Administrative Procedure 1013,Revision 7, Bypass of Safety Functions & Jumper Control.
ML19209B579
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 02/21/1978
From:
METROPOLITAN EDISON CO.
To:
References
1013, NUDOCS 7910100180
Download: ML19209B579 (27)


Text

g 1013

[. 9 Revision 7 x

THREE MILE ISLAND MUCLEAR STATION PORC cffA*! l STATION ADMIi;ISTPJ.TIVE PROCEDURE 1013 Ul\ T 1 BY' PASS OF SAFETY FUi!CTI0i:S AND JUMPER CONTROL Teble of Effective Paces C0h R0_ ED COPY Pace Date Re/ision Pace Date Revision g Revision 1.0 02/21/78 7 (, .

2.0 02/21/78 /

f M-2.1 10/09/77 6 G 3.0 07/17/74 3 'D 4.0 02/21/78 7 4.1 02/21/78 7'

\

5.0 10/09/77 e ,

5.1 10/08/76 4 -

6.0 07/17/74 3 7.0 12/19/73 1 8.0 02/21/78 7 9.0 10 C8/76 a ,,

10.0 12/19/73 1 11.0 12/19/73 1

.12.0 12/19/73 1 13.0 12/19/73 1 la.0 10/08/76 4 ,

15.0 06/06/77 5 16 0 06/06/77 5 17.0 06/05/77 5 18.0 10/08/76 a -

19.0 10/08/76 4 20.0 10/08/76 4 '

21.0 10/08/76 4 22.0 10/08/76 4 ,

23.0 02/21/78 7

Unit 2 Staff Re:cmmends Apcrova!

Unit 1 Staff RecomRends ll Accrowl l\

i i j '

ll -

Approval / \ i +l ' Date Approvat -- -

Date -

Cogni:pnt Ofpf Head Cognjzent. Dept. Head Unit 1 PORC Recommends Approval Unit 2 PORC Recommencs Approval t ':L Date )< } ( E*- Date5T* ?E Chairman of PORC

.an of PORC PfCha Unit 1 Superintendent Approva! Unit 2 Superintendent Approval ,

$ w.) Date 'Ll I 7 l~) j' '/ Dr /-1?.q:D Dates /$ ~P ff

' ~ '

, , ,V I Mansjer Generation Quality Assursnce Approval . #.A 6 [7ebNG Date ,7 81 7f 79101 00 t( h 4

. m ss-A a. s/77 b --) k l . -.

  • < 1013

- Revision 7

. 02/21/78 THREE MILE ISLAND NUCLEAR STATION ADMINISTRATIVE PROCEDURE 1013 BYPASS OF SAFETY FUNCTIONS AND JUMPER CONTROL l TABLE OF CONTENTS A. GENERAL

/

1. Purpose
2. Scope
3. References B. RESPONSIBILITIES
1. Maintenance Department
2. Operations Department C. LIMITS AND PRECAUT:0NS
1. Bypass of Safety Functions
2. Jumper, Lifted Leads and Temporary Mechanical Modification Control D. DETAILED PROCEDURES ENC 1.03URES
1. Table of Unit 1 Safety Bypass Functions
2. Jumper Logsheet
3. Lifted Leads Logsheet
4. Temporary Mechanical Modification Logsheet
5. Table of Unit 2 Safety Bypass Functions 1122 243

- < 1013

. Revision 7

. 02/21/78 A. GENERAL

1. Purpose.

The purpose of this procedure is to establish methods to insure that bypassing of reactor safety functions, installation of electrical jumpers and lifting of electrical and temporary mechanical modifications will be properly controlled, identified, and recorded in the appropriate control room logs.

2. Scope.

This procedure provides the requirements for control and documenting the following functions:

a. Use of the bypass features listed in Enclosure I and V.
b. Lifting of electrical leads or opening links in an electrical circuit.
c. Installation of electrical jumpers.
d. Installation or removal of blank flanges that are not a design part of the system.
e. Use of spool pieces or temporary lines that are not a design part of the system.
f. Evaluating lifted leads, jumpers and temporary mechanical modifications left longer than 12 months.

This procedure does not include spool pieces or blank flanges that are a design part of the system that are installed and removed by operating, maintenance, or surveillance procedures.

Pipe caps or blank flanges provided to stop vent or drain valve leakage where the cap (flange) is visable from the vent (drain) valve is likewise not included.

