ML20009G442
| ML20009G442 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 06/10/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20009G436 | List: |
| References | |
| NUDOCS 8108040265 | |
| Download: ML20009G442 (2) | |
See also: IR 05000324/1981009
Text
._ _
_
._
.. _
[
UNITED STAT;
OFFICIAL COPY
Mg
,
[%
"
NUCLEAR REGULATORY ~)MMISSION
3 ,,
- .;
a s
REGION 11
o, K' '
,f
101 MARIETTA sT., N.W.. S
't 3100
/
ATLANTA. GEORotA : 03
... /
JH10 E '
Carolina Power and Light Company
ATTN:
J. A. Jones, Senior Executive
Vice President and Chief
Operating Officer
411 Fayetteville Street
i
Raleigh, NC 27602
Gentlemen:
Subject: Report Nos. 50-324/81-09 and 50-325/81-09
This refers to the routine inspection conducted by Mr. A. L. Cunningham of this
office on April 21-2A, 1981, of activities authorized by NRC Operating License
Nos. DPR-71 and DPR-62 for thc Bruns ,1ck facility. Our preliminary findings were
-
discussed with Mr. C. Dietz, Plant Manager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
i
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
,
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
These items and references to pertinent
requirements are 1isted in the Natice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are edineatec in
Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed inspection (or investigation) report will be placed in
the NRC's Public Document Room. If this report contains any information that you
(or your contractors) believe to be exempt from disclosure under 10 CF1
9.5(a)(4), it is necessary that you (a) notify this office by telenhone within
ten (10) days from the date of this letter of your intention to file a request
for withholding; and (b) submit within 25 days from the date of this letter a
written application to this office to withhold such information. If your receipt
-
of this letter has been delayed such rhat less then seven (7) days are available
for your review, please notify this office promptly so that a new due date may be
established. Consistent with section 2.790(b)(1), any such application must, be
accompanied by an affadavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains a full
statement of the reasons on the basis which it is claimed that the informatiun
should be withheld from public disclosure.
This section further requires the
statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far
as possible into a separate part of the affadavit.
If we do not hear from you in
this regard within the specified periods noted above, the report will be placed
j
in the Public Document Room.
.
8108040265 810715
PDR ADOCK 05000324
G
--
- -
.
- -
..
_ . - .
, _ - - . . - , - _ . .
-
-.
.
,
-_ -._- --
.
.
Jpj){ j, (; \\$61
Carolina Power and Light Cor.ipany
2
.
.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
JE?.(7,
R. C.
ewis, Acting Director
Division of Resiaent and
Reactor Project Ir.spection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-324/81-09
and 50-325/81-09
.
cc w/ encl:
C. R. Dietz, Plant Manager
,