Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 WBL-19-054 December 5, 2019 10 CFR 50, Appendix E, Section V 10 CFR 50.54(q)(5) 10 CFR 72.44(f)

A TIN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 & Unit 2 Facility Operating License No. NPF-90, NPF-96 NRG Docket No. 50-390, 50-391

Subject:

Emergency Plan Implementing Procedure Revision In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, 10 CFR 50.54(q)(5), and 10 CFR 72.44(f), the following Emergency Plan Implementing Procedure (EPIP) has been revised with administrative and editorial changes:

EPIP Revision Effective Date 7 0040 Activation and Operation of the 11/13/19 Operations Support Center (OSC)

The above referenced revision continues to comply with regulations and there is no reduction in effectiveness of the plan. The revisions were administrative in nature.

There are no regulatory commitments in this letter. Please direct all questions concerning this matter to Mike White, Emergency Preparedness Manager, at (423) 365-3232.


site Vice President Watts Bar Nuclear Plant

U.S. Regulatory Commission WBL-19-054 December 5, 2019 Page 2 cc: NRC Regional Administrator - Region II NRC Senior Resident Inspector