ML20009G444

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 810421-24
ML20009G444
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/10/1981
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20009G436 List:
References
50-324-81-09, 50-324-81-9, 50-325-81-09, 50-325-81-9, NUDOCS 8108040269
Download: ML20009G444 (2)


Text

, -

-=.

t f

APPENDIX A NOTICE OF VIOLATION 1

Carolina Power and Light Company Docket Nos. 50-325, 50-324 Brunswick Steam Electric Plant License Nos. DPR-71, DPR-62 i

As a result of the inspection conducted on April 21-24, 1981, and in accordance 1

with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980), the fellowing violat'.ons were identified.

l A.

Appendix B Technical Specification 4.2.3 (Surface Water Sampling) requires, i

in part, that automatic intermittent water samplers collect monthly samples j

from the intake and discharge canals.

l Contrary to the above, as of April 24, 1981, automatic intermittent surface 4

j water sampling of the intake canal (Sampling Station 48) had never been implemented.

This is a Severity Level V Violation (Supplement VII.E) l B.

Appendix B Technical Specification 5.3 requires, in part, development of J

quality assurance procedures for monitoring, sample collection, ar.d sample i

analysis.

Contra ry to the above, the licensee failed to develop written quality assurance procedures for periodic calibration of dry gas meters associated with air partic~ulate monitors located at the designated monitoring stations

{

listed ir. Appendix B Technical Specification 4.2, Table 4.2-1.

This is a Severity Level V Violation (Supplement VII.E).

i l

C.

Appendix B Technical Specification 4.2 states that any location from which milk samples can no.onger be obtained may be dropped from the surveillance 4

l program. The subject specification requires that the NRC will be notified in writing within 30 days with an explanation of why milk can no longer be i

obtained from that location.

Contrary to the above, the licensee. failed to meet the 30 day notification requirement following disclosure that weekly milk samples could no loncer be i

obtained from Sampling Station 36 (Lewis Farm) during routine sampling on l

March 9, 1981.

This is a Severity Level V Violation (Supplement VII.E).

8108040269 810715 PDR ADOCK 05000324 G

PDR-

Appendix A 2

Docket Nos. 50-325, 50-324 Notice of Violation License Nos. OPR-71, CPR-62 D.

Appendix B Environmental Technical Specification 5.3 requires that temporary changes to prccedures which do not change the intent of the original proce-dure may be made. providcd such changes are approved by two members of the management staff Such changes will be documented, and subsequently reviewed by the Plant Nuclear Safety Committee and approved by the Plant Manager prior to implementation as permanent procedure cnanges.

Contrary to the above. as of April 24, 1981, the l icensee f a llec to meet the approval reauirements for temporary changes made to procedures RC-ER-12 (Determination of Gross Alpha and Eeta in Water) and RC-ER-18 (Quality Control for Beta-Gamma Coincidence System.

This is a Severity Level V Violation (Supplement VII.E).

Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within twenty-five days of the date of this Notice, a written state-ment or explanation in reply, including: (1) admission or denial of the alleged vic ations; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and tr,e results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this resporse shall be submitted under oath or affirmation.

Date:

.