Category:CORRESPONDENCE-LETTERS
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20151R5611986-01-30030 January 1986 Summarizes 851216 Mgt Meeting at Oak Ridge Operations Ofc to Review & Inspect Redress & Reclamation of Crbr Site.Drawings Reviewed,Discussions Held & Tour of Site Performed.Site Restoration Concluded to Be as Described in Plans & Specs ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20133C7371985-06-14014 June 1985 Further Response to FOIA Request for Documents Re Site Redress Where Plant Const Begun,Including Clinch River Facility & NRC Legal Analysis Re Redress.Forwards App B Documents.App C Document Withheld (Ref FOIA Exemption 5) ML20128R0001985-06-0606 June 1985 Partial Response to FOIA Request for Records Re Desirability of Voluntary or Required Redress of Nuclear Plant Sites Where Work Undertaken But Const No Longer Contemplated. Forwards Documents Listed in App a ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20107M8141984-11-0707 November 1984 Clarifies & Reaffirms Util Commitments Re Redress of Site in Accordance W/Util 840305 Final Site Redress Plan & NRC 840606 Approval of Plan ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20140C6121984-06-18018 June 1984 Advises That Time for Commission to Review ALAB-761 Expired. Commission Declined Review.Decision Became Final Agency Action on 840611.Served on 840618 ML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20128R0161984-02-29029 February 1984 Expresses Thanks for 840222 Review of Site Redress Planning. Concurs W/Conceptual Approach & 1-yr Period for Development of Final Site Redress Plan & Investigation of Potential Use of Site.Ml Lacy Encl ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20081A5601983-08-11011 August 1983 Summarizes 830808 Informal Meeting on Contract Re PRA Review of Crbr (Task 4) & NRC Concerns Associated W/Technology for Energy Corp Deliverables Schedule ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20024D5121983-07-19019 July 1983 Requests Specs for Electrical Power Cable Insulation to Be Used at Facility ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 1986-03-13
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20107M8141984-11-0707 November 1984 Clarifies & Reaffirms Util Commitments Re Redress of Site in Accordance W/Util 840305 Final Site Redress Plan & NRC 840606 Approval of Plan ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20081A5601983-08-11011 August 1983 Summarizes 830808 Informal Meeting on Contract Re PRA Review of Crbr (Task 4) & NRC Concerns Associated W/Technology for Energy Corp Deliverables Schedule ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20024D5121983-07-19019 July 1983 Requests Specs for Electrical Power Cable Insulation to Be Used at Facility ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 ML20073S2761983-05-0505 May 1983 Forwards Revised Responses to SER Item 6 Re Qa,Including Info to Complete Identification of safety-related Structures,Sys & Components Controlled by Crbr QA Program for PSAR.Marked-up Tech Specs Encl ML20073Q3491983-04-28028 April 1983 Forwards Revised Response to SER Item 6, Qa. Response Provides Addl Info Re Identification of safety-related Structures,Sys & Components Controlled by QA Program ML20073R2221983-04-27027 April 1983 Requests to Make Limited Appearance Statement at 830718 CP Hearings Re Regional Socioeconomic Impacts ML20069L1801983-04-27027 April 1983 Informs That Evaluation of Seismic Adequacy of Primary Heat Transport Sys Branch Line & Consequences of Line Failure Being Conducted,In Response to ACRS 830419 Request.Results Will Be Forwarded by 830517 ML20073K3441983-04-18018 April 1983 Forwards Static Tests of 1/20-Scale Models of Crbr Head in Support on LMFBR Safety Program ML20071G2761983-04-18018 April 1983 Recommends That Commission Retain Technical Cadre of Experts to Review Crbr & Overall DOE Breeder Program 1986-03-13
[Table view] Category:RESEARCH INSTITUTION/LABORATORY TO NRC
