ML19246A919

From kanterella
Jump to navigation Jump to search
LER 79-057/03L-0 on 790606:during Engineered Safeguards Time Response Test,Emergency Diesel Generators a & B Tripped. Caused by Imbalance in Reactive Load on Diesel Generator. Test Has Been Revised to Control Imbalance of Reactive Load
ML19246A919
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/27/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19246A917 List:
References
LER-79-057-03L, LER-79-57-3L, NUDOCS 7907090234
Download: ML19246A919 (2)


Text