MONTHYEARPNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations Project stage: Request ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request Project stage: Acceptance Review PNP 2024-001, License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-02-0909 February 2024 License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations Project stage: Request PNP 2024-005, License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-05-0101 May 2024 License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations Project stage: Request PNP 2024-025, Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 02024-05-23023 May 2024 Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 0 Project stage: Supplement ML24149A0022024-06-24024 June 2024 Federal Register Notice - Noi to Conduct Scoping and Develop an Environmental Assessment for the Palisades Nuclear Plant Reauthorization to Power Operation Project stage: Request ML24219A4202024-09-12012 September 2024 Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071) Project stage: Other ML24295A3622024-10-21021 October 2024 Request for Additional Information Quality Assurance Program to Support License Transfer Request Project stage: RAI 2024-02-09
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24304A8572024-10-29029 October 2024 Draft Request for Additional Information: Palisades Operating Final Safety Analysis Report ML24295A3622024-10-21021 October 2024 Request for Additional Information Quality Assurance Program to Support License Transfer Request ML24289A1962024-10-10010 October 2024 Email Dated October 10, 2024 from Wallace Taylor Indicating His Intention to Refile ML24289A1952024-10-0909 October 2024 Follow-up Email Dated October 9, 2024 from the Office of the Secretary to Wallace Taylor Regarding the Filing Error ML24289A1932024-10-0808 October 2024 Email Dated October 9, 2024 from the Office of the Secretary to Wallace Taylor Regarding Filing Error ML24289A1942024-10-0808 October 2024 Email Dated October 8, 2024 from the Office of the Secretary to the Participants of the Palisades 50-255 & 72-007 LT-3 Proceeding Regarding Filing Error ML24277A3082024-10-0303 October 2024 Restart La Docs - 10-2-2024 Michigan SHPO Comments Re Palisades Nuclear Plant Architectural Survey ML24277A3042024-10-0303 October 2024 Restart La Docs - Sokaogon Chippewa Community Reply to NRC Status Update Re Palisades Restart ML24277A3032024-10-0303 October 2024 Restart La Docs - (External_Sender) Re Status Update - Palisades Request for Reauthorization of Power Operations ML24277A3062024-10-0303 October 2024 Restart La Docs - 9-18-2024 Michigan SHPO Comments on Palisades Phase I Archaeological Survey ML24277A3072024-10-0202 October 2024 Restart La Docs - (External_Sender) ER24-431 Palisades Nuclear Plant Subsequent License Renewal, Covert Township, Van Buren County (NRC) ML24270A2622024-09-26026 September 2024 Email to Petitioners and Licensee Representatives Transmitting Order of the Secretary Re Petition for Declaratory Order from Beyond Nuclear Et Al., for the Palisades Nuclear Plant ML24269A0162024-09-24024 September 2024 Email from Holtec Decommissioning International, LLC Re Reply to Beyond Nuclear Et Al.S Petition for Declaratory Order ML24277A3052024-09-18018 September 2024 Restart La Docs - (External_Sender) Sec. 106 Consultation - ER24-431, Palisades Phase I Archaeological Survey ML24262A0742024-09-18018 September 2024 Restart La Docs - FW Palisades Scoping Comment Period Ended ...E-mail Capture Platform Status ML24262A0732024-09-18018 September 2024 Restart La Docs - FW Palisades Scoping Comment Period Ended ...E-mail Capture Platform Status ML24291A2442024-09-18018 September 2024 Response to Questions from Alan Blind Regarding Public Meeting on August 1, 2024 ML24260A3552024-09-16016 September 2024 Restart La Docs - Palisades Reauthorization of Power Operations- Environmental Audit RCI Responses ML24260A3542024-09-12012 September 2024 Restart La Docs - (External_Sender) Re Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24248A2612024-09-0404 September 2024 Restart La Docs - Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24248A0572024-09-0404 September 2024 Restart La Docs - Draft Letter in Support of Draft RAIs and Draft Environmental Regulatory Audit Plan ML24248A2622024-09-0404 September 2024 Restart La Docs - FW Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24248A0902024-08-28028 August 2024 Steam Generator Inspection Call ML24270A2712024-08-0707 August 2024 Public Comments for