MONTHYEARML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20027B7031982-09-13013 September 1982 Comments on Draft Suppl to Fes & Objects to Time Restraints on Comments ML20062B1921982-07-30030 July 1982 Package of Eight Comments Supporting Accelerated Site Preparation for Crbr ML20058B1781982-07-0909 July 1982 Urges Issuance of Updated Fes Due to Changes in Reactor Vessel & Fuel Core Design.Original Fes Does Not Adequately Address Issue of Nuclear Waste Disposal ML20076C1111982-06-24024 June 1982 Discusses Potential Need for Addl Funding for Crbr EIS Update Project ML20076C2361982-06-24024 June 1982 Forwards back-up Notes & Refs for Fuel Cycle Portion of EIS Update.Related Info Encl ML20055B2861982-06-15015 June 1982 Discusses Util Cost Estimates for Crbr Studies Per 820518 Request ML20065Q4101982-06-15015 June 1982 Provides Info Re Verification of Reasonableness of Applicant Cost Estimates for Crbr.Applicant Cost Estimate May Be Low Due to Low Escalation Rate & Inadequate Contingency Allowance for Design & Regulatory Evolution ML20076C0101982-06-0909 June 1982 Forwards Backup Calculations for Table D.4,CRBR Fuel Cycle Suppl.Related Info Encl ML20058A6721982-06-0404 June 1982 Suggests Consideration Be Given to Review Listed General Areas & Key Specific Applications within Limits of Design Basis Events ML20076C1281982-05-21021 May 1982 Forwards Final Draft Submittal of Crbr EIS Update,Including Section 5.7.2.6,5.7.2.7,7.2 & 7.3.W/o Encl ML20076C1311982-05-18018 May 1982 Confirms Changes to Final Crbr EIS Draft Update Per 820520 Telcon W/Nrc Safeguards Staff ML20076C1441982-05-0707 May 1982 Forwards Second Draft of Crbr EIS Update,Including Section 5.7.2.6, Transportation of Radioactive Matl, Section 5.6.2.7 Fuel Cycle Impacts & Section 7.3, Safeguards Considerations. W/O Encl ML20076C0061982-04-20020 April 1982 Forwards Revised Origen 2 Output for Crbr.Averaging Procedures Altered for Agreement Between Flows & Physical Mass ML20065D6581982-04-0505 April 1982 Forwards Summary ORIGEN2 Output for Crbr.Scope of Output, Assumptions Employed & Potentially Relevant Backup Info Encl ML20041B3181982-02-17017 February 1982 Forwards Questions for Submittal to Facility Project Ofc Re PSAR Sections 4.2,15.1 & 15.2.Question 13 Was Rendered Moot on Further Review of PSAR & Is Not Included ML20052D6541982-02-0808 February 1982 Summarizes Crbr Subcommittee 820202-03 Meeting in Washington,Dc ML20052D5711981-12-28028 December 1981 Recommends Comprehensive Review of Reactor by Acrs,Assisted by Appropriate Subcommittees & Ad Hoc Task Force of Experts. Advantages & Disadvantages of LMFBR Presented ML20052D5991981-12-28028 December 1981 Recommends Establishment of Ad Hoc pre-eminent Advisory Review Panel to Assist ACRS in Review of Crbr ML20042A8951981-12-16016 December 1981 Summarizes Striped Bass (Monroe Saxatilis) Situation Near Facility in Response to 811214 Telcon.Facility Is Cool Thermal Refuge for Adult Bass.Greatest Abundance Appear Along Steep Banks.Rept Re Fish Habitat Encl 1983-11-15
[Table view] |
Text
r
, // $$nf SOUTHWEST RESEARCH AND INFORMATION CENTER September 13, 1982 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Director, Clinch River Breeder Reactor Program Of fice
Dear Director:
Southwest Research & Infomation Center is submitt.ing these comments on the NRC's Draf t Supplement to the Final Environmental Statement on the CRBRP, Docket No. 50-537, NUREG-0139, Draft Supplement. We are an educational and scientific organization working primarily on energy and environmental issues.
A number of our supporters live near the Clinch River site, and people across the nation are concerned about the impacts of the Breeder Program.
First, we want to strongly object to the procedures used in obtaining comments on this draft. Section 1506.10(c) of CEQ's NEPA regulations requires "not less than 45 days for comments on draf t statements." NRC is giving only the mininum 45 days from the publication of the Federal Register notice, which in our case is only 31 days from the time of the actual receipt of the document.
(
(This short availability to us is despite our request of June 9,1982 that there be a supplement and that we receive the Supplement when is was N a:
g prepared.) Additionally, we received the Errata Sheet for the supplement only O'O 88 9 days prior to the comment deadline for the supplement. Thus, we have o
g clearly been ef fectively denied the minimum requirement of a 45 day comment i
Odu
@@ period. Thus, we would request an additional 15 day comment period from the 7 time that we are notified that such a comment period is available. Because of gg (D O, O the inadequate time given to us to comment on the document, these comments are admittedly less detailed than we would me otherwise prepared.
- P.O. BOX 4524 ALBUQUERQUE NEW MEXICO 87106 505 - 262-1862
Both the FES and the Supplement are grossly inadequate in discussing transpcrtation issues. The Safe Secure Transport (SST) is not described in any adequate way for either NRC or the public to realistically evaluate its safety. The discussion of Type B packages on pages 7-3 to.7-5 and in Appendix D fails to mention that packaging for the wastes from the CRBR de not exist.
Thus, the public putting faith in the assertion that the packages "are designed to withstand severe accident environments" is akin to saying that the DC-9 was designed to fly safely. Design and actual performance are not the same, especially regarding nuclear waste transportation where over the next 15 ,
years the nation faces totally unprecedented numbers of shipments of commercial spent fuel and TRU wastes and of military high level and TRU wastes. A point that will also be emphasized later is that there is inadequate discussion of the origen of the initial fuel for CRBR, including its transportation to the site.
A point of substantial concern to us and the public generally is the environmental and health consequences of releases of plutonium and other radioactive materials. Since several of the changes in the Errata Sheet deal with this issue, we are especially concerned about the ridiculously short communt period on this data. Suffice to say that there are clear inadequacies in the numbers given. Specifically, there is no indication that the Staff has considered the studies of Dr. E.A. Martell (" Basic Considerations in the Assessment of the Cancer Risks and Standards for Internal Alpha Emitters,"
J an . 10, 1975, Statement at hearings by EPA on plutonium standards and, with S.E. Poet. " Plutonium-239 and Americium-241 Contamination in the Denver Area,"
Health Physics , Oct.1972, pp. 537-548) and K.Z. Morgan (" Suggested Reduction 2
O e
of Permissible Exposure to Plutonium and Other Transuranium Elements,"
American Industrial Hygiene Association Journal, August 1975, pp. 567-575) on acceptable levels of plutonium for workers or the public. There is no adequate discussion of the impacts of Plutonium-238, Plutonium-241 and Americium-241 on the biota, despite the fact that significant scientific research shows that compounds of americium may be taken up by plants from the soil more readily than plutonium (see, for example, John T. Edsall, " Toxicity 1f plutonium and some other actinides," Bulletin ojf the Atomic Scientists, Sept. 1976, pp. 27-37). Thus, while we have not had adequate time to arrive at alternative calculations, we feel strongly that the doses mentioned in the Supplement for releases of effluents from CRBRP facilities are not conservative and that they could be understated by significant amounts. -
Further, it is unclear how the doses in Tables A5.2 and AS.3 were in fact arrived at. There is no indication of why the site boundary was changed from "0.4 miles SSW" on page 5-22 of the FES to "0.44 miles NW" on page 5-12 of the Supplement. Even more amazingly, page 5-23 of the FES indicated that discharge "would be fully diluted by a factor of 670 over the un, mixed plant discharge;" while the Supplepent (page 5-18) says the discharge "would be fully diluted by a factor of 67 over the unmixed plant discharge." Are either of these numbers correct? If so, how do we know it to be true? Why the great change, which from our view has to have environmental impacts? Additionally, Appendix D apparently does not even draw on existing data of dose releases from the West Valley facility; data which are certainly relevant and applicable to Clinch River. Uniform dispersion will not occur, so why is that assumed? All of these omissions of other scientific data and analysis that is known to NRC staff can o'nly lead to the conclusion that they were intentionally ignored--a totally unacceptable and inadequate discussion for a FES or a Supplement.
3
~
We find no adequate discussion of th+ cumulative and potentially synergistic ;
effects of other activities in the nearby area. For example, we understand that a synfuels plant is to operate in the area. What are the impacts of the synfuels facility and the CRBR? Such analysis is necessary' to adequately inform decision-makers on either project. Additionally, the impacts of dredging on the rivers in the area is mentioned on page 4-28 only in relation to fish spawning; however potential releases of radioactive materials that are not initially taken up by the biota are certainly possible and must be analyzed not only for the initial dredging (page 4-28) but also for that dredging necessary during the lifetime of the f acility. There is no indication in.the Supplement that an adequate, comprehensive study of these issues has been done.
Regarding safeguards issues, we find no adequate discussion of possible theft of plutonium and especially no discussion of potential sabotage by terrorists.
For both environmental and legal reasons such a discussion is necessary, and it should have been done in this Supplement if there is any possibility that ,
t such sabotage could take place.
Thank you for your consideration of these comments. We hope to hear from you i
soon regarding an extension of time for us and any other members of the public who were given inadequate time to comment on the Supplement.
Sincerely, Don Hancock Information Coordinator 4
1
, ,,. .-. . - , , . . - . , , ..- . . - - - _ _ _ . - -