Person / Time | |
---|---|
Site: | Brunswick |
Issue date: | 06/10/1981 |
From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | |
Shared Package | |
ML20009G436 | List: |
References | |
50-324-81-09, 50-324-81-9, 50-325-81-09, 50-325-81-9, NUDOCS 8108040269 | |
Download: ML20009G444 (2) | |
Similar Documents at Brunswick | |
---|---|
Category:NOTICE OF VIOLATION OF A REGULATION
MONTHYEARML20198P0261998-12-21021 December 1998
[Table view]Notice of Violation from Insp on 981011-1121.Violation Noted:On 981030,licensee Failed to Correctly Shutdown & Verify That Unit 1 Standby Gas Treatment Sys in Standby Alignment Per Section 7.1 of Procedure 1OP-10 ML20195G4191998-11-0909 November 1998 Notice of Violation from Insp on 980830-1010.Violation Noted:On 980916,licensee Failed to Perform Section 7.1.5 of Procedure OMST-RHR-28Q as Required When Returning Flow Transmitter E11-FT-3338 to Service ML20237B9211998-08-11011 August 1998 Notice of Violation from Insp on 980607-0718.Violation Noted:Licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Documented Instructions in Procedures for Listed Examples ML20236N9451998-07-0606 July 1998 Notice of Violations from Insp on 980426-0606.Violations Noted:On 980521,licensee Made Temporary Procedure Change That Altered Intent of Maint Surveillance Test 1MST-DG11R, DG-1 Loading Test,By Substituting 25 for 50 Horsepower Load ML20249A2191998-06-0101 June 1998 Notice of Violation from Insp on 980315-0425.Violation Noted:On 980331 Licensee Failed to Accomplish Scaffolding Erection Activities in Accordance W/Documented Procedure OMMM-022 ML20216H4341998-04-16016 April 1998 Notice of Violation from Insp on 980209-13,0309-12 & 16-20. Violation Noted:On 970603,licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Procedure EGR-NGGC-0005 ML20217C8011998-03-16016 March 1998 Notice of Violation from Insp on 980126-30.Violation Noted: Rev 46 to Licensee Emergency Plan Decreased Effectiveness of Plan That Adopted Regulatory Provision for Biennial Exercise ML20216B1621998-03-0202 March 1998 Notice of Violation from Insp on 971228-980131.Violation Noted:On 971203 & 971230,for Unit 1 & 971203,971210 & 971220 & 980104 for Unit 2,Condition Repts Were Not Initiated to Address Repetitive Failures of Plant Computer IR 07100109/20120271998-01-23023 January 1998 Notice of Violation from Insp on 971109-1227.Violation Noted:On 971209,inspector Determined That Licensee Had Not Maintained Data Sheets or Logs for Equipment Alignment ML20198N6461997-12-30030 December 1997 Notice of Violation from Insp on 971209-12.Violation Noted: on 971118,locked High Radiation Area Was Left Unattended & Entrance Was Not Secured W/Designated Special cal-core Locks Prior to Leaving Area Unguarded ML20198P0561997-12-23023 December 1997 NOV from Insp Completed on 971113.Violation Noted:Licensee Failed to Promptly Correct Condition Adverse to Quality Re Unit 1 High Drywell Temp Condition ML20197H1691997-12-0808 December 1997 Notice of Violation from Insp on 970928-1108.Violation Noted:On 970923,torus Master clearance,2-97-555 Was Not Adequate to Prevent Draining of Water Into Unit 2 Torus ML20199C2381997-10-27027 October 1997 Notice of Violation from Insp on 970819-0927.Violations Noted:On 970917,licensee Failed to Enter ASSD Impairment Upon Inability to Energize Breaker DE9 on Motor Control Ctr 1XA for 1-E11-F006A,RHRP 1A Shutdown Cooling Suction Valve ML20211E8771997-09-15015 September 1997 Notice of Violation from Insp on 970706-0816.Violations Noted:Ionization Fire Detection Test Procedure Was Not Implemented to Assure Satisfactory Performance of Ionization Detectors as Evidenced as Listed ML20198F3991997-08-0101 August 1997 Notice of Violation from Insp on 970525-0705.Violation Noted:Licensee Failed to Properly Implement Procedural Requirements as Evidenced by Listed Examples ML20140D1701997-05-12012 May 1997 Notice of Violation from Insp on 970302-0412.Violation Noted:On 961212 & 970226,performance of Maintenance Surveillance Test Procedure 1MST-CS21Q,CS Sparger High Dp Chan Cal,Licensee Failed to Verify Core Spray Setpoint ML20138J5861997-05-0202 May 1997 Notice of Violation from Insp on 970303-0404.Violation