ML20210B8153 February 1986LERs 85-048,85-049 & 85-051 Have Been Canceled
05000366/LER-1984-001, Revised LER 84-001-01:on 840203,plant Personnel Detected Fracture in 66-inch Vent Header in Bay 5.Caused by Brittle Fracture of Vent Header Matl.Vent Header Will Be Repaired Prior to Startup21 March 1984Revised LER 84-001-01:on 840203,plant Personnel Detected Fracture in 66-inch Vent Header in Bay 5.Caused by Brittle Fracture of Vent Header Matl.Vent Header Will Be Repaired Prior to Startup
05000366/LER-1983-040, Updated LER 83-040/03X-1:on 830709 & 14,control Rod Drive Low Pressure or High Level Alarm Received for HCV 2C11-26-31 & 02-29.Caused by Leaking EP-111 Nitrogen Charging Valves. Valves Replaced & HCVs Returned to Svc12 March 1984Updated LER 83-040/03X-1:on 830709 & 14,control Rod Drive Low Pressure or High Level Alarm Received for HCV 2C11-26-31 & 02-29.Caused by Leaking EP-111 Nitrogen Charging Valves. Valves Replaced & HCVs Returned to SvcTime of Discovery
05000366/LER-1983-055, Updated LER 83-055/03X-1:on 830713 & 21,RCIC Pump 2E51-C002 Would Not Deliver 600 Gpm Required Tech Spec Flow.Caused by Unadjusted Electric Governor Remote Actuator.Actuator Adjusted.W/Amended5 December 1983Updated LER 83-055/03X-1:on 830713 & 21,RCIC Pump 2E51-C002 Would Not Deliver 600 Gpm Required Tech Spec Flow.Caused by Unadjusted Electric Governor Remote Actuator.Actuator Adjusted.W/Amended
05000366/LER-1983-126, Amended LER 83-126/03L-0:on 831113,safety Relief Valve Tailpipe Temp Recorder 2B21-B614 Observed Stamping Erratically.Caused by Component Failure.Advancing Mechanism, Solenoid & Arm & Hub Assembly Replaced5 December 1983Amended LER 83-126/03L-0:on 831113,safety Relief Valve Tailpipe Temp Recorder 2B21-B614 Observed Stamping Erratically.Caused by Component Failure.Advancing Mechanism, Solenoid & Arm & Hub Assembly Replaced
05000366/LER-1983-127, Amended LER 83-127/03L-0:on 831108,while Pumping Water from Drywell Equipment Drain Sump,Pump Discharge Valve 2G11-F018 Would Not Open.Sys Declared Inoperable.Caused by Blown Fuse in Valve Control Circuit5 December 1983Amended LER 83-127/03L-0:on 831108,while Pumping Water from Drywell Equipment Drain Sump,Pump Discharge Valve 2G11-F018 Would Not Open.Sys Declared Inoperable.Caused by Blown Fuse in Valve Control Circuit
05000366/LER-1983-099, Updated LER 83-099/03X-1:on 830925 & 1005,hydrogen Dioxide Analyzer a Declared Inoperable During Procedure HNP-2-3882 & Out of Calibr,Respectively.Caused by Worn Diaphragms in Sample Pump a & Instrument Drift28 October 1983Updated LER 83-099/03X-1:on 830925 & 1005,hydrogen Dioxide Analyzer a Declared Inoperable During Procedure HNP-2-3882 & Out of Calibr,Respectively.Caused by Worn Diaphragms in Sample Pump a & Instrument DriftPost Accident Monitoring
05000366/LER-1982-068, Updated LER 82-068/03X-1:on 820707 & 24,volumetric Weighted Average Drywell Air Temp Exceeded Tech Spec Limit of 135 F. Caused by High Ambient Temp & Failure of Alternate Chiller Fans 8B & 9B.New Chilling Units Installed26 October 1983Updated LER 82-068/03X-1:on 820707 & 24,volumetric Weighted Average Drywell Air Temp Exceeded Tech Spec Limit of 135 F. Caused by High Ambient Temp & Failure of Alternate Chiller Fans 8B & 9B.New Chilling Units Installed
05000366/LER-1980-096, Updated LER 80-096/03X-2:on 800619 & 27,w/reactor Mode Switch in Run,Reactor Bldg to Torus Vacuum Breaker Isolation Valve Failed to Open.Caused by Failure of D-P Switch to Actuate.Switch Replaced23 December 1982Updated LER 80-096/03X-2:on 800619 & 27,w/reactor Mode Switch in Run,Reactor Bldg to Torus Vacuum Breaker Isolation Valve Failed to Open.Caused by Failure of D-P Switch to Actuate.Switch Replaced
