05000321/LER-1978-093-03, /03L-1 on 781109:during Normal Operation,Core Drills Were Made Through Diesel Generator Room Walls.Caused by Drills Made to Allow Conduit Through Walls.Conduit Installed & Holes Grouted on 781112

From kanterella
(Redirected from ML19224D827)
Jump to navigation Jump to search
/03L-1 on 781109:during Normal Operation,Core Drills Were Made Through Diesel Generator Room Walls.Caused by Drills Made to Allow Conduit Through Walls.Conduit Installed & Holes Grouted on 781112
ML19224D827
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/11/1979
From: Nix B, Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19224D822 List:
References
LER-78-093-03L, LER-78-93-3L, NUDOCS 7907170091
Download: ML19224D827 (1)


LER-1978-093, /03L-1 on 781109:during Normal Operation,Core Drills Were Made Through Diesel Generator Room Walls.Caused by Drills Made to Allow Conduit Through Walls.Conduit Installed & Holes Grouted on 781112
Event date:
Report date:
3211978093R03 - NRC Website

text

..,,. -...,..

u.a

~L u m uu t A i v,o cc.w.noa,03 LICENSEE EVENT REPORT Update Report Previous Report Date 11-20-78 ccNTaot accco l I

I 1

I l@

(PLEASE P9 TNT CR TYPE ALL REOUIREO INFORMATION) i e

o i i l I r, l a l e I i l u l l IQ,ininInInIn!nIninininl@.ill 111111l@l l

J u ar :s @

7 4

e uCr.se E :.;E a

a ucE..e wusea

s aCr.se T,,E

.a cco T atil LE'3"j l L i@ 015 'l 10101312 il !@l l 11 10191718 !@[01711 I l 17. 9 l@

d oa 61

O;(sTa..vssa W

c3 EVENTOaTE

~3 AE*CRT OATE sJ eve'4r cEsC31PTICN AND PRCS ABLE CONSEOUENCES Q oi; i While in normal operation, core drills were made throuch the diesel cenerator room iaii walls.

The scecific walls were the wall between the l A diesel generator and

'.G

[ e I switchcear room, the wall between the lA diesel cenerator and IE, itchgear room, the ]

8 l wall between the lE and 1F switchaear rooms, and the wall between the IF and 1G l

EE, switchaear rooms.

There were no orobable conseauences as a fire watch was estab-i lisned cer the recuiraents of Technical Soecification 3.13.6.

Public health and l

[;

0is1 ! safety wsre not affected by this incident.

I s 3 60 P S T E *.1 CALSE CALSE isV8 SALVE COCE COOE SV9COCE COYPCNE'.T COOE SL3C00E SUSCOOE Inj_j l Al Bl@ I Al@ l E j@ lZ IZ lZ !Z IZ IZ @ l Z @ l Zl@

7 e

a u

o i,

20 SEOVENTI AL CCOLAAENCE RE70AT REVISION

,g o a0

  • ENTVSAR AFPORT NO.

CODE TvP*

NO

@NusEG

' E 'c "

l 718l 11 l 01913l lI l013l lLl l_l l1 l 22

.'s v

s 3

a 2,

u ACT' O N 2.;TL a E EprE;T p y T C C.'.N AT ACwvfNT NPAD-4

' AIVE COvp COV8CNENT T AKEi4 ACTlCN CNGLANT VETHOO MOLAS 22 SL 8 MITT E 3 FC Ay 3L 3, gyppLt E A VANUFACTLAEa lXl@!Zl@

lZl@

lZl@

l010l0I l

lN l@

l Y@

lZ j@

l Z l 9 19 l9 !@

~

s o

2 n

v n

n u

CAUSE DESCRIPTION AND CORRECTIVE ACTICNS @

i. i l The core drills were made to allow conduit to be run through the walls. A fire watch t i i, I was established until the walls coulu be repaired. The two holes made in the 1A die-t i,,,

sel generator room walls were grouted and the two holes in the IF switchgear room l were packed with Kao-wool until conduit could be installed thrcugh them.

The conduit l

,i3 l was installed and the holes grouted on 11-12-78.

l 1

.A 3 3 80

' PCV.E A CTwCR 5TA TUS

  1. A c m Tv STATL5 OISCOVEAY prSCOVERv CESCAi8 TION --

lt i i l E l@

0I9I4[@l N/A l

lAl@l Operator Observation l

AC'Tmiry CCdTENT

~

'6 8

AuOuNT Cr ACrisiTv h aEtE2 SED OraetEssE LOC AT'ON C# RELE ASE l ' I G l l Z ! @ l Z l@l N/A l

N/A J

3 3 a

u 4s so 8Ea!ONNEL 4POSLaE5 N L v ? C -4

r P E CE",CA1PT!ON -'

l t'll010lOj@lZl@l N/A I

7 3 3 11

'T 12 30

  1. E a C ON'. E L,NJLm ES NEa O E:;C a iP TI O *.

i 1 0

O ! 0}@

N/A l

r 3 )

)

2 30

^

7907170(3pjJ e

o 1-l l 7 !:Aed N/A 42 mlgwT.@

353 053 lt i. I Il N l' 'I d. /M l

l l ll l ll I Il Il j

Gs 63 50 ;

R. I, Nix, $uDt. of Maint.

9 2~367-7781

.x,E.,pngarngp P*CNE