Detroit Ecison SEEi!!a=

June 15, 1981 EF2 - 53,674 Mr. L. L. Kintner Division of Project Management Office of Nuclear Reactor Regulation U. S. Nuclear Regulatcry Commission Washington, D. C. 20555

Dear Mr. Kintner:

Reference:

Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341

Subject:

Supplemental Responses to Licensee Qualification Audit The following information and positions are in response to verbal questions from Mr. Erik Pederson, LQB.

Item 1 The five member Fire Brigade is composed of a Nuclear Supervising Operator, two Auxiliary Operators, an Instrument and Control' Technician / Repairman, and a Chemical Technician. The two Auxiliary Operators on the Fire Brigade are in addition to two others who will be available for meeting the minimum shift complement.

Item 2 Detroit Edison will provide at least one additional person per operating shift with at least three months of BWR operating experience starting at fuel loading and extending for at least nine months. This person will be provided by a suitable contractor such as General Electric.

Item 3 The Safety and Performance Engine n dr64 ', will be functional four months prior to . 1 d. .-

}$00/

.l

\) 3 lg G \cS\a

_2 --

(._;Ob $g1 h,e* l}l p $r4 "M 818617o 32 5

Mr. L. L. Kintner June 15, 1981 EF2 - 53,674 Page 2 Item 4 The selection of the corporate technical staff will provide the nucleus of persons to assure the qualifica-tions requirements as listed in the following table.

In addition, Detroit Edison commits to meet the qualifi-cations under Item I.C.(4) and (5) on page 17 of NUREG 0731 for the key technical support staff not covered by the qualifications of the supervisors that will support the plant staff. These technical support personnel may be located in Nuclear Engineering, Genera-tion Engineering, the Engineering Research Department or other Company departments.

Position Minimum Qualifications Director Nuclear Engineering An appropriate Bachelor Degree and six years of experience in Power Plant operations and/or design or related professional experience.

General Supervisor Nuclear Safety An appropriate Bachelor

& Plant Engineering Oegree and six years of experience in Power Plant operation and/or design or related professional experience.

General Supervisor An appropriate Bachelor Nuclear Technology Degree and six years of experience in Power Plant operations and/or design or

~ related professional experience.

General Supervisor Nuclear Fuel An appropriate Bachelor Degree and six years of experience in Power Plant operation and/or design or related professional experience.

Supervisor Engineering Assurance An appropriate Bachelor Degree and six years of experience in Power Plant operations and/or design or related professional experience.

g .-e n , , + ,--,,-,--n-y, -, --, ~ -n -n-n,,, -

p.,.,, - .--w .----n -

Mr. L. L. Kintner June 15, 1981 EF2 - 53,674 Page 3 Supervisor New Issues An appropriate Bachelor Degree and six years of experience in Power Plant operation and/or design or related professional experience.

Supervisor Safety and Performance An appropriate Bachelor l Degree and six years of experience in Power Plant operations and/or design or I related professional experience.

Supervisor Licensing An appropriate Bachelor Degree and six years of

-experience in Power Plant operation and/or design or related professional experience.

1 Supervisor Nuclear Fuel An appropriate Bachelor Degree and six years of experience in Power Plant operations and/or design or

. related professional experience.

Supervisor Fuel Engineering An appropriate Bachelor p.egree and six years of experience in, Power Plant operation and/or design or related professional experience.

Supervisor Reactor Engineering An appropriate Bachelor '

Degree and six years of experience in Power Plant operations and/or design or related professional experience.

Group Leader Materials & Methods Bachelor D'egree in Engineering l ,

or related Sciences or the equivalent and three years professional experience in this field.

Group Leader Radiological Bachelor Degree in Engineering or related Sciences or the equivalent and three years professional experience in this field.

Item 5 As requested, the following list identifies current Nuclear Operations personnel with BWR plant experience during the operational phase.