05000366/LER-1980-124, Updated LER 80-124/03X-1:on 800813 & 27,during Surveillance of Torus/Drywell Vacuum Breakers,J & I Breakers Failed to Give Proper Light Indication.Caused by Air Control Valves Being Out of Adjustment.Valves Adjusted & Breakers16 December 1982Updated LER 80-124/03X-1:on 800813 & 27,during Surveillance of Torus/Drywell Vacuum Breakers,J & I Breakers Failed to Give Proper Light Indication.Caused by Air Control Valves Being Out of Adjustment.Valves Adjusted & Breakers Tested
05000321/LER-1979-082, Updated LER 79-082/03X-2:on 790825-27,attempt to Perform RCIC Pump Operability Procedure Unsuccessful When Turbine Failed to Trip Upon Manual Signal.Caused by Burned Out Turbine Trip Actuator Coils & Binding Assembly23 November 1982Updated LER 79-082/03X-2:on 790825-27,attempt to Perform RCIC Pump Operability Procedure Unsuccessful When Turbine Failed to Trip Upon Manual Signal.Caused by Burned Out Turbine Trip Actuator Coils & Binding Assembly
05000321/LER-1981-120, Updated LER 81-120/01T-1:on 811105,AE Advised That in Event of Main Steamline Break or Scram Discharge,Isolation of HPCI & Reactor Core Isolation Cooling Sys Could Occur.Caused by Erroneous Analysis.Event Would Not Occur3 August 1982Updated LER 81-120/01T-1:on 811105,AE Advised That in Event of Main Steamline Break or Scram Discharge,Isolation of HPCI & Reactor Core Isolation Cooling Sys Could Occur.Caused by Erroneous Analysis.Event Would Not Occur
ML20147H52720 December 1978/03L-0 on 781207:during Normal Oper & Performance of Procedure HNP-2-3307,HPCI Steam Line Flow Ft&C Switch 2E41-N004 Was at -217 in Water,Due to Instru Drift
ML20147H56720 December 1978/03L-0 on 781210:w/reactor in Run Mode,During Weekly Calibr Check HNP-2-3604,2N62-N009B Was Found Inoper, Due to Bad Hydrogen Sensor
ML20147H51320 December 1978/03L-0 on 781208:during Steady State Oper,During Procedure HNP-2-3410,2E51-N017 Would Trip at -116 of Water for Low Setpoint & 111.9 of Water at High Setpoint,Due to Instru Drift
ML20147H47820 December 1978/03L-0 on 781210:noted That 2B21-N017C Tripped at 37.7 Inches of Water Decreasing.Caused by Instru Drift
ML20062G31718 December 1978/03L-0 on 781130:refueling Floor Vent Exhaust sensor(D11-N012C)gave False High Indication.Caused by Sensor Mounted in Such a Way as to Allow Rain Water to Enter
ML20147H55918 December 1978/03L-0 on 781205:w/reactor in Run Mode During Special Inspec of 3-hour Fire Barriers,A Manila Rope Was Found Thru Fire Seal of Cable Tray 2BHA902 in the RPS M.G. Set Room,Due to Constr Personnel ErrorFire Barrier
Fire Watch
ML20062G29918 December 1978/03L-1 on 780710:shock Suppressor RHRH-229 Found to Be Low on Fluid.Caused by Leaking O Ring Seal
ML20147C27811 December 1978/03L on 781121:failure to Submit RO 50-366/78-55 W/In 30 Days.Caused by Deviation Rept 2-78-79 Not Received by Responsible Dept Head Nor Superintendent of Plant Engr Svcs.Personnel Were Reminded of Procedures
ML20062F3999 December 1978/03L-0 on 781027:severe Arcing at Exciter Collector Ring of B31-S001A Trippingamg Set Causing Ring & Brushes to Burn.Caused by Bolts Used to Fasten Brush Holders to Yoke Assembly Having Insufficient Length
ML20147C2989 December 1978/03L-0 on 781203:settings Found at 1090 Psig on Turbine Control Valve Fast Closure Oil Pressure Low Trip Switches 2C71-N005A & 2C71-N005B.Tech Specs Req 1100psig. Caused by Instru Drift
ML20147C2538 December 1978/03L-0 on 781204:in Run Mode,Both Secondary Containment Doors on the 130 Ft El Were Opened at the Same Time Due to Personnel Error.Incident Presented No Hazards. Personnel Were Reminded of Proper Procedure
ML20147C1471 December 1978/03L-0 on 781117:during Reactor Water Level Test & Calibr HND-2-5281,2B21-NO25A Failed to Meet Acceptance Criteria Due to Mech Failure of Instru.Caused by Binding of Pointer Shaft Inits Bushing on Low End of Scale
ML20147C1941 December 1978/03L-0 on 781117:procedure HNP-2-3003 Was Not Completed W/In Specified Interval Per Tech Specs 4.3.1.1(4) for Instru 2B21-N017D.Caused by Personnel Repairing 2 Other Instru & Procedure Had to Be Stopped Due to Repairs