2.0 l]22 244

-

  • 1013 Revision 6 10/09/77
3. References.
a. Controlled Key Locker Control Administrative Procedure AP-1011.
b. Shift relief and log engries, Administrative Procedure AP-1012.

B. RESPONSIBILITIES

1. Maintenance Department.
a. Maintenance personnel shall be thoroughly familiar with this procedure in order to insure that operations personnel are proplerly notified prior to placement of any electrical jumper, lifting of electrical leads, placement of temporary spool pieces, blank flanges or other temporary mechanical modification.

, b. Maintenance personnel shall be responsible for the installation of electrical jumpers, lifting of leads, installation or removal of flanges, spool pieces oc other temporary mechanical modifications.

1122 245 2.1

~

Adm. Proc. 1013 7/17/74 Revision 3 B. RESPONSIBILITIES (Cont'd)

c. Maintenance personnel shall be responsible to insure that the jumper used is compatible with its intended function insofar as wire size, termination, insulation, etc. are concerned.
d. Maintenance supervision shall be responsible for instructing their main-tenance personnel .in the conduct of this procedure.
e. Maintenance personnel shall use a jumper of appropriate size & length for the job. However -a jumper shall be installed until it has been identified by tags,obtained in the control room, placed upon the jumper at each end, and each tag bearing the same No. All jumper tags shall be RED in color.

Use of these tags shall be recorded in the jumper log by number.

f. Maintenance personnel shall place a tag on every lifted land or sliding link. Each tag shall bear a number and shall be BLUE in color. When ob-taining the tag in the control room a record of its use shall be made in the lifted lead log by numbers.
g. Maintenance personnel shall place a metal or bakelite numbered tag on all spool pieces or blank flanges that are not in their normal operating con-dition or position, and "on" all mechanical jumpers or modifications. The reasoa for this shall be logged in the Mechanical Modification Log in the <

control room when picking up the numbered tags.

2. Operations Department
a. Operating personnel will be responsible for performing the bypassing of safety functions and the proper recording thereof.
b. Operating personnel will be responsible for overall control of electrical jum,.er installations, lifted lead conditions, and temporary mechanical modifications.
c. Operations supervision will be responsible for training operations personnel in the coiduct of this procedure.
d. Key control for the control of key switches associated with bypassing safety function: shall be the responsibility of the operations uepartment and 1122 246

. 1013 l

~

Revision 7

, .02/2T/78 shall be performed in accordance with Administrative Procedure 1011 (Controlled Key Locker Control).

3. Engineering Department
a. Engineering personnel having cognizance over the jumper or lead shall perform an evaluation on those in effect longer than 12 months. The evaluation should identify the reasons l

why the wiring change has not been made permanent and what final disposition of the situation is intended.

C. LIMITS AND PRECUATIONS

1. Bypassing of Safety Functions.
a. The bypassing of a safety function shall in no way jeopardize Unit safety or violate TMI's Unit 1 or Unit 2 Technical Specifications or operating documents.
b. Bypassing of safety functions will normally be performed during routine Unit start-up and shutdown operations, periodic surveillance testing or other specific modes of operations or maintenance as dictated by the applicable Metropolitan Edison documents (E.G. operating procedures, maintenance procedures, surveillance procedures, etc.).
2. Jumper and Lif ted Leads Control.
a. In no case will temporary electrical jumpers be installed or leads liftec without the consent of the Shift Foreman.

Permanent wiring changes do not fall within the scope of this procedure.

3. In no case will temporary mechanical modifications be made without the consent of the Shift Foremen. Permanent piping or equipment changes do not fall within the scope of this procedure.

~4. 0 1122 247

1013 Revision 7

, 02/21/78 D. DETAILED PROCEDURES

1. Bypass of Safety Function.
a. This procedure addresses itself to bypassing of safety functions in the following systems:

4.1 1122 248

. 1013 Revision 6 10/09/77 (1) Reactor Protection System.

(2) Engineered Safeguards Actuation System (Unit 1).

(3) Safety Features Actuation System (Unit 2).

(4) Control Rod Drive System.

(5) Radiation Monitoring System.

(6) Emergency Feed Water System.

(7) Main Feed Water System.

(8) Turbine lift pumps pressure switch bypass.

(9) Unit 1 E.S. Breaker control key-operated bypass switches (69).

