L-19-024, Unit 2 - Emergency Plan Implementing Procedures Revision
ML19066A036 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 03/07/2019 |
From: | Anthony Williams Tennessee Valley Authority |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
WBL-19-024 | |
Download: ML19066A036 (2) | |
Similar Documents at Watts Bar | |
---|---|
Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARCNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024
[Table view]Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions WBL-24-043, Emergency Plan Implementing Procedure Revisions2024-09-16016 September 2024 Emergency Plan Implementing Procedure Revisions WBL-24-030, Emergency Plan Implementing Procedure Revisions2024-07-17017 July 2024 Emergency Plan Implementing Procedure Revisions WBL-24-028, Emergency Plan Implementing Procedure Revisions2024-07-0202 July 2024 Emergency Plan Implementing Procedure Revisions WBL-24-025, Emergency Plan Implementing Procedure Revisions. Includes EPIP-7, Revision 43, Activation and Operation of the Operations Support Center (OSC)2024-05-23023 May 2024 Emergency Plan Implementing Procedure Revisions. Includes EPIP-7, Revision 43, Activation and Operation of the Operations Support Center (OSC) CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions WBL-24-016, Rev. 60 to Radiological Emergency Plan EPIP 1, Emergency Plan Classification Logic2024-04-11011 April 2024 Rev. 60 to Radiological Emergency Plan EPIP 1, Emergency Plan Classification Logic WBL-24-018, Rev. 30 to Radiological Emergency Plan EPIP 14, Radiological Control Response2024-04-11011 April 2024 Rev. 30 to Radiological Emergency Plan EPIP 14, Radiological Control Response ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions WBL-24-003, Emergency Plan Implementing Procedure Revision. Includes EPIP-6, Revision 58, Activation and Operation of the Technical Support Center (TSC)2024-01-30030 January 2024 Emergency Plan Implementing Procedure Revision. Includes EPIP-6, Revision 58, Activation and Operation of the Technical Support Center (TSC) CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions WBL-23-058, Emergency Plan Implementing Procedure Revision. Includes EPIP-5, Revision 63, General Emergency2023-12-19019 December 2023 Emergency Plan Implementing Procedure Revision. Includes EPIP-5, Revision 63, General Emergency CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 WBL-23-033, Emergency Plan Implementing Procedure Revision. Includes EPIP 1, Revision 59, Emergency Plan Classification Logic2023-07-13013 July 2023 Emergency Plan Implementing Procedure Revision. Includes EPIP 1, Revision 59, Emergency Plan Classification Logic CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions WBL-23-015, Emergency Plan Implementing Procedure Revision2023-03-21021 March 2023 Emergency Plan Implementing Procedure Revision CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions WBL-23-003, Emergency Plan Implementing Procedure Revision. Includes EPIP-16, Revision 25, Termination of the Emergency and Recovery2023-01-12012 January 2023 Emergency Plan Implementing Procedure Revision. Includes EPIP-16, Revision 25, Termination of the Emergency and Recovery WBL-23-001, Emergency Plan Implementing Procedure Revision. Includes EPIP-1, Revision 57, Emergency Plan Classification Logic2023-01-10010 January 2023 Emergency Plan Implementing Procedure Revision. Includes EPIP-1, Revision 57, Emergency Plan Classification Logic CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions WBL-22-068, Submittal of Emergency Plan Implementing Procedure Revision2022-12-12012 December 2022 Submittal of Emergency Plan Implementing Procedure Revision CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio WBL-22-062, Emergency Plan Implementing Procedure Revision. Includes EPIP-13, Revision 34, Initial Dose Assessment for Radiological Emeregencies2022-11-0101 November 2022 Emergency Plan Implementing Procedure Revision. Includes EPIP-13, Revision 34, Initial Dose Assessment for Radiological Emeregencies WBL-22-061, Unit 2 - Emergency Plan Implementing Procedure Revisions2022-10-17017 October 2022 Unit 2 - Emergency Plan Implementing Procedure Revisions WBL-22-060, Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 56, Activation and Operation of the Technical Support Center (TSC)2022-10-17017 October 2022 Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 56, Activation and Operation of the Technical Support Center (TSC) CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions WBL-22-037, Emergency Plan Implementing Procedure Revision. Including EPIP-13, Revision 33, Initial Dose Assessment for Radiological Emergencies2022-07-14014 July 2022 Emergency