER Open Item 2 ML20069G0761983-03-23023 March 1983 Forwards New Info Re Cell Liner Design Validation Program. Analysis of Wall Liner at Circular Penetrations Encl ML20071F1931983-03-14014 March 1983 Forwards Adequacy of Crbr Program Reactor Vessel NDE Insps. Rept Supports Conclusion That Exam Performed on Reactor Vessel Adequate.Rept Also Applicable to ex-vessel Storage Tank & Heat Transport Sys Vessels ML20071D2591983-03-0808 March 1983 Comments on Design Change to fission-driven Compaction. Compaction of Core Could Lead to Energetics During Hypothetical Core Disruptive Accident.Design Change Feasible ML20071D2511983-03-0707 March 1983 Forwards Corrected PSAR Table 5.6-12 Covering DHR Operating Cases & Sensitivity Evaluations to Be Included in Future PSAR Amend ML20071C7171983-03-0404 March 1983 Addresses ACRS Questions Re Capability of Facility to Continue Shutdown Heat Removal on Natural Circulation W/Loss of Bulk Ac Power for Greater than 2 H.Info Previously Presented to NRC & Documented in PSAR Section 5.7.5 ML20072B6181983-03-0404 March 1983 Forwards Crbr Program Heat Transport Sys Incontainment Piping Reserve Seismic Margins. Rept Addresses Questions Raised During ACRS 830211 Committee Meeting ML20071C6891983-03-0404 March 1983 Forwards Description of Cell Liner Design Validation Program & Fallback Plan If Base Criteria Not Validated,Per NRC Request ML20071C7021983-03-0404 March 1983 Forwards Response to Questions Re Thermal Margin Beyond Design Base,Design & Analysis.Overly Conservative Assumptions Made by NRC Consultants Re Treatment of Sodium Aerosols Inappropriate ML20072B5191983-03-0202 March 1983 Advises That Reliability Assurance Program Will Be Modified to Comply W/Criteria Presented in NRC 830225 Submittal. Project Will Provide Reliability Assurance Program Plan & Schedule Approx 6 Months After Issuance of CP ML20071C2201983-02-28028 February 1983 Forwards Revised PSAR Pages Re Inservice Insp & Addl Info Re NDE Procedure,Per 830214 Discussions.Pages Clarify Design & Provide Info Relative to Piping Insulation & NDE Requirements for Cell Liners & Fire Suppression Decks ML20071C1331983-02-28028 February 1983 Forwards Updated Page to PSAR Chapter 4.4,design Bases Section.Info Concerns Primary Sodium Gas Entrainment & Assembly Flow Blockage Criteria.Page Will Be Submitted W/ Next PSAR Amend ML20071C1391983-02-25025 February 1983 Forwards Addl Info on Psar,Section 13.3 Re Coordination W/State of Nc & Local Officials for Emergency Planning.Info Will Be Incorporated in Next PSAR Amend ML20071B0621983-02-24024 February 1983 Forwards Revised Responses to Mechanical Engineering Branch Items 26 & 70 Re Low Temp Components.Info to Be Included in Next Amend to PSAR ML20071B0301983-02-23023 February 1983 Forwards Amended PSAR Page 10.4-7 Re Consequences of Flooding Due to Failures in Circulating Water Sys.Pages Respond to NRC Questions & Will Be Included in Next PSAR Amend 1985-06-27
[Table view] |
Text
_ _ _ _ _ _.
Department of Energy Washington, D.C. 20545 Docket No. 50-537 HQ:S:83:239 AP!
o; 1933 Dr. J. Nelson Grace, Director CRBR Program Office Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Dr. Grace:
CELL LINER DESIGN VALIDATION PROGRAM - SQUARE PENETRATION ANALYSIS
Reference:
Letter HQ:S:83:231, J. R. Longenecker to J. N. Grace,
" Cell Liner Design Validation Program," dated March 4, 1983 This letter transmits new information related to the Clinch River Breeder i
Reactor Plant Cell Liner Design Validation Program promised in the reference.
Specifically enclosed is the analysis of the wall liner at square penetrations.
Any questions regarding the information provided or further submittals can be addressed to Mr. P. Washer (FTS 626-6179) or Mr. V. Fayne (FTS 626-6394) of %e Project Office Oak Ridge staft.
1 Sincerely, J n R. Longene r
Acting Director, ffice of Breeder Demonstration Projects Office of Nuclear Energy l
Enclosure l
cc: Service List Standard Distribution l
Licensing Distribution l
b l
l 8304060217 830404 PDR ADOCK 05000537 A~
PDR
ENCL.0SURE ATTACHMENT I (1 sheet of 12)
CELL LINER WALL LINER AT SQUARE PENETRATIONS Analyses of the wall liner near a square penetration were considered based on the mathematical model of Figure A-1.
The following ANSYS elements were used in the model:
STIF 48 for the plate, STIF 20 and STIF 8 for the studs and STIF 52 for the interface between the plate and the concrete.
The maximum liner temperature is 670 F.
Table A-1 shows the maximum strains and Figure A-2 shows the calculated buckling pattern in terms of the displacement contours.
The maximum equivalent von Mises strains are:
Plate -
.016 (in/in) (Membrane); 0.033 (in/in) (Membrane plus Bending)
.057 (in/in) (Membrane); 0.142 (in/in) (Membrane Stud plus Bending)
The strain allowables in accordance with the liner design criteria are.105 (in/in) for the membrane strain and 0.141 (in/in) for the membrane plus bending strain.
Liner strains are well below the allowables by a factor of 4.3.
i l
Stud strains are at the maximum allowable for combined membrane plus bending, however this is acceptable because the large strains experienced by stud do not adversely influence the liner integrity.
(2 of 12) m 3st 1
/"
ssz w
4 :f AM%
3 3/8" THICK h6d
'4' 4 u-g
/ '"hlf an LINER 7 N
jsf
,,+
,1MyW%
h h.
a m
@ 5 0 AH s fil'
- ,$j@, b,,,
=(='c"A V%Mpv5V'(%
DgQy$.. ~
l /MYMYM%%'
60" 1
- i. 7 3
.c DETAIL T 2
45 32 1
8 5 6
/
PPN)WWMMM'pM
'~
SEE DETAIL "X" h
3 g
2 f
a 2 = 2-
/
jAl w2 W MW N7 NWN"
- fM' M'#WEXMM A
5,,'N I
l,,,
1" THICK COLLAR e
q:
60" 347 242 525 392 324 652 584 503 496 386 281 579 437 368 663 623 560 552 ELD! INT NUMBERS v
429 317 614 484 410 667 644 600 596 FOR STUDS 476 355 636 533 457 671 657 627 625 FIGURE A-1
'a'ALL LINER AT SOUARE PENETRATION MATEDIATICAL MODEL
(3 of 12)
I N
I T
N
- i
\\ i Ig
\\
-1.
A CONTOUR VALUES y
(INCHES)*
,/
__.. W A..g,3 i ii gj l;
3=-1.6 I
D C+-1.4 g
g f
D=-1.2 g
g g
F
)
1 E*-1 g
l H
T l
p._,g j
K lI
,l C=.6 Ha.4 Hl-i i
4 l
I lg 1
.2 J*e s
y J
K.a
,8 K,'
1 I
I I
i K
i3 l
e
--4b Ml l@,
/,'
I
\\
l l
I
\\
\\
l i
{
i) i l
Negative value indicates displacement away from concrete.
l
\\
FIGURE A-2 WALL LINER AT SQ1%RE PENETRATIONS DISPLACEMENT CONTOURS l
l s1-
--.m4
-m-
- ~ - - -
(4 of 12)
Sheet 1 of 9 TABLE A-1 WALL LINER AT SQUARE PENETRATION ELEMENT M
M+B u--
122 0.001378 0.001556 LINER 144 0.001063 0.001243 LINER 145 0.000875
.O.001131 LINER 146 0.000935 0.001354 LINER 147 0.000900 0.001394 LINER 148 0.000613 0.001153 LINER 168 0.000939 0.001448 LINER 169 0.000S90 0.001430 LINER 170 0.000964 0.001249 LINER 171 0.000876 0.001237
' LINER 172 0.000726 0.001304 LINER 173 0.000591 0.000979 LINER 174 0.000798 0.001210 LINER 175 0.000601 0.001125 LINER 179 0.000585 0.001034 LINER 180 0.000528 0.001050 LINER 181 0.000625 0.001173 LINER 197 0.001052 0.001640 LINER 198 0.000939 0.001233 LINER 199 0.001033 0.001545 LINER 200 0.000957 0.001420 LINER 201 0.000726 0.002015 LINER 202 0.000597
'D.OO1418 LINER 203 0.000705 0.001417 LINER 204 0.000637 0.001652 LINER 208 0.000523 0.001438 LINER 209 0.000496 0.001194 LINER 210 0.000542 0.001027 LINER 212 0.000491 0.000751 LINER 213 0.000532 0.000739 LINER l
215 0.000538 0.001101 LINER 216 0.000544 0.000904 LINER 218 0.000872 0.001956 LINER 219 0.000681 0.001488 LINER 220 0.000817 0.001539 LINER l
l
.._1_._.-....1_._.....
(5 of 12)
Sheet 2 of 9 TABLE A-1 WALL LINER AT SQUARE PENETRATION ELEMENT M_
M+B 221 0.000811 0.001644 LINER 222 0.001096 0.001839 LINER 223 0.000899 0.001238 LINER 224 0.000990 0.001277 LINER 225 0.000953 0.001329 LINER 226 0.000703 0.001741 LINER 227 0.000477 0.001175 LINER 228 0.000562 0.001766 LINER 229 0.000746 0.002168 LINER 231 0.000716 0.001438 LINER 232 0.000568 0.001180 LINER 233 0.000699 0.001496 LINER 234 0.000559 0.001333 LINER 238 0.000468 0.001173 LINER 239 0.000490 0.001630 LINER 240 0.000530 0.001522 LINER 242 0.005539 0.011177 STUD-TCP 242 0.001031 0.001760 STUD-BOTTOM 244 0.000443 0.000627 LINER 246 0.000484 0.000731 LINER 247 0.001059 0.004321 LINER 248 0.000907 0.003789 LINER 250 0.000SS5 0.003750 LINER 251 0.000917 0.003817
. LINER 253 0.000887 0.004040 LINER 254 0.000893 0.004156 LINER 256 0.000397
,0.001552 LINER 258 0.000469
.O.001486 LINER 259 0.000535 0.001639 LINER 260 0.000481 0.001582 LINER 261 0.000594 0.001533 LINER 263 0.000566 0.001476 LINER 264 0.000664 0.001438 LINER 265 0.000610 0.001513 LINER 263 0.000454 0.001631 LINER 272 0.000455 0.001997 LINER i
273 0.000465 0.001188 LINER 274 0.000449 0.001147 LINER 276 0.000411 0.000942 LINER 279 0.000371 0.000593 LINER l
1
-. _. -.. - - - - - - _. _ _.... _. _,.. ~. - - _ -.. -. _ - - - - _ - -.