ML20147C26228 November 1978/03L-1 on 780724:average Drywell Temp Exceeded Limit of 135F as Set Forth in Tech Specs 3.6.1.7.Caused by Stratification of Air Temp in Drywell
ML20147C20722 November 1978/03L-0 on 781109:suppression Chamber Drywell Vacuum Breakers Were Not Demonstrated Operable W/In Tech Spec Time Limit Due to Personnel Error
ML20147C33422 November 1978/03L-0 on 781115:procedure HNP-2-5202 Took Over 2 Hours Because 2B21-NO17C Could Not Be Calibr.Instru Was Replaced
ML20062F40220 November 1978/03L-0 on 781120:during NRC Audit It Was Found That RHR Time Delay Relay E11-K126 Had Been Left in Uncalibrated State from 780412 to 780627.Redundant Relays E11-K125 a & B Were Functioning.Procedures Will Be Rev
ML20062D64720 November 1978/03L-0 on 781109:during Normal Oper Core Drills Were Made Thru Diesel Generator Room Walls to Allow Conduit to Be Run Thru Walls.Fire Watch Established Per Tech SpecsFire Watch
ML20148P41520 November 1978/03L-0 on 781102:reactor Maximum Cooldown Rate of 100 Degrees F Exceeded During Reactor Auto Scram & Vessel Depressurization.Caused by Personnel Error;Personnel Have Been Admonished
ML20197D41520 November 1978/01T-0 on 781109:suppression Chamber to Drywell Vacuum breaker(2T48-F323I)inoperable.Caused by mis-interpretation of Tech Specs
ML20062D32515 November 1978/03L-0 on 781101:a Main Steam Line Radiation Monitor (D11-K603D) Failed to Initiate a Half Scram During a Test.Caused by a Loose Wire Which Had Damaged Some ComponentsHalf scram
ML20062D35614 November 1978/03L-0 on 781031:surveillance of Fire Protec Equip & Circuitry(Procedures HNP-1-3356 & HNP-1-3360)had Been Neglected Due to Personnel Oversight.Importance of Fire Detector Surveillance Reemphasized to Personnel
ML20197C90914 November 1978/03L-0 on 781031:during Procedure HNP-2-10531 & Reactor in Run Mode,The 2R43-S001 C Diesel Failed to Reach 250 RPM W/In 7 Seconds,Due to Faulty Elec Speed Switch Signal
ML20062D31513 November 1978/03L-0 on 781028:at 95% Rated Pwr,Lprm Calibr OD-1 Was Performed,Changing Cmflpd from 0.97 to 1.004.Flow Was Reduced After Which Peak LHGR Was Reduced to 99% of Its Limit.Caused by Inaccurate Base Distrib in Computer
ML20197D0919 November 1978/03L-0 on 781026:32 Instru Discovered as Having Exceeded Calibr Interval.Caused by Failure of Personnel to Maintain Accurate Calibr Records.Personnel Admonished & Procedures Rev
ML20197D1658 November 1978/03L-0 on 781029:during Scram 2-78-14,2B21-NO24A Instru Switch 2 Failed to Actuate at Setpoint 111.6+/-3.6 Inches.Cause:Magnet on 2 Switch Had Metal Shavings on It. Instru Cover Was Loose & Shavings Entered Instru
ML20197C9417 November 1978/01T-0 on 781101:dimensions of Condensing Pots 2B21-D004 a & B Were Found to Be Installed Per Design Causing RCIC & HPCI High Level Trips to Exceed Tech Spec
ML20150C1853 November 1978/03l-0 on 781027:while Performing Procedure HNP-2-10315,2E41-F001 Valve Failed to Oper During HPCI Quick Start.Caused by Motor Shunt Field Insulation Failure
ML20150C1992 November 1978/03L-0 on 781018:hose Stations Were Not Inspected as Req by Tech Spec.Caused by Changeover in Procedures, Resulting in Oversight.Personnel Instructed & New Procedures Implemented
ML20062C7942 November 1978/03l-0 on 781022:severe Arcing Observed at Exciter Collector Ring of B31-S001A.A M.G. Set Tripped Before It Could Be Removed from Svc.Bolts Used to Fasten Brush Holders to Yoke Assembley Caused Brushes to Arc
ML20197C01927 October 1978/03L-0 on 781017:during Startup Testing While Calibrating APRM High Flux Scram Setpoints,Discerned That Trip Setpoints Were Set in Excess of Reg Guide Criteria. Caused by Deficiency in Procedures
ML20062G27930 June 1978/03L-1 on 780609:procedure HNP-1-3902,Safety Relief Valve Functional Test Tried Unsuccessfully on 2 Solenoids.One Failed Due to Bent Plunger;Other Failure Due to Plunger Not Properly Secured to Actuating SpringsLocktite