August 1, 2024, Public Outreach Meeting on Potential Palisades Nuclear Plant Restart ML24192A0012024-07-0606 July 2024 (E-Mail) Palisades Nuclear Plant - Plant - Draft Request for Additional Information: Palisades Operating TS License Amendment Request - June 6, 2024 ML24187A1332024-07-0505 July 2024 LTR-24-0069 Emailed Response Regarding Palisades Restart Project ML24192A1672024-06-28028 June 2024 Restart - NRC Request for Additional Information - EP ORO Coordination - June 28, 2024 ML24192A1472024-06-28028 June 2024 Email - Palisades Nuclear Plant - Draft Request for Additional Information: Palisades Administrative TS License Amendment Request - June 28, 2024 ML24248A0562024-06-27027 June 2024 Restart La Docs - Draft Letter in Support of Draft RAIs and Draft Environmental Regulatory Audit Plan ML24135A3542024-05-20020 May 2024 NRC Response to Jody Flynn of Michigan Regarding Statements Made About Holtec in the April 25, 2024 Peekskill Herald Article: Holtec Playing Fast and Loose with Taxpayers Money by Tina Volz-Bongar (Docket 50-255) ML24141A0862024-05-16016 May 2024 Notification of NRC Activities Regarding Palisades Restart ML24170A8812024-05-15015 May 2024 NRR E-mail Capture - Post Acceptance/Abeyance Process for the 10 CFR 2.206 Petition on Palisades Misuse of Decommissioning Trust Fund ML24032A2442024-02-0101 February 2024 OEDO-24-00011 - 10 CFR 2.206 Petition Holtec Misuse Decommissioning Fund- Email to Petitioner ML24005A1262024-01-0505 January 2024 Permanently Defueled Emergency Plan Implementation Notification ML23055A1532023-02-24024 February 2023 Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22343A1902022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 140.11 (a)(4) – Primary and Secondary Liability Insurance ML22343A2282022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance ML22284A0502022-10-0707 October 2022 Acceptance Review: License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22227A0092022-08-12012 August 2022 Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme (L-2022-LLA-0099) ML22227A0082022-08-12012 August 2022 Acceptance Review: Exemption Request from 10CFR50.47(b), 10 CFR 50.47(c)(2), and 10 CFR Part 50, Appendix E, Section IV ML22179A0752022-06-28028 June 2022 E-mail from Entergy Dated June 28, 2022, Notification of Palisades and Big Rock Point License Transfer (EPIDs L-2022-LLM-0002 and L-2020-LLM-0003) ML22159A2672022-06-0202 June 2022 Answers to Your Questions on Palisades ML22159A2652022-05-0303 May 2022 Questions Asked at Palisades Plant Performance Public Meeting April 26, 2022 ML21328A0062021-11-18018 November 2021 NRR E-mail Capture - (External_Sender) State of Michigan Response - Palisades Nuclear Plant and Big Rock Point Plant - Application for Order Consenting to Transfers of Licenses and Conforming License Amendments ML22208A1052021-11-16016 November 2021 NRR E-mail Capture - (External_Sender) State of Michigan Response - Palisades - Preparation for Issuance of Final Environmental Assessment and Finding of No Significant Impact Holtec Exemption Request to Use Dtf ML21309A5152021-11-0505 November 2021 NRR E-mail Capture - Palisades Nuclear Plant - Preparation for Issuance of Final Environmental Assessment and Finding of No Significant Impact Holtec Exemption Request to Use Dtf ML21309A2982021-11-0505 November 2021 NRR E-mail Capture - Palisades Nuclear Plant and Big Rock Point Plant - Application for Order Consenting to Transfers of Licenses and Conforming License Amendments ML21209A9802021-07-28028 July 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Requested Licensing Action, Rescission of Interim Compensatory Measure from Order EA-02-026 ML21189A2462021-07-0606 July 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Requested Licensing Action, Proposed Partial Exemption from Record Retention Requirements ML21189A0432021-07-0606 July 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Requested Licensing Action, Permanently Defueled Technical Specifications 2024-09-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24304A8572024-10-29029 October 2024 Draft Request for Additional Information: Palisades Operating Final Safety Analysis Report ML24295A3622024-10-21021 October 2024 Request for Additional Information Quality Assurance Program to Support License Transfer Request ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24192A0012024-07-0606 July 2024 (E-Mail) Palisades Nuclear Plant - Plant - Draft Request for Additional Information: Palisades Operating TS License