~

Mr. L. L. Kintner June 15, 1981 EF2 - 53,674 Page 4

1. Hari Arora 1961-1966 Design and Construction experience at Tarapur Nuclear Plant, India 1967-1972 Testing and Startup experience Tarapur Nuclear Plant, India 1972 - 1981 NUS and Detroit Edison Design, Testing and Startup experience at Fermi 2 Power Plant.
2. R. S. Miller 1971-1976 Power Plant operator Hatch Nuclear Power Plant 1977-1978 Shift Supervisor Licensed S.R.C., Hatch Nuclear Power Plant 1978-1981 Training Supervisor Enrico Fermi 2 Power Plant
3. W. E. Miller 1974-1979 General Electric Field Engineer -

Refueling, Maintenance and Construction support at various BWR Nuclear Power Plants i.e.: Monticello, Dresden, Pilgrim and Millstone.

1979-1981 Quality Assurance Supervisor at Enrico Fermi 2 Power Plant

4. Michael Shields ..

1973-1978 Engineer at Brunswick Steam and Electric --

Carolina Power and Light.

Startup and Pre-operational Testing Shift Test Engineer Shift Nuclear Engineer responsible for core monitoring 1978-1981 Assistant Reactor Engineer Enrico Fermi 2 Power Plant Responsible for preparation of Reactor Engineering procedure Startup and testing responsibilities

4. Blair Wickman 1974-1978 Engineer in General Electric Installation and Service Engineering Division. Installation, Startup and Maintenance responsibilities at Dresden Millstone and Browns Ferry Nuclear Power Plants 1978-1981 Senior Engineer in Maintenance Division i at Enrico Fermi 2 Power Plant.

l-s Mr. L. L. Kintner June 15, 1981 EF2 - 53,674 Page 5

6. James Rontondo 1974-1976 Universal Testing Lab Q.C. Inspector during outages at BWR Nuclear Power Plants i.e.: Oyster Creek and Fitzpatrick 1976-1981 Daniel International Q.C. Inspector at Enrico Fermi 2 Power Plant March 1981 - June 1981 Detroit Edison O.C.

Inspector at Enrico Fermi 2 Power Plant.

In addition, a large number of management and operating staff personnel have had extensive observation time at operating BWRs as part of their training.

Item 6 Regarding the licensed operator training, we are committed to 20 licensed operators to man a five (5) shift schedule on the fuel load date. In order to accomplish this, 33 people are in the training process currently.

Eight (8) additional candidates are being aggressively recruited to begin training by September 1 of this year. A block of Simulator time has been booked commencing the week of October 12 to accommodate this group. All candidates in this group are to be ex-Navy to obviate the need for Academic Refresher and Basic Nuclear theory coursework.

In addition to the above 41 candidates, we have ten (10) plant,startup and/or staff graduate engineers in the license preparation process to provide " insurance" in the event that a minimum of 20 candidates do not successfully license. Five (5) of these have already completed the General Physics certification program. The remainder are well along in it.

For the period following fuel load and low power testing to insure that the pipeline is sufficiently full to maintain our commitment of 20 we expect to -

l

1. Provide remedial training for those candidates who do not successfully license on the first attempt. We believe we can assurc inat we will be successful in seven (7) cases of to- (30) of this kind.

s Mr. L. L. Kintner June 15, 1981 EF2 - 53,674 Page 6

2. Begin a new group of eight (8) license candidates in early January of 1982. This group will consist of either ex-Navy people or people selected from our Nuclear Power Plant Operator group. The training program for this latter group is being planned in such a way that training they receive includes elements which prepare them for licensure.
3. Ultimately, it is our plan to provide a systematic career path from Nuclear Assistant Power Plant Operator to Nuclear Power Plant Operator to Nuclear Supervising Operator (RO) and thence, (for some who can qualify)

Nuclear Assistant Shift Supervisor (SRO) to Nuclear Shift Supervisor (SRO).

Sincerely, 7/r**

W. F. Colbert Technical Director Fermi 2 Project WFC/AEW:jl cc: Mr. B. Little