Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With NOC-AE-000385, Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with NOC-AE-000357, Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With NOC-AE-000329, Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with NOC-AE-000296, Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With NOC-AE-000256, Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 2 NOC-AE-000233, Monthly Operating Repts for June 1998 for Stp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Stp,Units 1 & 2 NOC-AE-000202, Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 2 NOC-AE-000172, Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 2 ML20216G4911998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for South Texas Project,Units 1 & 2 NOC-AE-000108, Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 2 NOC-AE-000090, Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 2 NOC-AE-000061, Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station1997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station NOC-AE-000039, Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 2 ML20199K0571997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for South Texas Project Unit 1 & 2 ML20198J9221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for South Texas Project,Units 1 & 2 ML20216H9651997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20210K5201997-07-31031 July 1997 Monthly Operating Repts for July 1997 for STP ML20141H3041997-06-30030 June 1997 Monthly Operating Repts for June 1997 for South Tx Project, Units 1 & 2 ML20148K5871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20141G2841997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20137X5811997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for South Tx Project Units 1 & 2 ML20137X6011997-02-28028 February 1997 Revised Monthly Operating Rept for Feb 1997 for South Tx Project Unit 2 ML20137B3981997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for STP ML20134M7421997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20133P3191996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20132C1301996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20134M7431996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20129A5961996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for South Texas Project Units 1 & 2 ML20129A6361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for South Texas Project Electric Generating Station ML20129A6541996-07-31031 July 1996 Revised Monthly Operating Rept for July 1996 for South Texas Project Electric Generating Station Unit 1 ML20116M6721996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for South Texas Project Electric Generating Station ML20115H0321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for South Tx Project, Units 1 & 2 ML20112H9921996-05-31031 May 1996 Monthly Operating Repts for May 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20117G0101996-04-30030 April 1996 Monthly Operating Repts for April 1996 for STP ML20100R2861996-02-29029 February 1996 Monthly Operating Repts for South Texas Project Electric Generating Station Units 1 & 2 ST-HL-AE-0053, Monthly Operating Repts for Jan 1996 for STP1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for STP ST-HL-AE-5277, Monthly Operating Repts for Dec 1995 for South Texas Project1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for South Texas Project ST-HL-AE-5256, Monthly Operating Repts for Nov 1995 for STP Units 1 & 21995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for STP Units 1 & 2 ST-HL-AE-5239, Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 21995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 2 ST-HL-AE-5215, Monthly Operating Repts for Sept 1995 for South Tx Project1995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for South Tx Project ST-HL-AE-5178, Monthly Operating Repts for Aug 1995 for STP Electric Generating Station1995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for STP Electric Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20216G2011999-01-31031 January 1999 City Public Svc of San Antonio Annual Rept 1998-1999 ML20199G5961999-01-31031 January 1999 Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20216G2171998-12-31031 December 1998 Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With ML20216G1521998-12-31031 December 1998 Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 1999-09-09
[Table view] |
Text
'<
P.
l *;> 4?e'
- i. l The ht
- y. P.O. Ilox 1700
..-.. 11ouston
.--- _, Texas 77001 (713) 228 9211 Houston Lighting ae Power ..~... . --,~ -. - -. , . . . - . . . ~ . ~ . ~ . . . - - - , . . t October 13, 1989.
ST-HL AE-3257 File No.: G02 10CFR50.71 i U. S. Nuclear Regulatory Commission l Document Control Desk Attention:
Vashington. DC 20555 South Texas Project Electric Generating Station Units 1 & 2 Docket Nos. STN 50 498 & 50 499 Monthly Operatinc Recorts for Sectember. 1989
- Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for September, 1989.
If you should have any questions on this matter, please contact ;
Mr. C. A. Ayala at (512) 972-8628.
^
l 1.
