ML19224D822

From kanterella
Jump to navigation Jump to search
Forwards LER 78-093/03L-1
Date released: 08/26/2019 Download: ML19224D822


LER 78-093/03L-1 on 781109:during Normal Operation,Core Drills Were Made Through Diesel Generator Room Walls.Caused by Drills Made to Allow Conduit Through Walls.Conduit Installed & Holes Grouted on 781112
ML19224D827
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/11/1979
From: Nix B, Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19224D827 (1)
Forwards LER 78-093/03L-1
ML19224D821
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/11/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19224D821 (1)