(10) Unit 2 E.S.F. Breaker control permissive switches (69),

b. The bypassing shall normally be accomplished by the control room operator by means of the bypass switches listed on Enclosure 1 (Unit I), or Enclosure V (Unit 2).

The safety bypass switch enclosures identify the switch bypass functions and switch locations under the scope of this procedure for the applicable unit.

c. The Unit 2 permissive switches (69) operating handles shall be removed from the switchgear and controlled by the Shift Foreman.
d. When it is determined that the bypass should be in effect and all system prerequisites have been met per the applicable operating, surveillance, and/or maintenance procedures, the control room operator will initiate the bypass and enter the following data in the _ control room operator's log. The Shift Foreman will also enter this information in the shift foreman's log.

5.0 1i22 249

~

1013 Revision 4 10/08/76 (1) Bypass function title.

(2) Date and time bypass is placed in effect.

(3) Reason for bypass,

e. If the bypass is other than a normal . plant bypass function and requires the installation of an electrical jumper, an appropriate entry should also be made in the jumper and lifted leads control log (refer to paragraph D.2.c).
f. Whenever a bypass of a safety function is removed, the control room operator and the Shift Foreman will make the following entry in their respective logs:

(1) Bypass function title.

(2) Date and time bypass is removed.

(3) Reason for removing the bypass.

2. Electrical jumper, Lifted leads and Temporary Mechanical Modifications Control
a. This procedure addresses itself to the control and recording of installation of electrical jumpers, lifted leads, and temporary mechanical modifications.

1122 250 5.1

ADM PROC. 1013 7/17/74

. . Revision 3 D. DETAILED PROCEDURES (Cont'd)

b. A log bearing the title " JUMPER, LIFTED LEADS AND TEMPORARY MECHANI-CAL MODIFICATIONS CONTROL LOG" shall 'e retained in the control room by the control room operator. Entries in the log will be made by the person performing the operation or his designee and initialed by the Shift Foreman prior to placing the jumper, lift-ing a lead or making a temporary mechanical modification.
c. Three types of log sheets will be used in the log book depending upon the nature of the work to be done. The Jumper Log Sheet (ENCLOSURE II) will be used when placing an electrical jumper, the Lifted Leads Log Sheet (ENCLOSURE III) will be used when lifting electrical leads, and the temporary Mechanical Modifica-tion Log Sheet (ENCLOSURE IV) will be used when making a temporary mechanical modification.
d. Whenever jumpers are placed the following information shall be filed in the log:

Log No.

Date Time From: Cabinet, T.B. No., Term No.

To: Cabinet, T.B. No., Term No.

Requested by Installed by Shift Foreman's initial Reason 6.0 1122 251

. Adm. Proc. 1013 12/19/73 Revision 1 Whenever the jumper is renaved the following information shall be filled in the log:

Date Time Removed By

e. Whenever leads are lifted the following information shall be filled in the log:

Log No.

Date Time Wire No. Rev Location: Cabinet, T.B. No., Term No. 1 Requested By Shift Foreman's initial Reason Whenever the leads are replaced the following information shall be filled in the log:

Date Time Replaced By

f. Whenever temporary mechanical modifications are I ade the following information shall be filled in the log:

Log No.

Date Time Temporary Mechanical Modification Description Shift Foreman's initial Reason i122 252 7.0 ,

- , 1013 Revision 7

~

"02/21/78 Whenever the temporary mechanical modification is restored or removed to its original condition fill in the following infor-mation:

Date l

Time

~/

Restored to original condition by

3. Evaluation of Lifted Leads, Jumpers or Temporary Mechanical Modifications in Effect Greater than 12 Months.
a. When a lifted lead, jumper, or temporary mechanical modification is in effect greater than 12 months it snould be evaluated by the cognizant engineer for the affected system. tiormally, the audit of the log book will identify this and a cognizant engineer should be notified.
b. The evaluation should document the reasons why the wiring change has not been mada pe:manent (or removed) and what final disposition of the situation is intended.
c. A copy of this written evaluation should be attached to the log sheet for the applicable lifted lead, jumper, or temporary mechanical modification until tre item is closed out or a permanent change is implemented.

1i22 253 8.0

1013

. . . Revision 4 10/08/76 Enclosure 1 UNIT 1 BYPASS / SWITCH FUNCTION System Switch Title Switch Location Reactor Protection - Shutdown Bypass RPS N1/RPS Sub Assembly System Channel A A Cabinet #2 RPS Channel A Bypass N1/RPS Sub Assembly A Cabinet #2 Shutdown Bypass RPS N1/RPS Sub Assembly Channel B B Cabinet #2 RPS Channel B Bypass N1/RPS Sub Assembly B Cabinet #2 Shutdown Bypass RPS N1/RPS Sub Assembly Channel C C Cabinet #2 RPS Channel C Bypass N1/RPS Sub Assembly C Cabinet #2

, Shutdown Bypass RPS N1/RPS Sub Assembly Channel D D Cabinet #2 RPS Channel D Bypass N1/RPS Sub Assembly D Cabinet #2 Engineered Safe- H.P. Inj. RCl Bypassed Centar Left Console guards Actuation H.P. Inj RC2 Bypassed (CL)

System H.P. Inj . RC3 Bypassed L.P. Inj. RC4 Bypassed Center Left Console L.P. Inj . RC5 Bypassed (CL)

L.P. Inj. RC6 Bypassed RB1 Isolate RB1 ES Center Left Console Defeated (CL)

RB2 Isolate RB1 ES Defeated RB3 Isolate RB1 ES Defeated H.P. Inj . RCl Bypassed Center Right Console H'.P. Inj . RC2 Bypassed (CR)

H. P . Inj . RC3 Bypassed 9.0 ,22 2b4

Adm. Proc. 1013 12/19/73 Revision 1 Enclosure 1 (cont'd) System Switch Title Switch Location Engineered Safe- L.P. Inj. RC4 Bypassed Center Right Console guards Actuation L.P. Inj . RC5 Bypassed (CR) System L.P. Inj . RC6 Bypassed RB1 Isolate RB1 ES Defeated Center Right Console RB2 Isolate RB1 ES Defeated (CR) RB3 Isolate RB1 ES Defeated Control Rod Drive Dilute Permit Bypass SL2 CRD System Logic System Cabinet #2 (Relay Rs.) Rod Group 7 Out Limit CRD System Logic Bypass SL1 Cabinet #2 (Relay Rm.) Asy= metric Rod Fault Bypass CRD System Logic (69 "S-2" Switches) Cabinet #4 Position Indication Amplifiers (Relay Room) Safety Group Out Limit CRD System Logic Bypass Cabinet #3 Radiation Moni- Ed-L6 - Waste Water Panel Right Front toring System Discharge Interlock Defeat (PRF) RM-L7 - RM-L6 Backup Panel Right Front Interlock Defeat (PRF) RM-L8 - Miscellaneous Su=p Panel Right Front Discharge Defeat (PRF) RM-A7 - Waste Gas Discharge Panel Right Front Interlock Defeat (PRF) RM-Al - Control Room Atmo- Panel Right Front spheric Monitor Interlock (PRF) Defeat RM-A4 Fuel Handling Bldg. Panel Right Front Atmos. Monitor Interlock (PRF) Defeat RM -A6 Aux. Bldg. Atmos. Panel Right Front Monitor Interlock Defeat (PRF) RM-A8 Aux. & Fuel Handling Stack (PRF) Bldg. Monitor Interlock Defeat 10.0 l12 255

      . Adm. Proc. 1013                                  12/19/73 Revision 1 Enclosure 1 (cont'd)

System Switch Title Switch Location Radiation Moni- RM-A9 Reactor Building Monitor Stack (PRF) toring System Defeat Feedwater System "A" Steam Line Break Feedwater Center Console (CC) Shutoff Defeat "B" Steam Line Break Feedwater Center Console (CC) Shutoff Defeat "A" Steam Line Break Backup Center Console (CC) System "B" Steam Line Break Backup Center Console (CC) System Emergency Feed- EXER FPT Auto Start Defeat Center Censole (CC) water System Turbine Lube Oil Turbine Lift Pump Pressure Panel Left Front System Switch Interlock Defeat (PLF) (10 Bypass Switches - one for each pressure switch) 6900 Volt Breaker Control Bypass Switch Switchgear (69 Switches) Reactor Plant Bus lA 6900 V. Swgr. lAl Feeder Breaker 1SA-02 Reactor Plant Bus lA 6900 V. Swgr. lA4 Feeder Breaker ISB-72 Reactor Plant Bus 1B 6900 V. Swgr. 1B1 Feeder Breaker 1SA-72 Reactor Plant Bus 1B 6900 V. Swgr. 1B4 Feeder Breaker ISB-02 RC Pump 1A 6900 V. Swgr. lAZ RC Pump 1B 6900 V. Swgr. 1BZ RC Pump 1C 6900 V. Swgr. lA3 RC Pump 1D 6900 V. Swgr. 1B3 11.0 k 2b _ _ \