(6 of 12)
Sheet 3 of 9 TABLE A-1 WALL LINER AT SQUARE PENETRATION ELEMENT
_M.,
M+B 280 0.000418 0.000524 LINER 281 0.001588 0.002615 STUD-TOP 281 0.000743 0.000823 STUD-BOTTOM 284 0.001003 O.004526 LINER 286 0.001243 0.011075 LINER 287 0.002043 O.012220 LINER 288 0.001134 0.004958 LINER 289
' O.OO2611 0.011825 LINER 290 0.002142 0.0108S5 LINER O.001256 0.011090 LINER 292 293 0.001841 0.012126 LINER 295 O.002427 0.011749 LINER 296 0.001947 OcO10815 LINER 293 0.000266 0.000865 LINER i
299 0.000268 0.001015 LINER 300 0.000484 0.0018S6 LINER 302 0.000374
.0.001588 LINER 304 0.000325 O.000957 LINER 305 0.000383 0.001053 LINER 306 0.000352 0.001000 LINER 309 0.000460 0.002299 LINER 312 0.000326 0.000435 LINER 314 0.000343 0.000466 LINER 315 0.001069 0.004583 LINER 316 0.001098 0.004902 LINEA 317 0.000744 0.000824 STUD-TOP 317 0.001494 0.002987 STUD-BOTTOM
' 0.001975 LINER 319 0.000588 320 0.000894 0.002932 LINER 321 0.000640 O.002057 LINER 322 0.000989 0.003080 LINER 324 0.029992 0.109678 STUD-TOP 324 0.016468 0.027740 STUD-BOTTOM 325 0.000742 0.001866 LINER 327 0.002563 O.011751 LINER 329 0.000623 0.001170 LINER 330 0.000734 0.001306 LINER 331 0.000729 0.001675 LINER 332 0.002271 0.010999 LINER l
335 0.000749 0.001724 LINER l
(7 of 12)
Sheet 4 of 9 TABLE A-1 WALL LINER AT SQUARE lENETRATION EdEMENT_
}i M+B 336 0.000644 0.001020 LINER 338 0.000292 0.000702 LINER 339 0.000492 0.002080 LINER 340 0.000446 0.001349 LINER 342 0.000389 0.002091 LINER 345 0.000342 0.000784 LINER 347 0.001803 0.005633 STUD-TOP 347 0.000678 0.001044 STUD-BOTTOM 349 0.001054 0.004222 LINER 351 0.001778 0.011450 LINER 352 0.002123 0.012065 LINER 353 0.000825 0.003375 LINER 355 0.000881 0.001599 STUD-TOP 355 0.004673 0.012504 STUD-BOTTOM 357 0.001263 0.012226 LINER 358 0.001841 0.013E80 LINER 359 0.002972 0.015384 LINER 360 0.002094 0.013623 LINER 363 0.002987 0.015376 LINER 364 0.002204 0.014085 LINER 0.013C97 LINER 366 0.001327 367 0.001981 0.014168 LINER 368 0.019139 0.031586 STUD-TOP 368 0.016679 0.017483 STUD-BOTTOM 370 0.001051 0.012157 LINER 373 0.001250 0.003242 LINER 374 0.002840 0.013454 LINER 0.012775 LINER 375 0.002575 376 0.000612 0.001844 LINER 377 0.001957 0.012837 LINER 380 0.000430 0.001243 LINER 381 0.000453 0.002141 LINER OS2 0.000737 0.003079 LINER 384 0.000418 0.001283 LINER 386 0.001001 0.001281 STUD-TOP 386 0.000599 0.000679 STUD-BOTTOM 393 0.001061 0.003086 LINER 389 0.001666 0.011242 LINER 390 0.002080 0.012113 LINER 392 0.023865 0.100340 STUD-TOP
(8 of 12) l Sheet 5 of 9 1
TABLE A-1 WALL LINER AT SQUARE PENETRATION ELEMENT M