Amendment Request - June 6, 2024 ML24192A1672024-06-28028 June 2024 Restart - NRC Request for Additional Information - EP ORO Coordination - June 28, 2024 ML24192A1472024-06-28028 June 2024 Email - Palisades Nuclear Plant - Draft Request for Additional Information: Palisades Administrative TS License Amendment Request - June 28, 2024 ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information ML23055A1542023-02-24024 February 2023 Attachment: Request for Additional Information on the Palisades PSDAR ML22292A2582022-10-31031 October 2022 PDEP-EAL Amendment RAI ML22102A2482022-04-14014 April 2022 Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML21274A4172021-10-0505 October 2021 Request for Information for an NRC Triennial Heat Exchanger/Sink Performance Inspection and Request for Information Inspection Report 05000255/2021004 ML21028A0552021-01-27027 January 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of License Transfer Application ML21028A4092021-01-27027 January 2021 NRR E-mail Capture - Palisades Nuclear Plant - Acceptance of Holtec Exemption Request from 10CFR50.82(a)(8)(i)(A) and 10CFR50.75(h)(1)(iv) ML20272A0112020-09-26026 September 2020 Request for Additional Information - Palisades Relief Request RR 5-8 (Proposed Alternative) for Reactor Pressure Vessel Head Penetration Repairs ML20133K0562020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML19357A2752019-12-23023 December 2019 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000255/2020011 ML19226A2932019-08-14014 August 2019 NRR E-mail Capture - Request for Additional Information Re License Amendment Request to Adopt TSTF-425, Revision 3 for the Palisades Nuclear Plant ML19226A2922019-08-0505 August 2019 NRR E-mail Capture - Draft Request for Additional Information for Palisades License Amendment Request to Adopt TSTF-425 ML19122A4852019-04-29029 April 2019 NRR E-mail Capture - Request for Additional Information for Palisades License Amendment Request to Revise License Conditions Related to NFPA 805 Modifications ML19009A5392019-01-0909 January 2019 NRR E-mail Capture - Request for Additional Information for Palisades License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement 3.3.5.2a ML19009A5382018-12-12012 December 2018 NRR E-mail Capture - Draft Request for Additional Information for Palisades License Amendment Request to Revise Emergency Diesel Generator Degraded Voltage Surveillance Requirement 3.3.5.2a ML18337A1382018-11-30030 November 2018 NRR E-mail Capture - Request for Additional Information Related to Palisades Relief Request Number RR 5-7 ML18337A1402018-11-29029 November 2018 NRR E-mail Capture - Draft Request for Additional Information Related to Palisades Relief Request 5-7 ML18309A1342018-11-0808 November 2018 Supplemental Information Needed for Acceptance or Requested Licensing Action Amendment Request to Revise Technical Specifications to Adopt TSTF-425, Revision 3 ML18094B0922018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59) ML18081A2962018-03-22022 March 2018 NRR E-mail Capture - Palisades Nuclear Plant - Request for Additional Information Regarding Proposed Changes to Site Emergency Plan for Permanently Defueled Condition (CAC MG0198: EPID L-2017-LLA-0305) ML18059A8202018-02-28028 February 2018 NRR E-mail Capture - Palisades Nuclear Plant - Request for Additional Information Regarding Proposed Alternative for Relevant Condition ML17335A1042017-11-30030 November 2017 NRR E-mail Capture - Palisades Nuclear Plant - RAI Regarding Proposed Changes to Administrative Controls Section of the Technical Specifications for Permanently Defueled Condition (CAC MG0021; EPID L-2017-LLA-0266) ML17118A3312017-04-18018 April 2017 E-Mailed Request for Information Dated 04/18/17 for Palisades Nuclear Power Station, Unit 1, Inservice Inspection - Part a Items ML17118A3342017-04-18018 April 2017 E-Mailed Request for Information Dated 04/18/2017 for Palisades Nuclear Power Station, Unit 1, Inservice Inspection - Part B Items (Exf) ML17072A2752017-03-10010 March 2017 NRR E-mail Capture - Palisades Nuclear Plant - Final Request for Additional Information Regarding Relief Request No. RR 4-25 ML16238A0302016-08-29029 August 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action Control Rod Drive Exercise Surveillance ML16130A0762016-05-11011 May 2016 Request for Additional Information Regarding the License Amendment Request for Implementation of an Alternative Repair Criterion on the Steam Generator Tubes ML16013A0642016-01-13013 January 2016 NRR E-mail Capture - Request for Additional Information Entergy CNRO-2015-00023 - Revision to Entergy Quality Assurance Program Manual (Fleet Submittal CAC Nos. MF7086-MF7097) ML15341A1662015-12-0707 December 2015 NRR E-mail Capture - Entergy Fleet RR-EN-15-1, Request for Additional Information (CACs MF6341-MF6349) ML15258A2432015-09-0101 September 2015 NRC Supplement to NRC Letter - Notification of NRC Inspection and Request for Information Dated May 1, 2015 - Palisades Nuclear Plant ML15149A2462015-05-28028 May 2015 Information Request to Support NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML15072A2542015-03-19019 March 2015 Request for Additional Information Regarding the License Amendment Request to Implement 10 CFR 50.61a CNRO-2015-00008, Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company2015-02-18018 February 2015 Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company ML15022A1382015-01-22022 January 2015 E-Mail - Palisades Request for Information ML15016A1842015-01-20020 January 2015 Request for Additional Information Regarding the License Amendment Request to Implement 10 CFR 50.61a ML15012A3052015-01-15015 January 2015 Request for Additional Information Regarding the License Amendment Request for an Equivalent Margin Analysis Completed in Accordance with 10 CFR 50, Appendix G ML14318A4002014-12-17017 December 2014 Vermont Yankee Nuclear and Big Rock Point - Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company (Tac Nos. MF3218 - MF3221) ML14157A3642014-06-0505 June 2014 CDBI Request for Information ML13353A0422013-12-16016 December 2013 NRR E-mail Capture - Request for Additional Information - Palisades - Proposed Revision to Palisades Site Emergency Plan (SEP) Emergency Response Organization (ERO) MF2321 ML13312A4232013-11-26026 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13179A4622013-07-0505 July 2013 Entergy Nuclear Operations, Inc., Decommissioning Funding Status Report Request for Additional Information Regarding the Decommissioning Funding Status Report ML13051A7772013-02-19019 February 2013 Request for Additional Information, 2012 SG Inspection Report ML12314A4222012-11-0808 November 2012 ME8074 - Request for Additional Information Regarding Replacement of Spent Fuel Pool Region I Storage Racks ML12278A3862012-10-0404 October 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford, Request for Additional Information, Round 2, Amendment Request to Revise QA Program Manual and Staff Qualification TSs 2024-09-20
[Table view] |
Text
From: Justin Poole (He/Him)
To: James Miksa Cc: Michael Schultheis; Ngola Otto
Subject:
Request for Additional Information RE: Quality Assurance Program to Support License Transfer Request Date: Monday, October 21, 2024 1:04:00 PM Attachments: RAI-10281-R1-Final.pdf
- Jim,
By letter dated December 6, 2023, (Agencywide Document Access and Management System (ADAMS) Accession No. ML23340A161), Holtec Decommissioning International, LLC (HDI), on behalf of Holtec Palisades, LLC, Palisades Energy, LLC, and itself, submitted an application for an order approving the transfer of the license and conforming amendment regarding Palisades Nuclear Plant and its associated independent spent fuel storage facility to the U.S. Nuclear Regulatory Commission (NRC). By letter dated May23,2024, (ML24144A106), HDI supplemented the application with the Palisades Energy, LLC Quality Assurance Program Manual (QAPM), Revision 0, (hereafter referred to as Palisades QAPM).
On August 23, 2024, the NRC staff sent the licensee DRAFT RAIs to ensure that the questions are understandable, the regulatory basis is clear, there is no proprietary information contained in the RAIs, and to determine if the information was previously docketed. On Sept 12, 2024, the NRC and the licensee held a clarification call to discuss the DRAFT RAIs. During the call, the licensee requested a response date of 30 days from the date of this email. The NRC staff informed the licensee that this timeframe is acceptable. Following the call, during a review by the Office of General Council, an additional subpart to the question was add (subpart h). On October 10, 2024, a draft of subpart h was shared with the licensee. On October 21, 2024, the license stated that no clarification call was needed to discuss subpart h. Other than the addition of subpart h, no other changes were made to the DRAFT version sent on August 23, 2024. The attached is the final version of the RAIs. These RAIs will be put in ADAMS as a publicly available document.