Af M. A. McBurnett l Manager l Support Licensing l
l l MAM/BEM/n1 l
l l' Attachments: 1) STPEGS Unit 1 Monthly Operating Report - September, 1989
- 2) STPEGS Unit 2 Monthly Operating Report - September, 1989 l
l l
l.
l L
l 1
[k d b k '
[
i
- l A1/023.NL5 A Subsidiary of Ilouston Industries Incorporated L
l
---,e- - - .,w-u ,- e , -
-.w w-- - , . - , - - - --
7 Y
F
., q' ilouston 1Jghting & l'ower Company ST-llL AE 3257 File No.: CO2
- l. Page 2 cc:
Regional Administrator,. Region IV Rufus S. Scott Nuclear Regulatory Commission Associate Cencral Counsel 611 Ryan Plaza Drive, Suite 1000 llouston Lighting & Power Company Arlington, TX 76011 P. O. Box 1700 Houston, TX 77001 Ceorge Dick, Project Manager U. S. Nuclear Regulatory Commission INPO Washington, DC 20555 Records Center 1100 circle 75 Parkway Jack E. Bess Atlanta, CA 30339-3064 Senior Resident Inspector - Unit 1 c/o U. S. Nuclear Regulatory Commission Dr. Joseph M. llendrie P. O. Box 910 50 Be11 port Lane ;
Bay City, TX 77414 Be11 port, NY 11713 J. I. Tapia D. R. Lacker Senior Resident Inspector - Unit 2 Bureau of Radiation Control l
c/o U. S. Nuclear Regulatory Commission Texas Department of Health P. O. Box 910 1100 West 89th Street Bay City, TX 77414 Austin, TX 78756-3189 J. R. Newman, Esquire Newman & lloltzinger, P. C. <
1615 L Street, N. W. '
3 Washington DC 20036 '
R. L. Range /R. P. Verret Central Power & Light Company a P. O. Box 2121 I Corpus Christi, TX 78403 R. John Minor (2 Copies)
Chief Operating Officer City of Austin Electric Utility q 721 Barton Springs Road ;
Austin, TX 78704 R. J. Costello/M. T. Hardt ,
City Public Service Board ,
P. O. Box 1771 '
San Antonio, TX 78296 1
1
)
l J
Revised 06/16/89 A1/NL.DISR4 5
1
i;' .
+
.o, . .
I' ATTACHMENT I ST HL A6 J2 5-7 ,
2AOLL OFJ
^
?
t
[
- f. .
[
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 i MONTHLY OPERATING REPORT SEPTEMBER 1989 HOUSTON LIGHTING AND POWER CO.
i' NRC DOCKET NO. 50-498
. LICENSE NO. NPF-76 i
- ( ,
Reviewed I : . Iod /M ;
General Supervisor Date Reviewed By: 8N 7 dnt Engineeri,ng M ager 'Date Approved By: h \, m 10- 9 6 ,
Plant Manager Q Date ,
f 1
i
'1,-
1-s r.' '
ATTACHMENT 1 Monthiv Summarv - ST HL.AE. 31.J2 PAGE 2.OF 6 ,
c.<,, The; unit remained shutdown for refueli.ng and' scheduled maintenance,' ..
1 l
l
?
,<w
~-,
F I'
i:
e ATTACHMENT /
OPERATING DATA REPORT ST.HL.AE 74 57 PAGE 3 OF 6 DOCKET NO. 50-498 g
UNIT 1
' DATE Oct. 4. 1989 i COMPLETED BY A.P. Kent TELEPil0NE 512/972-7786 OPERATING STATUS
\
- 1. REPORTING PERIOD: 09/01-09/30 GROSS HOURS IN REPORTING PERIOD: 720
- 2. CURRENTLY AUTi!0RIZED POWER LEVEL (MWt): 3800 f MAX. DEPEND. CAPACITY (NWe Net): 1250.6_
DESIGN ELECTRICAL RATING (MWe Net): 1250.6
- 3. POWER LEVEL TO WilICil RESTRICTED (IF ANY)(MWe Net): None
- 4. REASONS FOR RESTRICTION (IF ANY): N/A TllIS MONTil YR TO DATE CUMULATIVE
- 5. NUMBER OF ll0URS REACTOR WAS CRITICAL..... 0 4094.3 6591.1
- 6. REACTOR RESERVE SilUTDOWN HOURS........... 0 0 0
- 7. 110URS GENERATOR ON LINE. . . . . . . . . . . . . . . . . . 0 4021.5 6427.5
- 8. UNIT RES ERVE SilUTDOWN 110URS . . . . . . . . . . . . . . 0 0 0 (
- 9. GROSS TilERMAL ENERGY GENERATED (NWt) . . . . . 0 14590406 23404928
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH). . 0 4963740 7955970
- 11. NET ELECTRICAL ENERGY GENERATED (MW11) . . . . -5453 4670937 7462429
- 12. REACTOR SERVICE FACTOR................... 0% 62.5% 68.3%
- 13. REACTOR AVAILABILITY FACTOR. . . . . . . . . . . . . . 0% 62.5% 68.3%
- 14. UNIT SERVICE FACT 0R...................... 0% 61.4% 66.6%
- 15. UNIT AVAILABILITY FACTOR................. 0% 61.4% 66.6%
- 16. UNIT CAPACITY FACTOR (Using MDC)......... -0.6% 57.0% 61.9%
- 17. UNIT CAPACITY FACTOR (Using Design MWe).. -0.6% 57.0% 61.9%
- 18. UNIT FORCED OUTAGE RATE., .... .. .. ... 0% 5.29 7.6%
l 19. SHUTDOWNS SCllEDULED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACll): i None l 20. IF SlIUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10.4Uf88.2 4
l l
y f ' .g . ., , ,
r
[' l ATTACHMENT 1 l,ST HL.A,f 3 252 PAGE 7 0F 4 AVERAGE DAILY UNIT POWER LEVEL i:
DOCKET NO. 50 498 i UNIT 1
< DATE Oct. 4. 1989 COMPLETED BY 6a P. Kent
, TELEPHONE ~512/972-7786 l
MONTH SEPTE@,EjL r
DAY- AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net) l' O 17 0 2 0 18 0
, 3 0 19 0 4 0 20 0 5 0 21 0 L
6 0 22 0 7 0 23 0 8 0 24 0 ,
9 0 25 0 10 ,,,,,_
0 26 0 11 0 27 0 i
12 0 28 0 t 13 0 29 0 {
1 14 0 30 0 :
15 0 31 N/A 16 0 l
i.
1 l
l
UNIT SHUTDOWNS AND POWER REDUCTIONS . ...
DOCKET NO. 50-498 e UNIT 1-DATE Oct. 4. 1989 COMPLETED BY.'A.P. Kent TELEPHONE 512/972-7786 REPORT MONTH SEPTEMBER No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to (Hours) Shutting Event Code Code Prevent Recurrence Down Report #
Reactor 89-10 890805 S 720.0 C 4 N/A N/A N/A Manual shutdown for refueling and scheduled maintenance.
2 S F: Forced Reason: Method: IEEE 805-1983 IEEE 803A-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction EATTACHMENT l G-Operational Error (Explain) 9-Other . ST.HL-AE- 72 T#
11-Other (Explain)
{PAGE3'OF&
. - - _ . . _ _ - _ _, . - - - . , . _ . ~ _ _ . _ _ . , _ _ _ - . - - ~ . _ , - .
- , 7 p , ,, ,
r* e
?
ATTACHMENT /
lj ,
- ST HL AE, J2 5 2 PORVs and Safety Valves Si===ry i
,.PAGE l..0F 4 7
1 ;
y
! t l No PORVs or Srfety Valves were challenged during this reporting period, r-I 9
i P
i 6
t l P l
l i
l l-1 i..
1 1'
l l
l l
(
r h ** ,,
~
!~ ATTACHMENT 2.
. ST HL AE. J2 D :
PAGE l 0F 2 f.
I.
3 t
I s..
! SOUTH TEKAS PROJECT l ELECTRIC GENERATING STATION IJ UNIT 2 MONTHLY OPERATING REPORT ,
i' SEPTEMBER 1989 HOUSTON LIGHTING AND POWER CO.