M+B 392 0.011091 0.022317 STUD-BOTTOM 393 0.000662 0.002555 LINER 395 0.001099 0.012900 LINER 396 0.001707 0.013099 LINER 397 0.001864 0.014229 LINER 398 0.001315 0.013048 LINER 401 0.002047 0.012963 LINER 403 0.002647 0.013485 LINER 404 0.001970 0.012810 LINER 0.002614 0.013482 LINER 405 407 0.001707 0.012399 LINER 408 0.001348 0.012535 LINER 410 0.016994 0.017951 STUD-TOP 410 0.017301 0.019396 STUD-BOTTOM 413 0.002866 0.013424 LINER 414 0.003324 0.017475 LINER 415 0.003629 0.016136 LINER 416 0.002583 0.011016 LINER 417 0.003373 0.016260 LINER 419 0.002447 0.014264 LINER 421 0.000424 0.002140 LINER 423 0.000409 0.001773 LINER 424 0.001731 0.010390 LINER 425 0.001945 0.010811 LINER 428 0.000586 0.001507 LINER 429 0.000596 0.000709 STUD-TOP 429 0.001041 0.002505 STUD-BOTTOM 431 0.000457 "0.001940 LINER i
432 0.002115 0.009320 LINER 434 0.001176 0.001833 LINER 435 0.002925 O.011305 LINER 437 0.013582 0.026018 STUD-TOP 437 0.010483 0.011397 STUD-BOTTOM 440 0.000959 0.001807 LINER 441 0.001008 0.001875 LINER 443 0.001051 0.002744 LINER 444 0.001393 0.002894 LINER 445 0.001589 0.004009 LINER 446 0.001421 0.002991 LINER 447 0.002164 0.004940 LINER
(9 of 12)
Sheet 6 of 9 1
TABLE A-1 l
WALL LINER AT SQUARE PENETRATION ELDENT M
M+B 448 0.001132 0.002728 LINER 450 0.001499 0.003S6'8 LINER 453 0.000983 0.001584 LINER 454 0.001244' O.002634 LINER 455 O.000975 0.002743 LINER 457 0.016711 0.018425 STUD-TOP 457 0.019748 0.036863 STUD-BOTTOM 459 0.002297 0.005624 LINER 460 0.001194 0.003607 LINER 462 0.001350 0.003027 LINER l
463 0.003632 0.017897 LINER 464 0.003552 0.O20223 LINER 465 O.001752 0.002963 LINER 468 0.001603 0.010215 LINER 470 0.001162 0.003686 LINER 471 0.000861 0.007130 LINER 472 0.001501 C.002224 LINER 474 0.000561 0.012893 LINER 476 0.000495 0.001451 STUD-TOP 476 0.001811 0.013613 STUD-BOTTOM 478 0.004344 0.010005 LINER 479 0.004688 0.020623 LINER 481 0.002263 O.009052 LINER 482 0.006855
.O 024241 LINER 484 0.010811 O.011893 STUD-TOP 484 0.011519 0.014224 STUD-BOTTOM 486 0.002350 0.010589 LINER 487 0.002910 0.011522 LINER 488 0.002040 0.010063 LINER 489 0.002898 0.011474 LINER 491 0.001643 0.011927 LINER l
493 0.001562 0.010771 LINER 494 0.001470 O.011818 LINER 495 O.001434 0.010719 LINER 496 0.032518 0.099277 STUD-TOP 496 0.014239 0.024783 STUD-BOTTOM 498 0.002014 0.012412 LINER l
500 0.002314 0.014069 LINER 501 0.001409 0.011555 LINER 502 0.001643 0.011633 LINER
(10 of 12)
Sheet 7 of 9 TALLE A-1 WALL LINER AT SQUARE PENETRATION Ef.EMENT M.
M+B l
503 0.030500 0.098500 STUD-TOP 503 0.013134 0.023494 STUD-BOTTOM 506 0.001772 0.009965 LINER 507 0.002533 0.011149 LINER 509 0.002407 0.011841 LINER 511 0.001826 0.011593 LINER 512 0.003091 0.013615 LINER 513 0.003165 0.013733 LINER 514 0.003050 0.003414 LINER 0.002118 0.002972 LINER 516 518 0.004643 0.009143 LINER 519 0.002417 0.011482 LINER 520 0.001868 0.009861 LINER 522 0.002955 0.007773 LINER 525 0.054115 0.132927 STUD-TOP 525 0.043697 0.050398 STUD-BOTTOM 526 0.007124 0.015596 LINER 528 0.007388 0.023391 LINER 529 0.003808 0.008908 LINER 530 0.001748 0.007335 LINER 531 0.007986 0.0245S7 LINER 533 0.010588 0.012635 STUD-TOP 533 0.015338 0.033197 STUD-BOTTOM 535 0.001425 0.002275 LINER 536 0.001416 0.002811 LINER 533 0.001241 0.002483 LINER 539 0.001255 0.002660 LINER 541 0.001215 0.002459 LINER 542 0.001290 0.002600 LINER 544 0.001541 0.002429 LINER 545 0.001537 0.002947 LINER 547 0.001425 0.002290 LINER 548 0.001423 0.002531 LINER 550 0.001137 0.002105 LINER i