Justin C. Poole Project Manager Palisades Restart NRR/DORL/LPL 3 U.S. Nuclear Regulatory Commission (301)415-2048
REQUEST FOR ADDITIONAL INFORM ATION BY THE OFFICE O F NUCLEAR REACTOR REGULATION PALISADES NUCLEAR PLANT LICENSE TRANSFER AS PART OF RESTART EFFORT HOLTEC DECOMMISSIONING INTERNATIONAL, LLC DOCKET NO. 50- 255
Questi on 1
B y letter dat ed Dece mber 6, 20 23, (A gencywide Doc umen t A ccess and Mana geme nt S ystem (A DA MS ) A ccession No. ML23340A161), Holt ec Decom missioning I nter nation al, LLC (HDI ), on behalf of Holtec P alisades, LLC, P alisad es E nerg y, LLC, and its elf, sub mitted an ap plication f or an ord er a pprovin g the trans fer o f the lice nse an d conf ormin g ame ndm ent r egar ding P alisades Nuclear P lant a nd its ass ociated i ndepe nden t spent fuel sto rag e facility to t he U.S. Nuclea r Regulatory Commissio n (NRC). B y lett er da ted M ay 23, 2024, (M L241 44A106), HDI suppleme nted t he ap plication with the P alisad es E nerg y, L LC Quality A ssura nce P rog ram Manual (QA P M), Revision 0, (h erea fter refe rred to as P alisad es QA P M).
The NRC staff r eviewed t he info rmati on pr esente d in th e P alisades QA P M a gainst t he qu ality assuranc e (QA ) r equir emen ts in A ppen dix B Quality A ssura nce Crit eria fo r Nuclea r P ower P lants and Fuel Rep rocessing P lants, t o Title 10 of t he Code of F eder al Regulati ons (10 CFR)
P art 50, D omestic Licensing of P rod uction a nd Utilization Facilities, in acco rdance with the review guid ance in NURE G-0 800, S tanda rd Review P lan (S RP ) for t he Review of S afety A nalysis Reports f or Nuclea r P ower P lants : LWR E dition, S ection 17.3, Quality Assur ance P rogram D escriptio n, Revision 0. B ased on this review, th e NRC staff re quests a ddition al informati on, as docum ented below, to comple te its r eview.
Criterion I, Or ganizatio n, o f A ppendix B to 10 CFR P a rt 50 req uires, in part, that the applicant shall be r esponsible for t he est ablishme nt an d execu tion of the Q uality A ssurance P rogr am (QA P )The a utho rity and duties o f pe rson a nd or ganizati ons pe rfor m ing ac tivities affecting the safety-r elated functions of S S Cs shall be cle arly est ablished and d elineat ed in writin g. The persons and o rganiz ations p erfo rming QA fu nctions s hall have s ufficient au thority and organiza tional f reedo m to id entify q uality pr oblems; to initiat e, rec omm end, o r pr ovide sol utions; and to v erify impl ement ation o f solutio ns. Thes e pers ons an d or ganizatio ns pe rfor ming q uality assuranc e functio ns shall r epor t to a man agem ent level s o that the requi red a uthority and organiza tional f reedom, inclu ding sufficient indep ende nce fr om cost and sch edule w hen opposed to saf ety consid eratio ns, ar e pr ovided.
S RP S ection 17.3, S u bsection II, S RP A ccepta nce Crite ria, Item A.2 s pecifies acce ptanc e criteria to meet the requi reme nts of Crit erion I of A ppe ndix B to 1 0 CFR P art 50. It em A.2 of this S RP section includes the f ollowing acce ptanc e crite ria:
- Item a. st ates, in part, that Th e QA P D is to cont ain an orga nizational descripti on th at address es the orga nizational s tructu re, f unction al resp onsibilities, levels of aut horit y, an d interfaces. The o rganiz ational descriptio n is to incl ude th e onsit e and offsite or ganizatio nal elements t hat f unction unde r the c ognizanc e of t he Q A pro gra m.