 .       . Adm. Proc. 1013                               12/19/73 Revision 1 Enclosure 1 (cont'd)

System Switch Title Switch Location 4160 Volt Breaker Control Bypass Switch Switchgear (69 Switches) 1SA-D2 E.S. Bus ID 4160 V. Swgr. 1D15 Feeder Breaker ISB-D2 E.S. Bus 1D 4160 V. Swgr. 1D1 Feeder Breaker 1SA-E2 E.S. Bus lE 4160 V. Swgr. 1E14 Feeder Breaker ISB-E2 E.S. Bus lE 4160 V. Swgr. lEl Feeder Breaker P1-02 Transformer IP 4160 V. Swgr. 1D5 Feeder En ker R1-02 Transformer 1R 4160 V. Swgr. 1Dll Feeder Breaker Sl-02 Transfor=er 1S 4160 V. Swgr. lE6 Feeder Breaker T1-02 Transformer IT Swgr. lE12 Feeder Breaker G1-02 Diesel Generator lA Swgr. 1D2 Breaker G11-02 Diesel Generator 1B Swgr. lES Breaker Motor Driven Emergency FW Swgr. 1D3 Pump EF-P2A from Switchgear Motor Driven E=ergency FW Swgr. 1D4 Pump EF-P2B from Switchgear Reactor Building Spray Pump Swgr. 1D9 BS-PlA , Reactor Building Spray Pu=p Swgr. lE10 BS-PlB Reactor E= erg. Clg. River Swgr. lEll Water Pu=p PR-PlA 12.0

Adm. Proc. 1013 12/19/73

              .                                                 Revision 1 Enclosure 1 (cont'd)

Systes Switch Title Switch Location 4160 Volt Decay Heat Re= oval Pump DH-PlA Switchgear 1D6 Switchgear Decay Heat Re= oval Pu=p DH-PIB Switchgear lE7 Makeup Pu=p MU-PlA Switchgear 1D7 Makeup Pu=p MU-PlB Switchgear 1D8 Makeup Pump MU-PlB Switchgear lE9 480 Volt Breaker Control Bypass Switch Switchgear (69 Switches) 1P-02 1P E.S. Bus Feeder Switchgear IP-1B Breaker IP-1B 1R-02 1R Screen House Bus Switchgear 1R-1B Feeder Breaker 1S-02 15 E.S. Bus Feeder Switchgear 1S-1B Breaker 1T-02 1T Screen House E.S. Switchgear IT-1B Bus Feeder Breaker LA E.S. Control Center Switchgear IP-lC Feeder Breaker 1B E.S. Control Center Switchgear 1S-lC Feeder Breaker lA Screen House Control Switchgear 1R-4C Center Feeder Breaker 1B Screen House Control Switchgear IT-4C Center Feeder Breaker "A" Decay Heat Closed Switchgear IP-2A Cooling Water Pump DC-PIB "B" Decay Heat Closed Switchgear 1S-2A Cooling Water Pump PC-PlB "A" Decay Heat River Water Switchgear 1R-2C Pu=p DR-PlA "B" Decay Heat River Water Switchgear IT-2C Pump DR-P1B 2 13.0 i

1013 Revision 4 0/08/76 ENCLOSURE 1 (cont'd) System I Switch Title Switen Location 480 Volt "A" Nuclear Service Closed Switchgear IP-3C Switchgear Cooling Water Pump NS-PlA "B" Nuclear Service Closed Switchgear IP-3D Cooling Water Pump NS-PlB "C" Nuclear Service Closed Switchgear 15-3C Cooling Water Pump NS-Plc "A" Nuclear Service River Switchgear 1R-2B Water Pump NR-PlA "B" Nuclear Service River Switchgear 1R-3A Water Pump flR-PIB-R "B" Nuclear Service River Switchgear 1T-3A Water Pump NR-PlB-T "C" Nuclear Service River Switchgear IT-2B Water Pump NR-Plc Reactor Protection Power / Pump Monitor 1 Bypass P/P monitor #1 SSl System (Power / Pump A PumpMonitor) Power / Pump Monitor i Bypass P/P Monitor #1 SSl Pump B

                    . Power / Pump Monitor i Bypass     P/P Monitor #1 551 Pump C Power / Pump Monitor 1 Bypass     P/P Monitor #1 SS1 Pump D Power / Pump Monitor 2 Bypass     P/P Monitor #2 SSl
                    . Pump A Power / Pump Monitor 2 Bypass     P/P Monitor #2 SSl Pump B Power / Pump Monitor ? Bypass     P/P Monitor #2 SS1 Pump C Power / Pump Monitor 2 Bypass     P/P Monitor #2 SS1 Pump D 14.0                          1122 25')

3

1013 . Revision 5 - ENCLOSURE II 06/06/77 . THREE MILE ISLAND NUCLEAR STATION UNIT s ELECTRICAL M PER LOG Jumper Tag No. Fill out prior to placing Jumper " . , , ,mn n ,.c anm,n,i

                                                                                                                                ~~

8 FROM TO ' Term Term Sh'ft . Date Block Term Block Term Request Fr eman Install Reason / System Date Rem. Time Cabinet # # Cabinet # # By I 'ialt By Affected Time By w N N Os CD 4m A

y B d e c a l o

                         .      s         e o                  m N        R_       i s       T 5                  g       d a        a e n7               T         e t o7                        L a i /               d            D s6                a 3i 0                  e 1 v/                  L 0e6 1 R 0                 d e

t f i L d e t c e f f A m e t s y S

                                        /

n N o O s I a T e A R T S I G I R O s I A L nl E aa EL D t mi RC A f et UU E iri 0 SN L hon O SFI 6 L D 1 C ~C !TE N?nT E tU F t c I s I L e uy E qB L e I R M E E # R m H r T e T s . d a N B. e O T I l T a 4 t n 7 e i '- n t L i f b i a L C o e t r r i# o W i. P r e t m u i O T l e l t i a F D h i . Ii i

                                                      - w N NC-

1013 *-

  • Revision 5 ENCLOSURE IV 06/06/77 THREE MILE ISLAND NUCLEAR STATION -

UNIT Temporary MechanicalsModification tog Tag No - Add or Remove Blank Flanges Spool Pieces etc. Fil out prior to making temporary Hechanica llodi fic; tion Restored to Original vate Description & Shift __Date Time Location of Temp. Modification {0Je7ag Reason / System Affected Time By aussed N N CP N 17.0

1013 Revision 4 10/08/76 ENCLOSURE V UNIT 2 BYPASS / SWITCH FUNCTION SYSTEM SWITCH TITLE SWITCH LOCATION Reactor Protection Shutdown Bypass RPS Channel A Panel 36 System RPS Channel A Bypass Panel 36 Shutdown Bypass RPS Channel B Panel 21 RPS Channel B Bypass Panel 21

                            , Shutdown Bypass RPS Channel C Panel 35 RPS Channel C Bypass            Panel 35 Chutdown Bypass RPS Channel D   Panel 39 RPS Channel D Bypass            Panel 39 Safety Features    Safety Inj. RClA Bypass         Panel 3 Insert Actuation System Safety Inj. RC2A Bypass         Panel 3 Insert Safety Inj. RC3A Bypass         Panel 3 Insert
         '                  R.B. Cooling & Isolation        Panel 3 Insert RBlA Defeat R.B. Cooling & Isolation        Panel 3 Insert RB2A Defeat R.B. Cooling & Isolation        Panel 3 Insert RB3A Defeat Safety Inj. RClB Bypass         Panel 3 Insert Safety Inj. RC2B Bypass         Panel 3 Insert Safety Inj. RC3B Bypass         Panel 3 Insert
         .                  R.B. Cooling & Isolation        Panel 3 Insert RBlB Defeat R.B. Coolir.g & Isolation       Panel 3 Insert RB2B Defeat R.B. Cooling & Isolation        Panel 3 Insert RB3B Defeat 18.0 1122 263
      ~

1013 Revision 4 EliCLOSURE V (cont'd) UttIT 2 BYPASS / SWITCH FUNCTION SYSTEM SWITCH TITLE SWITCH LOCATION C' atrol Rod Safety Rods Out Bypass Cabinet 105 (SL3) Drive System Switch (51) Cable Room CRD System Logic Cabinet 3 Asymmetric Rod Fault Cabinet 103 (SL6) Bypass (S2) Cable Room CRD System Logic Cabinet 6 Radiation HP-R-219 Station Vent Panel #12 Control Room Monitoring Interlock Defeat System HP-R-220 Control Room Intake Panel #12 Control Room Duct Interlock Defeat HP-R-221 A - Fuel Handling Panel #12 Control Ro0m Bldg. Exhaust Duct, Upstream of Filter, Interlock ' ' feat HP-R-221B - Fuel Handling Panel #12 Control Rcom Bldg. Exhaust Duct, Downstream of Filter, Interlock Defeat HP-R-222 - Auxiliary Bldg. Panel #12 Control Room Exhaust Duct A, Interlock Defeat HP-R-225 - Reactor Bldg. Purge Panel #12 Control Room Exhaust Duct A Interlock Defeat HP-R-226 - Reactor Bldg. Purge Panel #12 Control Room Exhaust Duct B Interlock Defeat HP-R-228 - Auxiliary Bldg. Purge Panel #12 Control Room Exhaust Duct B Interlock Defeat HP-R-229 - Reactor Bldg Hydrogen Panel #12 Control Room Purge Duct, Interlock Defeat WDG-R-1480 - Waste Gas Discharge Panel #12 Control ..aom Interlock Defeat WDG-R-1485 - Decay Tank - 1A Panel #12 Control Room Discharge Interlock Defeat WDG-R-1486 - Decay Tank - 1B Panel #12 Control Room Discharge Interlock Defeat 19.0 1122'264

1013 Revision 4 ENCLOSURE V (cont'd) 10/08/76 UNIT 2 BYPASS / SWITCH FUNCTION SYSTEM SWITCH TITLE SWITCH LOCATION Radiation VA-R-748 - Condenser Vacuum Panel #12 Control Room Monitoring Pump Interlock Defeat System (cont'd) WDL-R-1311 Liquid Waste Panel #12 Control Room Discharge Interlock Defeat Emergency Emergency'FPT POLL-TO-LOCK Panel #4 Control Room Feedwater System 2A Feedwater Latching System Panel #4 Control Room 2B Feedwater Latching System Panel #4 Control Room 6900 Volt Permissive Control Switch Switchgear (Device #69) BUS 2-1 Main Breaker 2A-12 Swgr. Unit 1-5 BUS 2-1 Main Breaker 2B-12 Swgr. Unit 1-2 BUS 2-2 Main Breaker 2A-22 Swgr. Unit 2-2 BUS 2-2 Main Breaker 2B-22 Swgr. Unit 2-5 RC-P-1A (BUS 2-1) Swgr. Unit 1-3 RC-P-1B (BUS 2-1) Swgr. Unit 1-4 RC-P-2B (BUS 2-2) Swgr. Unit 2-3 RC-P-2A (BUS 2-2) Swgr. Unit 2-4 4160 Volt Permissive Control Switch Switchgear (Device ##'" ESF BUS 2-1E Main Breaker 2A-lE2 Swgr. Unit lE-10 ESF BUS 2-lE Main Breaker 2B-lE2 Swgr. Unit lE-13 ESF BUS 2-2E Main Breaker 2A-2E2 Swgr. Unit 2E-15 EFF BUS 2-2E Main Breaker 2B-2E2 Swgr. Unit 2E-12 20.0 1122 265

        ~

~ 1013 Revision 4 ENCLOSURE V (cont'd) UNIT 2 BYPASS / SWITCH FUNCTION SYSTEM SWITCH TITLE SWITCH LOCATION 4160 Volt ESF BUS 2-2E Main Breaker 2B-2E2 Swgr. Unit 2E-12 Switchgea (cont'd) ESF BUS 2-lE Tie Breaker TlE-2E-2 Swgr. Unit lE-15 ESF BUS 2-2E Tie Breaker T2E-lE-2 Swgt. Unit 2E-1 ESF BUS 2-lE Feeder Breaker Swgr. Unit lE-7 TlE-3E-2 ESF BUS 2-2E Feeder Breaker Swgr. Unit 2E-8 T2E-4E-2 ESF BUS 2-lE Breaker lE-llE-2 Swgr. Unit lE-2 for 480V. ESF USS 2-llE ESF BUS 2-lE Breaker lE-12E-2 Swgr. Unit lE-3 for 480V. ESF USS 2-12E

            ,             ESF BUS 2-lE Reactor Coolant      Swgr. Unit lE-5 Makeup Pump - MU-P-1A ESF BUS 2-lE Reactor Coolant      Swgr. Unit 1E-6 Makeup pump - MU-P-1B ESF BUS 2-lE Decary Heat Removal  Swgr. Unit lE-9 Pump DH-P-1A ESF BUS 2-lE Reactor Building     Swgr. Unit lE-4 Spray pumps BS-P-1A ESF BUS 2-lE Emergency Steam      Swgr. Unit lE-8 Generator Feed Pump EF-P-2A ESF BUS 2-lE Emergency Diesel     Swgr. Unit lE-16 Generators Auxiliary Breaker G2-lE2 ESF BUS 2-2E Decay Ho t Removal   Swgr. Unit 2E-ll Pump DH-P-1B ESF BUS 2-2E Reactor Building     Swgr. Unit 2E-5 Spray Pump BS-P-1B ESF BUS 2-2E Emergency Steam      Swgr. Unit 2E-10 Generator Feed Pump 21.

1122 266

1013 Revision 4 ENCLOSURE V (cont'd) UNIT 2 BYPASS / SWITCH FUNCTION SYSTEM SWITCH TITLE SWITCH LOCATION 4160 Volt ESF BUS 2-2E Breaker 2E-21E-2 Swgr. Unit 2E-3 Switchgear for 480V USS 2-21-E (cont'd) BUS 2E Breaker 2E-22E-2 Swgr. Unit 2E-4 for 480V ESF USS 2-22E BUS 2E Reactor Coolant Swgr. Unit 2E-6 Makeup Pump MU-P-lC BUS 2-2E Reactor Coolant Swgr. Unit 2E-7 Makeup Pump MU-P-1B BUS 2-2E Breaker G22-2E2 Swgr. Unit 2f.-16 Emergency Diesel Generator Auxiliary Breaker BUS 2DG-14160 Volt Emergency Swgr. Unit DGl-A Diesel Generator Breaker G2-12 and DGl-B BUS 2DG-2 4160 Volt Emergency Swgr. Unit DG2-A Diesel Generator Breaker G2-12 and DG2-B BUS 2-3E Tie Breaker to 2-4E Swgr. Unit 3E-2 T3E-4E-2 BUS 2-4E Tie Breaker to 2-3E Swgr. Unit 4E-4 T4E-3E-2 BUS 2-3E Nuclear Service River Swgr. Unit 3E-3 Water Pump NR-P-1A BUS 2-3E Nuclear Service River Swgr. Unit 3E-4 Water Pump NR-P-1B BUS 2-3E Breaker 3E-31E-2 Swgr. Unit 3E-1 for 480V ESF USS 2-31E BUS 2-4E Nuclear Service River Swgr. Unit 4E-3 Water Pump NR-P-1C BUS 2-4E Nuclear Service River Swgr. Unit 4E-2 Water Pump NR-P-lD BUS 2-4E Breaker 4E-41E-2 Swgr. Unit 4E-1 for 480V ESF USS 2-41E 22.0

                                                                       ) { } } ),b

1013

   -                                                                   Revision 7

. 02/21/78 ENCLOSURE V (cont'd) UNIT 2 BYPASS / SWITCH FUNCTION SYSTEM SWITCH TITLE SWITCH LOCATION Reactor Protection Power / Pump Monitor i Bypass P/P Mcnitor #1 SS1, System (Power / Pump 1A Cab 205 Pump Monitor) Power / Pump Monitor 1 Bypass P/P Monitor #1 551, Pump 1B Cab 205 Power / Pump tbnitor 1 Bypass P/P Monitor #1 SSl, Pump 2A Cab 205 Power /Pumo Monitor 1 Bypass P/P Monitor #1 SSl, Pump 2B Cab 205

       ~

Power / Pump Monitor 2 Bypass P/P Ponitor #2 SS1, Pump 1A Cab 206 Power / Pump Ponitor 2 Bypass P/P Monitor #2 SS1, Pump 1B Cab 206 Power / Pump Monitor 2 Bypass P/P Manitor #2 SS1, Pump 2A Cab 236 Power / Pump Monitor 2 Bypass P/P Manitor #2 SS1, Pump 28 Cab 236 RPS/SFAS Reactor Building Pressure Instrument Rack 455 Switches Cabinet Reactor Building Pressure Instri ment Rack 467 Switches Cabinet Reactor Building Pressure instr 2 ment Rack 472 Switches Cabinet Reactor Building Pressure Instrument Rack 452 Switch Cabinet 1122 268

                                                          .}}