Forwards IE Info Notice 79-28, Overloading of Structural Elements Due to Pipe Support Loads. No Response Required
ML19260B505
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/16/1979
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Goodwin C
PORTLAND GENERAL ELECTRIC CO.
References
TAC-12369, NUDOCS 7912100278
Download: ML19260B505 (1)


Text

f [%.,7

'o, UNITED STATES E

' 'g NUCLEAR REGULATORY COMMISSION

,h REGION V

J ' %,,,.. [c 0, dd34 1990 N. CALIFORNIA BOULEVARD

%, *,'O,8 SulTE 202, WALNUT CRE EK PLAZA

,,a WALNUT CRE E K, CALIFORNIA 94596 November 16, 1979 Docket tio. 50-344 Portland General Electric Company 121 S. W. Salmon Street Portland, Oregon 97204 Attention: Mr. Charles Goedwin, Jr.

Assistant Vice President Gentlemen:

The enclosed IE Information flotice No. 79-28 provides information on the overloading of structural elements due to pipe support loads.

Sincerely,

/

R. H. Engelken

()4 Director

Enclosures:

1.

IE Information flotice, flo. 79-28 2.

Recently Issued IE Informction flotices cc w/ enc:

C. P. Yundt., PGE F. C. Gaidos, PGE 1521 310 voin oo N,

SSINS NO: 6870 g

Accession Mc.: 79102594I5 UNITED STATES NUCLEAR REGU'_ATORY CC?' MISSION OFFICE OF INSPECTION AND ENFORCEf9ENT WASHINGT0tl, D.C.

20555 flovember IS,1979 IE Information Notice No. 79-28 OVERLOADING OF STRUCTURAL ELE"ENTS DUE TO PIPE SUPPORT LOADS Descriotion of Circumstances:

Recently, the NPC was infomed that, in the course of the inspections pursuant to IE Bulletin No. 79-02 and 79-14 by the Portland General Flectric Co. (PGE) at the Trojan Nuclear Plant, some walls were found which did not have adecuate structural strength to sustain the required succort reactions.

Eechtel Corocration was the Architect Enaineer for the plant. These structural inadequacies were recorted to be attributable to two deficiencies:

1) Apparent lack of a final check of certain nice support locations and reactions to ensure that the suoportino structural elenents possessed adequate structural integrity to sustain the recuired loads.

2)

Inadenuate design criteria for the reactions from succorts anchored into the face of concrete block walls; e.g., relying on the corbined strenath of double concrete block walls without easitive connection between the two walls by means other than the bond provided by a layer of arout between them.

The NRC is currently pursuing these issues in detail for the Trojan Nuclear Plant to detemine the extent of these deficiencies and the generic implications for other Bechtel facilities.

This Information Notice is provided as an early notification of a oossible signif-icant matter.

It is expected that recipients will review the infomation for oossible acplicability to their facilities and the actions being perforced under IE Bulletin No. 79-02. Specific action is beinq requested relating to the adecuacy of attachnents to concrete block walls under IE Bulletin No. 79-02, Revision 2, item 5.c.

No soecific actions are reauested in resconse to this Information Notice.

If NRC evaluations so indicate, further licensee actions may be reauested or recuired.

If you have any questions regarding this matter, please cortact the Director of the acoropriate NRC Regional Office.

No written resconse to this IE Infomation ?!atice is required.

1521 311

IE Information Notice No. 79-28 Enclosure November 16, 1979 QECENTLY ISSUED IE INF0F?!ATION NOTICES Information Subject Date Issued To Notice No.

Issued 79-27 Steam Generator Tube 11/16/79 All power reactor facilities Ruotures At Two PWR holding OLs and cps Facilities79-12A Atteroted Damaqe To !!ew 11/9/79 All Fuel Facilities, Fuel Asserblies research reactors, and oower reactors with an CL or CP 79-26 Breach of Containment 11/5/79 All cower reactor facilities Integrity holding OLs and CDs 79-25 Deactor Trips At Turkey 10/1/79 All newer facilities with Point Units And 4 an OL or a CP 79-24 Overaressurization Of 10/1/79 All power reactor facilities Containment Of A PWo Plant with a CD After A Main Steam Line Break 79-23 Emergency Diesel Generator 9/26/79 All ccwer reactor Lube Oil Coolers facilities holding OLs and cps 79-22 Qualification of Control 9/12/79 All cower reactor Systems facilities with operating licenses and construction cermits.

79-21 Transcortation and Cormercial 9/7/79 All oower and research Burial of Radioactive Material reactors with CL's 79-20 NRC Enforcement Dolicy 9/7/79 All Polders of Peactor (Rev. 1)

NRC Licensed Individuals CLs and cps and Prcduction Licensees with Licensed Onerators 79-20 Not Enforcenent Policy 8/14/79 All Polders of Reactor NRC Licensed Individuals CLs and cps and Production Licensees with Licensed Onera tors I521 3i2