NRC DOCKET No. 50-499 -
LICENSE NO. NFF-80 t
e Reviewed B - i'b M General Supo visor Date Reviewed By: IO!I f P 6 f EKgir%ering Manager b/te ' 7 Approved By: M_ d. wAn s luk @
Plant Manager Dhth '
4,.. .s .,. ;
ATTACHMENT 2
{:- '
. ST.HL..hE.' 3 L52 ,
Month 1y Summarv _.f4GE,A 0F 7 .!
I' Unit.2 began the reporting period at 100%- reactor power. - ;
i- On 9/05/89 at 1607 hours0.0186 days <br />0.446 hours <br />0.00266 weeks <br />6.114635e-4 months <br /> a reactor / turbine trip - occurred when a Steam Generator Feedwater Pump (SGFP) tripped on overspeed. The unit was removed from i service for 17.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. ;
A reactor / turbine trip occurred on 9/19/89 at 1237 from a decrease in Over- .
!. Temperature Delta Temperature (OTDT) setpoints caused by an OTDT turbine runback. -l The generator was placed back on line on 9/20/89 at 0524.- t I' -
On 9/22/89 at 0202 a reactor trip occurred as a result'of a turbine trip l above 50% reactor power. The unit was removed from service for 147.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. ,
L The unit concluded the reporting period at 1006 reactor power. ,
i I
1 t
l l
l l
y - -
3 n
9 . 1 t- '*- , *" ATTACFDAENT 1 L , ST.HL.AE. 3 25)
PAGE 3 0F / ..I
. OPERATING DATA REPORT g.
DOCKET NO. 50-49'9 I UNIT 2 >
DATE grl 4,_1989 I COMPLETED BY A.P. Kent TELEPHONE . 512/972-7786 OPERATING STATUS ,
j- 1. REPORTING PERIOD: 09/01-09/30 GROSS HOURS IN REPORTING PERIOD: 720 F 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800
[ MAX. DEPEND. CAPACITY (MWe Net): 2250.6 DESIGN, ELECTRICAL RATING (MWe Net): 1250.6 j 3.- POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe Net): None
'4. REASONS FOR RESTRICTION (IF ANY): N/A 1
e' THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL..... 580.7 2205.5 7705.5
- 6. REACTOR RESERVE SHUTDOWN HOURS........... 0 0 0 1
- 7. HOURS GENERATOR ON LINE.................. 538.1 2082.2 2082.2 4
(
- 8. UNIT RESERVE SHUTDOWN. HOURS..............__ .2 0 0 i
- 9. ' GROSS THERMAL ENERGY GENERATED (MWt).... 1886300 6678681 6679681 i
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH).. 634600 2250730 2250730
- 11. NET ELECTRICAL ENERGY GENERATED (MWH).... 591713 2114656 2114656 l
- 12. REACTOR SERVICE FACTOR................... 80.7% 88.4% 88.4% ?
'13. REACTOR AVAILABILITY FACTOR.............. 80.7% 88.4% 88.4%
- 14. UNIT SERVICE FACTOR......... ............ 74.7% 83.4% 83.4%
- 15. UNIT AVAILABILITY FACTOR................. 74.7% 83.4% 83.4%
- 16. UNIT CAPACITY FACTOR (Using MDC). . ..... 65.7% 67.7% 67.7% ,
l'
- 17. UNIT CAPACITY FACTOR (Using Design MWe).. 65.7% 67.7% 67 11
- 18. UNIT FORCED OUTAGE RATE........ ........ 25.3% 14.7% 14.7%
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Scheduled 44 day outage to begin November 4, 1989 for Bottom Mounted Instrumentation Inspection and Turbine Inspections.