Plan Implementing Procedure Revision. Including EPIP-13, Revision 33, Initial Dose Assessment for Radiological Emergencies WBL-22-033, Emergency Plan Implementing Procedure Revisions2022-06-0101 June 2022 Emergency Plan Implementing Procedure Revisions CNL-22-047, Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2022-05-23023 May 2022 Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions WBL-22-030, Emergency Plan Implementing Procedure Revision2022-05-18018 May 2022 Emergency Plan Implementing Procedure Revision CNL-22-046, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan.2022-04-28028 April 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan. WBL-22-024, Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP 14, Revision 292022-04-27027 April 2022 Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP 14, Revision 29 CNL-22-050, Brown Ferry, Sequoyah and Watts Bar - Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-04-18018 April 2022 Brown Ferry, Sequoyah and Watts Bar - Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-031, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-03-22022 March 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-21-096, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing2021-12-17017 December 2021 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing WBL-21-054, Unit 2 - Emergency Plan Implementing Procedure Revision2021-12-0909 December 2021 Unit 2 - Emergency Plan Implementing Procedure Revision CNL-21-088, Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 242021-11-12012 November 2021 Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 24 CNL-21-087, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revisions2021-11-0303 November 2021 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revisions WBL-21-044, Emergency Plan Implementing Procedure Revision2021-09-23023 September 2021 Emergency Plan Implementing Procedure Revision CNL-21-071, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2021-08-13013 August 2021 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML21223A0062021-08-11011 August 2021 Emergency Plan Implementing Procedure Revision. Includes EPIP-2, Revision 45, Notification of Unusual Event WBL-21-035, Emergency Plan Implementing Procedure EPIP-12, Revision 51, Emergency Equipment and Supplies2021-07-13013 July 2021 Emergency Plan Implementing Procedure EPIP-12, Revision 51, Emergency Equipment and Supplies WBL-21-034, Emergency Plan Implementing Procedure Revision2021-07-0101 July 2021 Emergency Plan Implementing Procedure Revision WBL-21-011, Unit 2 - Emergency Plan Implementing Procedure Revisions2021-03-0909 March 2021 Unit 2 - Emergency Plan Implementing Procedure Revisions WBL-21-003, Unit 2 - Emergency Plan Implementing Procedure Revision2021-01-26026 January 2021 Unit 2 - Emergency Plan Implementing Procedure Revision WBL-20-061, Unit 2 - Emergency Plan Implementing Procedure Revision2020-11-23023 November 2020 Unit 2 - Emergency Plan Implementing Procedure Revision WBL-20-057, Unit 2 - Emergency Plan Implementing Procedure Revision2020-11-0505 November 2020 Unit 2 - Emergency Plan Implementing Procedure Revision 2024-09-16 Category:Letter type:L MONTHYEARL-20-006, Unit 2, Emergency Plan Implementing Procedure Revision2020-02-10010 February 2020
[Table view]Unit 2, Emergency Plan Implementing Procedure Revision L-12-001, Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System2019-12-26026 December 2019 Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System L-19-061, Unit 2 - Emergency Plan Implementing Procedure Revision2019-12-16016 December 2019 Unit 2 - Emergency Plan Implementing Procedure Revision L-19-058, Statement of Payment of Civil Penalty2019-12-11011 December 2019 Statement of Payment of Civil Penalty L-19-054, Unit 2 - Emergency Plan Implementing Procedure Revision2019-12-0505 December 2019 Unit 2 - Emergency Plan Implementing Procedure Revision L-19-046, Notification of Readiness for NRC Independent Review to Confirm Chilling Effect Letter and Cross-Cutting Issue Closure Criteria Have Been Met2019-10-0303 October 2019 Notification of Readiness for NRC Independent Review to Confirm Chilling Effect Letter and Cross-Cutting Issue Closure Criteria Have Been Met L-19-052, Revision 47 to Emergency Plan Implementing Procedure EPIP 12, Emergency Equipment and Supplies2019-09-30030 September 2019 Revision 47 to Emergency Plan Implementing Procedure EPIP 12, Emergency Equipment and Supplies L-19-048, Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-0422019-09-12012 September 2019 Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-042 L-19-041, Cycle 2 Steam Generator Tube Inspection Report2019-08-27027 August 