Spec of Contentions 9,10 & 13 in Response to ASLB 800623 Memorandum & Order.Alleges Failure of Eccs,Auxiliary Feedwater Sys & Supporting Electric Power Sys to Comply W/ Reg Guide 1.47
ML19344D861
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 08/20/1980
From: Weiss E
SHELDON, HARMON & WEISS, UNION OF CONCERNED SCIENTISTS
To:
Atomic Safety and Licensing Board Panel
References
ISSUANCES-SP, NUDOCS 8008260169
Download: ML19344D861 (5)


Text

~

...,v' -s,

- *s *

.~a 44 *

-i "gn4 " *C;Q p UNITED STATES OF AMERICA ' ~

NUCLEAR REGULATORY COMMISSION ]9 C'tc?

I20 Sita W 8 /

i t;;,ew; 990 BEFORE THE ATOMIC SAFETY AND LICENSING BOARD \?f . . gM & 2

)

In the Matter of )

)

FETROPOLITAN EDISON COMPANY, et al., ) Docket No. 50-289

) (Restart)

(Three Mile Island Nuclear Station, )

Unit No. 1) )

)

UNION OF CONCERNED SCIENTISTS SPECIFICATION OF CONTENTIONS UCS has been directed by the Board to provide specification of its contentions 9, 10 and 13. Memorandum and Order Requiring further Specification of Contentions, June 23, 1980.1/

UCS Contention 9 is as follows:

9. The accident at TMI-2 was substantially aggravated by the fact that the plant was operated with a safety sys tem inoperable, to wit: two auxiliary feedwater system valves were closed which should have been open. The principal reason why this condition existed was that TMI does not

! have an adequate system to inform the operator that a safety sys tem has been deliberately dis-ab led. To adequately protect the health and safety of the public, a sys tem meeting tne Regula-f l

i i 1,/ UCS's oral motion for an extension of time to specify contentions until Augus t 11, 1980, agreed to by the staff anc licensee, was granted by the Board orally on August 4, 1980. gg3 5

c//

8 008s60 l Ghi

tory Position of Reg. Guide 1.47 or providing equiva-lent protection is required.

UCS specifies that its evidence on this contention will be, directed toward the emergency core cooling system, the auxiliary

~

feedwater system and their essential supporting systems such as electric power and service water.

We wish the Board to be aware, however, that in UCS's pro-posed findings of f act we will argue that failure of these specific systems to comply with or provide equivalent protec tion to Regulatory Guide 1.47 indicates a need to backfit the position of the Regulatory Guide to all systems to which it applies by its terms:

This guide describes an acceptable method of complying with the requirements of IEEE Std. 279-1971 and Appendix B to 10 CFR Part 50 with regard to indicating the unoperable status of a portion of the protection system (as defined in IEEE Std. 279-1971), systems actuated or controlled by the protection system, and auxiliary or supporting systems that must be operable for the protection system and the systems it actuates to per-form their safety-related functions.

Regulatory Guide 1.47, Introduction, May 1973.

UCS Contention 10 is as follows:

The design of the safety system at TMI is such that the operator can prevent the completion of a safety function which is initiated automatically; to wit: the operator can (and did) shut off the emergency core cooling system prematurely. This violates 54.16 of IEEE 279 as incorporatec in 10

CFR 50.55 ( a)( h) which states:

The protection system shall be so designed that, once initiated, a protection system action shall go to completion.

The design must be modified so that no operator action can prevent the completion of a safety function once initiated.

UCS specifies that its evidence on this contention will be directed toward the emergency core cooling system, auxiliary 1

feedwater system and containment isolation system.

Again, we will take the position in our proposed findings that the fact that these specific systems are not designed so as to preclude premature operator over-ride indicates a broader need to review and backfit all safety systems to which 54.16 of IEEE Std. 279, incorporated in 10 CFR 50.55 (a)(h), applies.

UCS's Contention 13 is as follows:

The design of TMI does not provide protection against so-called " Class 9" accidents. There is no basis for concluding that such accidents are l

not credible. Indeed, the staff has conceded that i the accident at Unit 2 falls witnin that classifica-tion. Therefore, there is not reasonable assurance f that TMI-l can be operated without endangering the l

health and safety of the public.

l As the Board is aware, UCS believes that it is entitled to l judgment as a matter of law on this contention and has flied a i

O

,4_

Motion for Summary Judgment to that effect. We firmly believe that the contention is litigable as written. If the Board rules against UCS on the summary judgment motion, we intend to pursue the issue at the hearings. If the Board will not permit the contention to be litigated, UCS will make an offer of proof and pursue its appeal rights. however, if the latter occurs, UCS would move the Board to allow it to litigate tne following contention:

On June 2, 1980, the NRC staf f filed a document entitled "TMI-l Potential Core Damage Accident Sequences and Preventive and Mitigative Measures." Each of the sequences centained therein is credible and the measures proposed are insufficient to prevent or mitigate severe core damage or core melt. In addition, the staff's failure to include loss of AC electric power in' the event tress is not justified, particularly since some actions mandated by the staff may compromise the reli-ability of emergency power and since the staff admits that the emergency feedwater system for TMI-l may have dependencies on AC power which coulu lead to loss of system function in the event of loss of AC power.

Therefore, such events are both credible anc relatec l to the TMI-2 accident. Until'all credible TMI-related sequences leading to core damage or melt are identified (incl uding those involving loss of AC electric power) and until measures to prevent or mitigate such sequences

. = __-. - -. . . . .

are implemented, TMI-l cannot resume operation without posing an undue risk to public health and' safety.

Respectfully submitted,

-- \. I f, (C -t -

Ellyn R. Weiss HARMON & WEISS 1725 I Street, N.E.

Suite 506 Washington, D.C. 20006 (202) 833-9070 Counsel for the Union

, of Concerned Scientists 1

DATED: August 20, 1980 4

1

}

i i

i