Noted:Effect of Improperly Installed Seals for Installation of Rosemount Transmitters 2-G31-FT-N012,N036 & N041 Was Not Evaluated for 30 Days Reportability Requirement to NRC ML20137T5551997-03-31031 March 1997 Notice of Violation from Insp on 970119-0301.Violation Noted:Two Qualified Radwaste Operators Failed to Follow Operating Procedure Which Resulted in Valve 2-G16-V1116 Found in Open & Unlocked Position in Liquid Release Stream ML20134P1361997-02-14014 February 1997 Notice of Violation from Insp on 961208-970118.Violation Noted:On 961212,licensee Measures Failed to Assure That Unit 2 RHR Discharge Pressure Gauges Properly Calibr During Performance of Periodic Test ML20133H3331997-01-0202 January 1997 Notice of Violation from Insp on 961027-1207.Violation Noted:Procedural Requirements Not Met for Listed Examples for Structural Modifications on Instrument Rack 1-H21-P022 Containing Reactor Pressure Switch 1-B32-PS-N018B ML20132G8671996-12-13013 December 1996 Notice of Violation from Insp on 961113-15.Violation Noted: on 961108,licensee Failed to Rept Lock Tampering Events to NRC within One Hour ML20132E6461996-12-13013 December 1996 Notice of Violation from Insp on 961026.Violations Noted: Failure to Operate Facility within Steady State Reactor Core Power Level Limit of 2436 Mw (Thermal).W/Handouts from 961209 Predecisional Enforcement Conference ML20134Q3501996-11-22022 November 1996 Notice of Violation from Insp on 960915-1026.Violation Noted:Licensee Failed to Correct Adverse Condition Which Resulted in History of Chlorine Detector Failures ML20135A1891996-11-19019 November 1996 Notice of Violation & Proposed Imposition of Civil Penalties in Amount of $150,000 for Violations Noted During Insp on 960624-0917.Violations Noted:Licensee Failed to Include RG Laurence Solenoid Valves in PASS & RHR Sys ML20129H0981996-10-11011 October 1996 Notice of Violation from Insp on 960804-0914.Violation Noted:While Performing PT OPT-20.8.2,1-CAC-AT-4410 Leak Test,Ro Positioned CAC Sample Select Switch Which Was Under Clearance W/O OAI-58 Required Temporary Tag Lift,On 960821 ML20059G1301993-12-30030 December 1993 Notice of Violation from Insp on 931129-1203.Violation Noted:Certain Portions of Unit 1 Mod 92-049 Not Implemented in Accordance W/Design Instructions of Mod Package ML20059L0441993-11-10010 November 1993 Corrected Notice of Violation from Insp on 930726-0903. Violation Noted:Nrc Identified That Instructions Specified in WR Wr/Jo 93-AFNW1 for Repairs to Unit 1 Drywell Liner Plate Were Not Appropriate to Evaluate ML20059K5391993-11-0404 November 1993 Notice of Violation from Insp on 930904-1008.Violation Noted:Several Boxes of LPRM Cables Were Stored in Polyethylene Bags That Had Been Opened & Were Not Properly Resealed ML20059A3451993-10-15015 October 1993 Notice of Violation from Insp on 930913-17.Violation Noted: Licensee Physician Made Determination That Each of Four Operators Eyesight No Longer Met Min Stds & Failed to Notify NRC of Medical Change ML20057E7591993-10-0101 October 1993 Notice of Violation from Insp on 930726-0903.Violations Noted:Backfill Matls Placed Over & Around safety-related Portion of Replacement Svc Water Piping Not Classified as safety-related ML20057E7351993-10-0101 October 1993 Notice of Violation from Insp on 930801-0903.Violation Noted:Employee Entered Protected Area W/Unescorted Access on 930802,after Absence of 47 Days,Approximately Three Hours After Chemical Testing ML20057E3871993-09-24024 September 1993 Notice of Violation from Insp on 930823-27.Violation Noted: Testing Accomplished During Station start-up Testing to Demonstrate That EDG 2X LOCA Jet Assist Feature Would Perform in Svc as Required by Applicable Design Inadequate ML20056D2471993-07-29029 July 1993 Notice of Violation from Insp on 930605-0702.Violation Noted:Fork Truck Operator Failed to Obtain Shift Supervisor Approval Prior to Entry W/Fork Truck Vehicle Loaded W/ Equipment Into Transformer Yards ML20046B7241993-07-15015 July 1993 Notice of Violation from Insp on 930614-18.Violation Noted: Cable Trays 54M/DB & 56M/DA Did Not Meet Requirements of Electrical Specs 048-004 ML20056D1621993-07-0202 July 1993 Notice of