2019 Cycle 2 Steam Generator Tube Inspection Report L-19-045, American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 Operation2019-08-14014 August 2019 American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 Operation L-19-044, Unit 2 - Forward Emergency Plan Implementing Procedure Revisions2019-08-0808 August 2019 Unit 2 - Forward Emergency Plan Implementing Procedure Revisions L-19-036, Notification of Readiness for NRC Inspection Procedure 95001 Inspection2019-06-20020 June 2019 Notification of Readiness for NRC Inspection Procedure 95001 Inspection L-19-034, Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report2019-06-18018 June 2019 Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations L-19-016, Annual Radiological Environmental Operating Report - 20182019-05-15015 May 2019 Annual Radiological Environmental Operating Report - 2018 L-19-029, Submittal of Revision 0 of Cycle 3 Core Operating Limits Report2019-04-24024 April 2019 Submittal of Revision 0 of Cycle 3 Core Operating Limits Report L-19-015, Annual Non-Radiological Environmental Operating Report - 20182019-04-11011 April 2019 Annual Non-Radiological Environmental Operating Report - 2018 L-19-026, Revised Pressure and Temperature Limits Report (PTLR)2019-04-0404 April 2019 Revised Pressure and Temperature Limits Report (PTLR) L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual2019-03-19019 March 2019 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual L-19-024, Unit 2 - Emergency Plan Implementing Procedures Revision2019-03-0707 March 2019 Unit 2 - Emergency Plan Implementing Procedures Revision L-19-019, Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 22019-03-0707 March 2019 Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 2 L-19-011, Plant, Unit 1 - Revision 1 of the Cycle 16 Core Operating Limits Report (COLR)2019-01-29029 January 2019 Plant, Unit 1 - Revision 1 of the Cycle 16 Core Operating Limits Report (COLR) L-19-008, American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 Operation2019-01-24024 January 2019 American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 Operation L-18-001, Notification of Readiness for NRC Inspection Procedure 95001 Inspection2018-11-26026 November 2018 Notification of Readiness for NRC Inspection Procedure 95001 Inspection L-04-001, Completion of Action Required in Response to NRC Bulletin 2004-01: Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors2018-01-25025 January 2018 Completion of Action Required in Response to NRC Bulletin 2004-01: Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors L-11-001, Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies.2015-09-24024 September 2015 Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies. L-11-011, Transmittal of Response to NRC Bulletin 2011-01, Mitigating Strategies.2015-06-29029 June 2015 Transmittal of Response to NRC Bulletin 2011-01, Mitigating Strategies. L-88-017, Response Clarification to Generic Letter 88-0172013-08-13013 August 2013 Response Clarification to Generic Letter 88-017 L-03-004, Tennessee Valley Authority Response to Nuclear Regulatory Commission Bulletin 2003-04, Rebaselining of Data in the Nuclear Materials Management and Safeguards System, Dated October 8, 20032003-12-18018 December 2003 Tennessee Valley Authority Response to Nuclear Regulatory Commission Bulletin 2003-04, Rebaselining of Data in the Nuclear Materials Management and Safeguards System, Dated October 8, 2003 2020-02-10 |
Text
Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 wBL-19-024 March 7,2019 10 CFR 50, Appendix E, Section V 10 CFR 50 54(qX5) 10 cFR 72.44(f)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 & Unit 2 Facility Operating License No. NPF-90, NPF-96 NRC Docket No. 50-390, 50-391
Subject:
Emergency PIan lmplementing Procedures Revision ln accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, 10 CFR 50.5a(q)(5), and 10 CFR72.44(f), the following Emergency Plan lmplementing Procedures (EPIP) have been revised with administrative and editorial changes:
EPIP Revision Title Effective Date 3 0045 AIert 02t25t2019 4 0043 Site Area Emergency 02125t2019 The above referenced revisions continue to comply with regulations and there is no reduction in effectiveness of the plan. The revisions were administrative in nature, to add words, "(USE ONLY ONE lC DESIGNATOR)" to Attachment A, Line 3, in both procedures.
There are no regulatory commitments in this letter. Please direct all questions concerning this matter to Mike Phillips, Acting Emergency Preparedness Manager, al (423) 365-1964.
-pectfully, Anthony L. Williams Site Vice President Watts Bar Nuclear Plant
U.S. Regulatory Commission March 7, 2019 Page 2 cc: