:on 860101,w/unit Shut Down for Scheduled Refueling Outage,Reactor Water Conductivity Sample Not Taken.Caused by Personnel Error.Other Specified Conductivity Samples Taken & Satisfactorily Analyzed
ML20137R436
Person / Time
Site: Hatch 
Issue date: 01/31/1986
From: Randy Baker, Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
LER-86-001, LER-86-1, SL-256, NUDOCS 8602130165
Download: ML20137R436 (3)


LER-1986-001, on 860101,w/unit Shut Down for Scheduled Refueling Outage,Reactor Water Conductivity Sample Not Taken.Caused by Personnel Error.Other Specified Conductivity Samples Taken & Satisfactorily Analyzed
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(1)
3211986001R00 - NRC Website

text

w senC form aos U s. NUCLE 42 LEGULATORY COAmeigB404 M38 APPROVED Oese toO 3190-0104 LICENSEE EVENT REPORT (LER)

'""'8''**

FACILITY NAast (1)

DOCKET NuesgER (2)

FAGE im EDWIN 1. HATCH, UNIT l o is t o go lol3 l 2l1 1 loFl 0 l2 TITLE (48 PERSONNEL ERROR CAUSES HISSED REACTOR WATER CONDUCTIVITY MEASUREMENT EVENT DATE (St LER NUMSER (S) -

REPORT DATE (75 OTHER F ACILITiES INVOLVED (el MONTH DAY YEAR YEAR 7.

MONTM OAV vtAR

' ACILITV N Auss DOCKET fouMSERIS) 015101010 1 I I 0l 1 d1 86 8 l6 0l 0 l1 0l C 0l 1 3l1 8\\6 oistoioioi I

~

" ' ' " " ' " ' " ' " " " * " ^ * " " ' " " ' " ' " ' " " " ' * ' " ' ' ' ' ' ' * * * ' * * * ' " ' ' * " * - * ' ' " "

O*E'iaTiNa 5 " ".'402(bl 0800E te) 30 20 40Siel to.73tsH2HM 73.711166 ER 20.405(eH1H4 to.3steltil 50.731sH3Het 73.7t tel 0,0 o i

30 0.NinH.,

.0.=(simi

.0 73Nn2H.e.

gi=s=

no, 30 40SieH1Hiin 90.73teH2HH to 73(sH2H,sasHal JssAs 30 408taH1Havl 30.73(aH2HA) 30.73teH2HvillHel 30.405(eH1Het to.73mi(2Hiau 80.73(sH2 Hap LICENSEE CONTACT FOR TMIS LER (121 41ME TELEPHONE NUMSER ARE A CODE Raymond D. Baker, Nuclear Licensing Manager - Hatch 4l0 4 512(>1 17io 1l6 i

COMPLETE ONE LINE FOR EACM COMPONENT F AILURE DESCRISED IN TMiG REPORT H3)

AC.

RE TA8d L

'g CiUSE SYSTEM COMPONENT pngg

CAUSE

system COMPONENT TU E T

S I

, I I I I I l

l l I I I I G

I I I I l l l I

I I I l I l M

SUPPLEMENTAL RE9uRT EXPECTED Hee MONTM OAy vgAR SUOuissiOas YES fif yee, tennente fMPfCTRO SV3helS$10N DATE)

NO l

A T R ACT <L-,.,

< e.. e,..

y A-,,.. ~6*.,,,,,,.., n vat approximately 08 0 CST with the unit stutdown for a schechled refueling On 01/01/86 outage and all fuel removed from the reactor vessel, a reactor water conchetivity sanple recuired by Technical Specifications Section 4.6.F.2.a.1 was not taken.

A non-licensed plant foreman mistakenly instructed a technician to obtain a reactor water conchctivity sample from Unit 2 instead of Unit 1.

'Itat foreman mistakenly asmmed that the four hour sanpling recnirement, which he knew to be in effect, was applicable to the unit which was operating at that time (Unit 2).

There were no actual or potential safety consecuences as a remit of this event nor were the health and safety of the p2blic affected since the unit was stutdown and depresm rized and no fuel was in the vessel.

Fu rthermore, all other specified concbetivity samples have been taken and analyzed with satisfactory remits since the date that the four hour recnirement went into effect.

8602130165 060131

{DR ADOCK 000003g3 PDR IEdl

'/g

""'i>'- "'

0

~

e.. se.A u s. wuua o asauwca, comminion LICENSEE EVENT REPORT (LER) TEXT CONTINUATION APPROvtD Out NO 3HO-4 04 exe Re.is 9 ACsLaTV NAA0611)

DOCKli NvMSER 820 ggg gyggggggg a

pagg gg, "R:.W

"'#3:

naa EDWIN I. HATCH, UNIT I 010l1 o l5 l0 l0 l0 p 12 l 1 816 0l0 Q2 0F 0 l2 runn- -. -

u cr amir.mn This 30 day LER is recuired by 10CFR 50.73(a) (2) (1) (b) becaise the coMitions of Technical Specifications Section 4.6.F.2.a.1, which recuires an in-line reactor coolant conictivity sample to be obtained every four hours whenever the contiruous conc 12ctivity monitor is inoperable, were not met.

On 01/01/86, the unit was in a refueling mode and all fuel was removed from the reactor vessel. The Reactor Water Clearup- (RWCU) system was cut of service, thereby rendering the contirucus con &ctivity monitor (1G31-R601) inoperable.

Technical Specifications Section 4.6.F.2.a.1 states that whenever the contiruous conchetivity nonitor is inoperable, an in-line conictivity sample shall be obtained at least once every fcur hours.

In accordance with this specification, a sanple was recnited to be taken at 0800 CST on 01/01/86.

At approximately this time, a non-licensed plant foreman mistakenly instructed a technician to obtain a conictivity sample from Unit 2 instead of Unit 1.

That foreman had mistakenly assumed that the fcur hour sanpling recnirement, which he knew was in effect, was applicable to the unit which was operating at that time (Unit 2).

The. ca2se of this event was personnel error in that the foreman was not aware that cont ctivity samples were recuired to be taken every fou r hours for Unit 1.

The inportance of being fully cognizant of plant conditions and the specific recuirements dictated by those conditions was disasssed with all lab foremen.

There were no actual or potential safety consecuences as a remit of this event nor were the health and safety of the p2blic affected since the unit was shitdown and depresairized and no fuel was in the reactor vessel.

Rirthermore, samples had been obtained every four hours from 12/10/85 (the date on which RWCU was removed from service for sche & led maintenance and modification) until the time of the event and every four hours afterwards up to the date of this report. Therefore, claring the time period since the four hour sampling recuirement of Technical' Specifications Section 4.6.F.2.a.1 took cffect, all other recuired reactor coolant con & ctivity samples were taken.

All conictivity sanples taken & ring that time period ware within the limit established ty Technical Specifications Section 3.6.F.2.d.

'Ihis missed sirveillance occurrence is similar to the event described in LER 50-321/85-014.

go

Georgta' Power Company 4

333 Piedmont Avenue Atlanta, Georgta 30308 -

Telephone 404 526 6526 f,ta,hng AdJress:

Post Off.ce Box 4545 Atlantz Georg;a 30302 Georgia Power L T. Gucwa ttw sout%.wn e;ectic system.

' Manager Nuc! ear Engineenng and Ch-ef Nuclear Eng:neer SL-256 0166C

.Tanuary 31, 1986 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.

20555 Attached is Licensee Event Report 50-321/1986-001.

This report meets the -

reporting requirements of 10 CFR 50.73(a)(2)(1)(b).