Responds to IE Bulletin 79-14.Util Is Conducting Seismic Analyses,Per NRC 790313 Show Cause Order,Which Meet Requirements of Bulletin. A/E Revising Documents to Reflect as-built Piping Conditions in Plant
ML19242B194
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/09/1979
From: Leonard J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
JAFP-79-352, NUDOCS 7908070650
Download: ML19242B194 (1)


Text

V-c POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITzPATRICK NUCLEAR POWER PLANT JOHN O. LEONARD, JR.

Resident Manager S P.o. BOX 41 Lycoming, Nm York 13093 315-342 3840 July 9, 1979 JAFP 79-352 Mr. Boyce H. Grier, Di rector United States Nuclear Regulatory Commission Region i 631 Park Avenue King of Prussia, Pennsylvania 19406

SUBJECT:

ISE Bulletin No. 79-14 Seismic Analyses for As-Built Safetv-Related Piping Systems

Dear Mr. Grier:

The staff at the James A. FitzPatrick Nuclear Power Plant has reviewed subject bulletin.

As you are aware, we are conducting an extensive seismic analyses at the James A. FitzPatrick Nuclear Power Plant as directed by the Show Cause Order issued by the Nuclear Regulatory Commission on March 13, 1979 It is our position that the requirements set forth in ISE Bulletin 79-14 are being met by the seismic analyses program presently established for the FitzPatrick Plant. In addition, we have also requested that the architect engineer revise documents to reflect the as-built condition in the plant which were established by our piping system verification program.

Very truly yours,f ,

f k / [

V '

r. " , w , , , ,0.

JDL:brp / J'0$tY b. LEON R6 JR[ -

CC: G. T. Berry, PASNY, NY0 /'

\ /;

G. A. Wilverding, PASNY, NY0 ( 'l P. W. Lyon, PASNY, NY0 M. C. Cosgrove, PASNY, JAF

\ %- ,

R. J. Pasternak, PASNY, JAF Document Con trol Center _.

!) U I 79 08 07 0 65b