Violation from Insp on 930601-04.Violations Noted: Auxiliary Operator Assigned Alarming Dosimeter to Another Individual for Use in Accessing Posted High Radiation Areas ML20036C3141993-05-28028 May 1993 Notice of Violation from Insp on 930403-30.Violation Noted: Measures Not Adequately Established to Correct Deficiencies Similar to Those Described in NOV (Violation B) ML20036B7151993-05-20020 May 1993 Notice of Violation from Insp on 930413-21.Violation Noted: as of 930421,NRC Identified Short Term Structural Integrity Cumulative Effects Walkdowns Performed to Evaluate Items in Unit 2 Drywell,Accomplished W/O Using Documented Procedures ML20056C1811993-03-25025 March 1993 Notice of Violation from Insp on 930222-26.Violation Noted: Inadequate Work Packages Completed,In That Hydrostatic Test Procedures & Hold Times Specified & Used After Replacement of Piping in Two Fire Protection Suppression Sys Incorrect ML20035D4371993-03-19019 March 1993 Notice of Violation from Insp on 930208-12 & 17-19. Violations noted:10 Controlled Volumes of Pep in EOF Were Not Maintained & Contained Incorrect Rev of Pep 2.6.21, Emergency Communicator ML20044B9871993-03-0404 March 1993 Notice of Violation from Insp on Stated Dates.Violation Noted:Depth & Extent of Corrosions of Drywell Liner Plate at Intersection of Interior Concrete Floor & Interior Drywell Liner Plante Around Circumference of Drywell,Not Measured ML20034F0801993-02-10010 February 1993 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $225,000.Violation Noted:Licensee Failed to Adequately Establish or Implement Measures to Promptly Identify & Correct Deficiencies W/Edg Room Masonry Walls ML20128F8881993-01-28028 January 1993 Notice of Violation from Insp on 921201-31.Violations Noted: Starting & Stopping of DG 2 for Performance of DG 2 Monthly Load Test CPT 12.2B Not Recorded in Shift Supervisors Log, Only Permanent Plant Record ML20128A8421993-01-21021 January 1993 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Noncompliance Noted:On 920922 Licensee Retrieved & Handled Startup Source Holder Containing Source That Was Neither Properly Labeled Nor Identified on Record ML20125C7031992-11-27027 November 1992 Notice of Violation from Insp on 921003-31.Violation Noted: Reactor Operator Whose License Had Become Inactive 921001, Was Permitted to Assume Balance of Plant Reactor Operator Watch on Unit 2.Operator Continued Watches Until 921028 ML20125E5451992-11-25025 November 1992 Notice of Violation from Insp on 921002-30.Violation Noted: Procedures Were Not Adequately Implemented in That Unit 1 RO Did Not Obtain SRO Approval Prior to Initiation of Evolution Affecting CR Indication ML20128C0611992-11-24024 November 1992 Notice of Violation from Insp on 920923-28 & 1026-30. Violations Noted:Four Examples of Persons Failing to Sign on to RWP 0531,Rev 1 & 1908,Rev 3 Prior to Commencing Work in Radiation Control Area Were Identified ML20126D8661992-11-20020 November 1992 Notice of Violation from Insp on 921005-09 & 19-23. Violation Noted:Deficiencies Noted in Rev 2 to Bechtel Procedure WPD-002 Re Phase II Walkdowns for Reactor Bldg & Drywell Platform Steel Not Promptly Corrected ML20138G1711991-03-0707 March 1991 Notice of Violation from Insp on 910204-08.Violation Noted: Plant Shipped LSA Shipment on 910131 in Which One Package Shipped Had Metal Fracture Approx 4 to 8 Millimeters Long ML20217B3201991-02-21021 February 1991 Notice of Violation from Insp on 901203-1214.Violations Noted:Util Did Not Record Interpretation of Porosity in Radiographic View 2-3 of Weld in Field Replacement of Rcrs Piping in Unit 1 ML20058K2491990-11-30030 November 1990 Notice of Violation from Insp on 900801-0907 & Augmented Insp on 900821-25 1998-08-11 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARPNO-II-99-045, on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph1999-10-18018 October 1999