- 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A ,
I l
l i
l i
e.
s ATTACHMENT 2
. ST HL AE 3 2 5 */
AVERAGE DAILY UNIT POWER LEVEL -F' AGE 4 0F 7 DOCKET NO. 50 499 UNIT 2
< DATE Oct. 4. 1989 COMPLETED BY A.P. Ment TELEP110NE 512/972 7786 MONTil Scotember i DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MVe Net) (MWe Net) 1 1232 17 1243 ,
2 1743 18 1243 3 1243 19 628 4 1241 20 321 5 814 21 672 6 225 22 44 7 _ , . 619 23 0 i
8 1212 24 0 9 1240 25 0 10 1247 ,_ 26 0 _
11 1241 27 0 1241 28 555 12 f 13 1237 29 1247 14 1241 30 1228 15 1244 31 N/A ;
16 1244
.- .-- ~, - - --
- -- , - - -. - - - - --w.--. - - _ --
~
. 6 UNIT SHUTDOURS AND PotER REDUCTIONS 3 DOCKET NO. 499 i UNIT 2 DATE Oct. 4. 1989 COMPLETED BT A.P. r.nt-TELEPHONE 512/972-7786 REPORT MONTH Sentember 1 2 3 4 5 No. lDate Type Duration Reason Method of Licensee System Component Cause & Corrective Action to (Heurs) Shutting Event Code Code Prevent Recurrence Down Report # ,
Reactor 89-06 890905 F 17.3 A 3 2-89-021 JK SG Reactor / Turbine trip occurred when a Steat. Generator Feedwater Pump (SCFP) tripped on overspeed. The cause of this event was a defective SCFP speed control-1er card edge connector which .s dis-turbed during troubleshooting of a circuit card for a different SCFP in the same card frame. The defective card edge connector was repaired, the card frame aligrwient checked, and remaining circuit cards and edge connectors were inspected and contact surfaces cleaned.
89-07 890919 F 16.8 H 3 2-89-022 TA TRB Reactor / Turbine trip occurred free a decrease in OIDT setpoints caused by an OTDT turbine runback. The OTDT turbine runback circuit was discovered to be set for a runback of 15 seconds rather than 1.5 seconds. Short-term actions were to remove the OTDT and OTDT runback functions F: Forced Reason: Method: IEEE 805-1983 IEEE 803A-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain) ATTIC W m T ST R. G I M y p/ y SCF 7 -1
- y. ys iMg.-g-s.%w+ w--y^-y-e,,.wwwew.vy-7 www-s.-e--p.p- yy y weyw-rq* yr T=yy- V wryw g wgr9'" -w-- Twe-T-pwwa~-weyg -
,ir qyw gyw-y 9 _ey_ g -
.~
UNIT SNUTDOUNS AND POWER REDUCTIOttS .
e DOCKET NO. 50-499 L3IT 2 DATE Oct. 4_ 1989 COMPLETED BY A.P. Kent TELEPHONE 512/972-7786 REPORT MO5'HI D tember No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to (llours) Shutting Event Code Code Prevent Recurrence Down Report e Reactor i per a temporary modification prior to putting the turbine on line. Iong-term actions are under investigation.
89-08 890922 F 147.8 A 3 2-89-023 TA CAP Reactor trip occurred when the turbine tripped above 50% reactor power. The turbine tripped when a capacitor failed on the DC supply to an inverter that feeds the automatic bus transfer device. The device transferred to emergency service which caused a momentary loss of power to the turbine auto stop test circuits resulting in a turbine trip. The capacitor was replaced.
F: Forced Reason: Method: IEEE 805-1983 IEEE 803A-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scrare C-Refueling 3-Automatic Scram D-Re5ulatory Restriction 4-Cont. of Existing E-Operator Training 6 License Exam Outage F-Administrative 5-Reduction ATTACHMENT 2 G-Operational Error (Explain) Y-Other , $T.HL-4E- f 2 77 fi-Other (Explain) PAGE 6 OF f
ATTACHMENT 2-LT HL AE 32>~2 PORVs and Safety Valves Summary .
_ ige _7 Of 7 No PORVs or Safety Valves were challenged during this reporting period,