- Item b. st ates, in part, that, T here is to be indep ende nce betw een p ersons and organiza tions exec uting p erfo rma nce activities and t hose ex ecuting v erificatio n and s elf-assessment activities.
1
- Item c. sta tes, th at The p erson filling the most s enior-level ma nage ment position is responsibl e for i mplem enting t he Q A policy a nd pr ogr am.
- Item d. st ates, in part, that A mana geme nt positio n, in which the responsi bility for c arryin g out the s elf-assess ment function, includin g inde pende nt revi ew-gr oup ac tivities, audits, and other in depe ndent assessm ents r esides, is to be es tablished. The perso n filling this position is to: (1) have s ufficient au thority and o rga nizational f reed om to imple ment assi gned responsibilities, [and] (2) re port at a mana geme nt level sufficien tly high t o ensu re th at cost and sche dule consi derati ons do not u nduly infl uence decision making.
S ection A.2.a, pa ragr aph (1) of the P alisa des QA P M stat es, The Holtec P residen t is responsibl e for overall c orpo rate policy and provid es exec utive dir ection a nd gui dance f or t he corpor ation as well as pr omulg ates co rpor ate p olicy thro ugh t he Com pany s senio r man age ment staff. This sectio n also st ates th at respo nsibility for developin g, impl ementi ng, an d verifyi ng execution of the Quality A ssura nce P rog ram is delega ted to the chi ef nucle ar officer, the highest-lev el nuclea r exec utive, a nd aut hority f or d evelopin g and verifying executio n of t he progr am to the ex ecutive respo nsible fo r nuclea r ove rsight.
S ection A.2.a, pa ragr aph (2) of the P alisa des QA P M stat es, The P resid ent o f Nuclear Generati on an d Decom missioning is resp onsible fo r pr oviding t op-lev el directio n fo r the s afe and relia ble op eratio n and maint enanc e of th e P alisades sit e. The P r esident of Nuclea r Generati on an d Decom missioning provid es guid ance with rega rds to comp any Q A policy. This position is r esponsible for providin g engi neerin g servic es, nucle ar saf ety, and o pera tions support.
S ection A.2.a, pa ragr aph (3) of the P alisa des QA P M stat es, in pa rt, th at The f ollowing executives r epor t to th e P reside nt of Nucl ear G ener ation a nd Deco mmissionin g and provid e govern ance a nd ove rsight in reg ards t o imple mentin g comp any Qu ality A ssurance policy.
- A Chief Nucle ar Officer (CNO), t he hig hest level nuclear executiv e officer, is responsi ble for safe and reliable nuclea r op eratio ns and ope rations s uppo rt. A dditionall y, this p osition is responsibl e for i mplem enting Q uality A ssuranc e policies, goals, a nd obj ectives an d the implement ation of all activities associate d with the safe and r eliable o pera tion of the P alisades site. The following repo rts to t his chief nuclear officer:
- P alisades E nerg y, LLC Vice P reside nt
- Nuclear S afety R eview B oard (NS RB )
- The exec utive r esponsibl e for Licensing /Regulat ory A ssura nce is res ponsible for Q uality A ssurance a nd esta blishes th e policies, goals, a nd obj ectives of t he Qu ality A ssurance policy; provid es guid ance a nd inte rpr etation for im pleme nting t he com pany Q uality A ssurance P olicy; an d is res ponsible for g overn ance and im plemen tation of the Quality A ssurance p rogr am in accord ance with regul atory requi reme nts. The following P alisad es E nergy, LLC Quality A ssur ance p osition r epor ts to t his executive :
- P alisades E nerg y, LLC Q uality A ssuranc e Man age r is resp onsible f or Q A activities a nd is indepen dent o f pro duction. This positi on pr ovides ov erall di rection f or th e imple ment ation of the Q A pr ogra m an d is resp onsible f or Q A gove rna nce. This p osition h as authority and responsibility f or est ablishing, c ontr olling, an d verifyin g imple ment ation a nd ad equacy of the QA prog ram as desc ribed in this QA P M, includin g activities relate d to ve ndor quality.