551 0.001216 0.002273 LINER 552 0.017716 0.029838 STUD-TOP 552 0.015060 0.015S28 STUD-BOTTOM 554 0.001224 0.002031 LINER l
555 0.001146 0.002091 LINER i
556 0.001162 0.001739 LINER l
l 1
r--
(11 of 12)
Sheet 8 of 9 TABLE A-1 WALL LINER AT SQUARE PESETRATION ELEMENT M
M+B 557 0.000876 0.001724 LINER 560 0.016346 0.028365 STUD-TOP 560 0.013064 0.013322 STUD-BOTTOM 564 0.001055 0.001548 LINER 565 0.002006 0.002943 LINER 566 0.003546 0.004645 LINER 567 0.001862 0.016069 LINER i
568 0.003297 0.012858 LINER 569 0.003251 0.004066 LINER 573 0.005344 0.017701 LINER 574 0.006108 0.010105 LINER 575 O.006074 0.009729 LINER 576 0.007486 0.024407 LINER 578 0.045789 0.053131 STUD-TOP 578 0.044513 0.044550 STUD-BOTTOM 581 0.003136 0.011112 LINER 582 0.006931 0.019352 LINER 533 0.006235 0.011236 LINER 584 0.056494 0.140936 STUD-TOP 584 0.034368 0.045127 STUD-BOTTOM i
536 0.005140 0.012533 LINER 587 0.005925 0.010438 LINER 596 0.015627 0.016782 STUD-TOP I
596 0.015225 0.015964 STUD-BOTTOM 600 0.013713 0.014945 STUD-TOP 600 0.013406 0.014696 STUD-BOTTOM 604 0.006184 0.012161 LINER 605 0.008633
.O.017220 LINER 607 0.005034 0.008763 LINER 603 0.004939 0.007702 LINER 610 0.003012 0.019701 LINER 611 0.000890 0.010942 LINER 614 0.044667 0.044776 STUD-TOP 614 0.044891 0.046SS2 STUD-BOTTOM 615 0.000864 0.015056 LINER 617 0.012289 0.021060 LINER 619 0.012121 0.015269 LINER 620 0.003742 0.005925 LINER j
621 0.010672 0.017217 LINER j
623 0.03860S 0.049994 STUD-TOP l
-....-.......--.n.._....
(12 of 12)
Sheet 9 of 9 TABLE A-1 UALL LINER AT SQUARE PENETRATION ELEMENT M_
M+B 623 0.036893 0.037312 STUD-BOTTOM 625 0.014978 0.015577 STUD-TOP 625 0.016865 0.024445 STUD-BOTTOM 627 0.012944 0.013956
. STUD-TOP STUD-BOTTOM 627 0.015951 0.025738 630 0.007752 0.021766 LINER 631 0.012770 0.026052 LINER 632 0.006380 0.023286 LINER 634 0.001866 0.012759 LINER 636
- O.044528 0.046254 STUD-TOP 636 0.046396 0.068346 STUD-BOTTOM 639 0.005164 0.007102 LINER 64*
0.015557 0.020482 LINER 643 0.014617 0.018A09 LINER 644 0.037260 0.C37914 STUD-TOP 644 0.037111 0.038357 STUD-BOTTOM 646 0.010676 0.021051 LINER 648 0.009782 0.010685 LINER 649 0.013779 0.033311 LINER 650 0.012236 0.027110
, LINER 652 0.041820 0.142196 STUD-TOP 652 0.021258 0.035494 STUD-BOTTOM 654 0.009341 0.027222 LINER 657 0.036875 0.037990 STUD-TOP 657 0.038292 0.052200 STUD-BOTTOM i
659 0.009259 0.017949 LINER 661 0.009185
.0.014457 LINER 663 0.024668 10.040416 STUD-TOP 663 0.021354 0.022147 STUD-BOTTOM 664 0.006343 0.018758 LINER 667 0.022140 0.023556 STUD-TOP 667 0.021220 0.021637 STUD-BOTTOM 671 0.021021 0.021370 STUD-TOP 671 0.023272 0.030175 STUD-BOTTOM Allowable Strains
.105 (in/in) - Membrane
.l!.1 (in/in) - Membrane + Bending l
,.-y---,
.