[Table view]PNO-II-99-045:on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph IR 05000324/19990061999-10-0606 October 1999 Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support PNO-II-99-037K, on 990916,Hurricane Floyd Was Located Approx 40 Miles East of Greensville,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 76.7 West. Both Units of BSEP Remain in Csd & Surry Is in NOUE1999-09-16016 September 1999 PNO-II-99-037K:on 990916,Hurricane Floyd Was Located Approx 40 Miles East of Greensville,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 76.7 West. Both Units of BSEP Remain in Csd & Surry Is in NOUE PNO-II-99-037J, on 990916,Hurricane Floyd Was Located Approx 25 Miles north-northeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 34.5 North & Longitude 77.6 West.Bsep Units Remain in Csd & Surry Units Are in NOUE1999-09-16016 September 1999 PNO-II-99-037J:on 990916,Hurricane Floyd Was Located Approx 25 Miles north-northeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 34.5 North & Longitude 77.6 West.Bsep Units Remain in Csd & Surry Units Are in NOUE PNO-II-99-037M, on 990916,Hurricane Floyd Was Located Approx 83 Miles Northeast of Surry Nuclear Facility.Ctr of Hurricane Was Estimated Near Latitude 37.8 North & Longitude 75.2 West.Brunswick & Surry Plants Exited NOUE1999-09-16016 September 1999 PNO-II-99-037M:on 990916,Hurricane Floyd Was Located Approx 83 Miles Northeast of Surry Nuclear Facility.Ctr of Hurricane Was Estimated Near Latitude 37.8 North & Longitude 75.2 West.Brunswick & Surry Plants Exited NOUE PNO-II-99-037L, on 990916,Hurricane Floyd Was Located Approx 18 Miles east-southeast of Norfolk,Va.Ctr of Hurricane Was Estimated Near Latitude 36.8 & Longitude 76.0 West.Both BSEP Units Remain in Csd & Surry Continues to Be NOUE1999-09-16016 September 1999 PNO-II-99-037L:on 990916,Hurricane Floyd Was Located Approx 18 Miles east-southeast of Norfolk,Va.Ctr of Hurricane Was Estimated Near Latitude 36.8 & Longitude 76.0 West.Both BSEP Units Remain in Csd & Surry Continues to Be NOUE PNO-II-99-037F, on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph1999-09-15015 September 1999 PNO-II-99-037F:on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph PNO-II-99-037G, on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph1999-09-15015 September 1999 PNO-II-99-037G:on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph PNO-II-99-037E, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph1999-09-15015 September 1999 PNO-II-99-037E:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph PNO-II-99-037D, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph1999-09-15015 September 1999 PNO-II-99-037D:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph PNO-II-99-035, on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 9908311999-08-31031 August 1999 PNO-II-99-035:on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 990831 PNO-II-99-033, on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained1999-08-30030 August 1999 PNO-II-99-033:on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained IR 05000324/19990051999-08-27027 August 1999 Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant Support IR 05000324/19990041999-07-19019 July 1999 Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program Review IR 05000324/19990031999-06-0707 June 1999 Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19990101999-05-0606 May 1999 Insp Repts 50-261/99-10,50-324/99-10,50-325/99-10 & & 50-400/99-10 on 990310,18,19 & 25.Five Apparent Violations Identified:Failure to Review & Evaluate Background Info for Persons Granted Unescorted AA IAW 10CFR73.56(b)(3) IR 05000324/19990021999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support IR 05000324/19980141999-03-18018 March 1999 Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Activities IR 05000324/19980111999-01-28028 January 1999 Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant Support IR 05000324/19980101998-12-21021 December 1998 Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics Insp ML20198P0261998-12-21021 December 1998 Notice of Violation from Insp on 981011-1121.Violation Noted:On 981030,licensee Failed to Correctly Shutdown & Verify That Unit 1 Standby Gas Treatment Sys in Standby Alignment Per Section 7.1 of Procedure 1OP-10 PNO-II-98-050, on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary1998-11-24024 November 1998 PNO-II-98-050:on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary IR 05000324/19980131998-11-24024 November 1998 Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support IR 05000324/19980091998-11-0909 November 1998 Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20195G4191998-11-0909 November 1998 Notice of Violation from Insp on 980830-1010.Violation Noted:On 980916,licensee Failed to Perform Section 7.1.5 of Procedure OMST-RHR-28Q as Required When Returning Flow Transmitter E11-FT-3338 to Service IR 05000324/19980081998-09-28028 September 1998 Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-039C, on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility1998-08-27027 August 1998 PNO-II-98-039C:on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility PNO-II-98-039D, on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens1998-08-27027 August 1998 PNO-II-98-039D:on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens PNO-II-98-039A, on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area1998-08-26026 August 1998 PNO-II-98-039A:on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area PNO-II-98-039B, on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported1998-08-26026 August 1998 PNO-II-98-039B:on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported PNO-II-98-039, on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site1998-08-25025 August 1998 PNO-II-98-039:on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site IR 05000324/19980071998-08-11011 August 1998 Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20237B9211998-08-11011 August 1998 Notice of Violation from Insp on 980607-0718.Violation Noted:Licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Documented Instructions in Procedures for Listed Examples ML20236N9451998-07-0606 July 1998 Notice of Violations from Insp on 980426-0606.Violations Noted:On 980521,licensee Made Temporary Procedure Change That Altered Intent of Maint Surveillance Test 1MST-DG11R, DG-1 Loading Test,By Substituting 25 for 50 Horsepower Load IR 05000324/19980061998-07-0606 July 1998 Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000261/19980101998-06-29029 June 1998 Insp Repts 50-261/98-10,50-324/98-12,50-325/98-12 & 50-400/98-12 on 980601-04.No Violation Noted.Major Areas Inspected:Plant Support.Areas Specifically Evaluated,Access Authorization & Fitness for Duty Programs IR 05000324/19983001998-06-15015 June 1998 NRC Operator Licensing Exam Repts 50-324/98-300 & 50-325/98-300 on 980508-15.Six SRO & Four RO Candidates Tested.All Passed Exam.One Candidate Identified as Having Some Performance Weaknesses ML20249A2191998-06-0101 June 1998 Notice of Violation from Insp on 980315-0425.Violation Noted:On 980331 Licensee Failed to Accomplish Scaffolding Erection Activities in Accordance W/Documented Procedure OMMM-022 ML20216H4341998-04-16016 April 1998 Notice of Violation from Insp on 980209-13,0309-12 & 16-20. Violation Noted:On 970603,licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Procedure EGR-NGGC-0005 ML20216H4431998-04-16016 April 1998 Insp Repts 50-324/98-04 & 50-325/98-04 on 980209-13,0309-12 & 16-20.Violations Noted.Major Areas inspected:follow-up on Licensee Corrective Actions for Electrical Equipment Environ Qualification & Review of Instrument Response Time Testing IR 05000324/19980031998-04-13013 April 1998 Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional Inspectors ML20217C8011998-03-16016 March 1998 Notice of Violation from Insp on 980126-30.Violation Noted: Rev 46 to Licensee Emergency Plan Decreased Effectiveness of Plan That Adopted Regulatory Provision for Biennial Exercise IR 05000324/19980011998-03-16016 March 1998 Insp Repts 50-324/98-01 & 50-325/98-01 on 980126-30. Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise IR 05000324/19970151998-03-0202 March 1998 Insp Repts 50-324/97-15 & 50-325/97-15 on 971228-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20216B1621998-03-0202 March 1998 Notice of Violation from Insp on 971228-980131.Violation Noted:On 971203 & 971230,for Unit 1 & 971203,971210 & 971220 & 980104 for Unit 2,Condition Repts Were Not Initiated to Address Repetitive Failures of Plant Computer IR 05000324/19970131998-01-23023 January 1998 Insp Repts 50-324/97-13 & 50-325/97-13 on 971109-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support.Includes Results of Maint, Engineering & FP Insps IR 07100109/20120271998-01-23023 January 1998 Notice of Violation from Insp on 971109-1227.Violation Noted:On 971209,inspector Determined That Licensee Had Not Maintained Data Sheets or Logs for Equipment Alignment ML20198N6461997-12-30030 December 1997 Notice of Violation from Insp on 971209-12.Violation Noted: on 971118,locked High Radiation Area Was Left Unattended & Entrance Was Not Secured W/Designated Special cal-core Locks Prior to Leaving Area Unguarded IR 05000324/19970141997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings ML20198P0561997-12-23023 December 1997 NOV from Insp Completed on 971113.Violation Noted:Licensee Failed to Promptly Correct Condition Adverse to Quality Re Unit 1 High Drywell Temp Condition 1999-09-16 |
Text
, -
-=.
t f
APPENDIX A NOTICE OF VIOLATION 1
Carolina Power and Light Company Docket Nos. 50-325, 50-324 Brunswick Steam Electric Plant License Nos. DPR-71, DPR-62 i
As a result of the inspection conducted on April 21-24, 1981, and in accordance 1
with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980), the fellowing violat'.ons were identified.
l A.
Appendix B Technical Specification 4.2.3 (Surface Water Sampling) requires, i
in part, that automatic intermittent water samplers collect monthly samples j
from the intake and discharge canals.
l Contrary to the above, as of April 24, 1981, automatic intermittent surface 4
j water sampling of the intake canal (Sampling Station 48) had never been implemented.
This is a Severity Level V Violation (Supplement VII.E) l B.
Appendix B Technical Specification 5.3 requires, in part, development of J
quality assurance procedures for monitoring, sample collection, ar.d sample i
analysis.
Contra ry to the above, the licensee failed to develop written quality assurance procedures for periodic calibration of dry gas meters associated with air partic~ulate monitors located at the designated monitoring stations
{
listed ir. Appendix B Technical Specification 4.2, Table 4.2-1.
This is a Severity Level V Violation (Supplement VII.E).
i l
C.
Appendix B Technical Specification 4.2 states that any location from which milk samples can no.onger be obtained may be dropped from the surveillance 4
l program. The subject specification requires that the NRC will be notified in writing within 30 days with an explanation of why milk can no longer be i
obtained from that location.
Contrary to the above, the licensee. failed to meet the 30 day notification requirement following disclosure that weekly milk samples could no loncer be i
obtained from Sampling Station 36 (Lewis Farm) during routine sampling on l
March 9, 1981.
This is a Severity Level V Violation (Supplement VII.E).
8108040269 810715 PDR ADOCK 05000324 G
PDR-
Appendix A 2
Docket Nos. 50-325, 50-324 Notice of Violation License Nos. OPR-71, CPR-62 D.
Appendix B Environmental Technical Specification 5.3 requires that temporary changes to prccedures which do not change the intent of the original proce-dure may be made. providcd such changes are approved by two members of the management staff Such changes will be documented, and subsequently reviewed by the Plant Nuclear Safety Committee and approved by the Plant Manager prior to implementation as permanent procedure cnanges.
Contrary to the above. as of April 24, 1981, the l icensee f a llec to meet the approval reauirements for temporary changes made to procedures RC-ER-12 (Determination of Gross Alpha and Eeta in Water) and RC-ER-18 (Quality Control for Beta-Gamma Coincidence System.
This is a Severity Level V Violation (Supplement VII.E).
Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within twenty-five days of the date of this Notice, a written state-ment or explanation in reply, including: (1) admission or denial of the alleged vic ations; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and tr,e results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this resporse shall be submitted under oath or affirmation.
Date:
.