2 This positio n has t he aut hority t o S top Work a nd r esponsibility t o escala te ma tters directly to t he hig hest level nuclea r executiv e officer wh en ne eded.
S ection A.2.b of t he P alisades QA P M states, The following in tegr ated P alisad es E nerg y, L LC manag ement positions describ e the typical site QA P M fu nctional respo nsibilities, which may be delegate d to o thers as esta blished in this doc ument. This sec tion identifies th e P alisades E nergy, LLC S ite Vice P r esident as the position t hat is r esponsi ble for over all plant nuclear safety at P alisad es and is resp onsible f or est ablishing t he policies, goals, and o bjectives a nd th e implement ation of the QPA M at P alisad es. This secti on also st ates a man agem ent p osition on site for Qu ality A ssurance who has over all auth ority an d res ponsibility fo r esta blishing, controlling, and v erifying t he impl emen tation, and adequ acy of t he Q A pro gra m as desc ribed in the QA P M rep orts di rectly to the co rpor ate manag emen t positio n resp onsible f or licensing/re gulato ry assur ance (offsite).
The NRC staff r equests the applicant to clarify how th e accept ance c riteria i n S RP S ection 1 7.3, S ubsection II, S RP A cceptance Criteria, Ite m A.2.a, b, c, an d d a re a ddress ed by t he P alisades QA P M. S pecifically:
- a. Given that the CNO r epor ts to th e P reside nt of Nucl ear G ener ation a nd Decommissionin g and the P resi dent of Nuclea r Gene ratio n and D ecommissio ning is responsibl e for providin g (1 ) top-level di rection f or th e safe and reliable oper ation o f the P alisades site, an d (2 ) guid ance with rega rds to comp any Q A policy, cl arify h ow the CNO is the high est level n uclear executive officer r esponsibl e for s afe a nd r eliable nuclear oper ations.
- b. Given that both CNO and th e exec utive res ponsible for Licensing/Re gulato ry A ssuranc e have the resp onsibility for implem enting the P alisad es QA policy and QA prog ram, w hich of these position withi n the HDI or P alisades E nerg y, LLC orga nization has the highes t authority and respo nsibility for i mplem enting t he Q A policy a nd pr ogra m?
- c. The P alisades E nergy LLC S ite Vice P r esident, who r eports to th e CNO, is res ponsible for esta blishing th e policies, goals, a nd obj ectives an d the i mplem entatio n of t he QA P M at P alisades. Howev er, a se par ate m anage ment position respo nsible fo r QA, who reports to th e execu tive res ponsible for Lic ensing/Re gulato ry A ssurance, is res ponsible for esta blishing a nd verifyi ng th e imple mentati on an d ade quacy of the QA p rogr am a nd has the autho rity to st op work at P alisades. S ince bot h the P alisad es E ner gy LLC S ite Vice P resident and t he m anag ement position resp onsible f or Q A are resp onsible f or implementi ng th e QA prog ram on site, cl arify th e differe nces be tween t he fu nctions perfor med by thes e two positi ons.
- d. Clarify whethe r the P alisades E ner gy, LLC S ite Vice P r esident has th e auth ority t o stop work given t hat this position is respo nsible fo r the i mplem entatio n of t he QA P M at P alisades.
- e. Given that the o n-site manag eme nt positio n resp onsible f or Q A has t he a bility to escalate m atters directly t o the highest level nucle ar ex ecutive office r (i.e., CNO) whe n needed, clarify why this positio n re port t o the executive resp onsible fo r Licensing/Reg ulatory A ssu rance.
3
- f. Clarify what d oes typical site QA P M fu nctional respo nsibilities me an in S ectio n A.2.b of the P alisades QA P M.
- g. Clarify use of the t erm the Co mpany in th e QA P M. Does the Co mpa ny r efer t o HDI, P alisades E nerg y, LLC or Holtec P alisa des, L LC?
- h. P lease clarify th e QA P M to stat e which p ositions in t he QA P M, if a ny, a re n ot within t he P alisades E nerg y, LLC, orga nization. A lso, if ther e are any suc h positio ns, pleas e explain how t his re mains consist ent with the t ransfe r re quest's pro posal th at P alisades E nergy, LLC, be the sol e license h older wit h licensed ope ration al auth ority fo r P alisades Nuclear P lant.
4