|
---|
Category:Letter type:L
MONTHYEARL-20-006, Unit 2, Emergency Plan Implementing Procedure Revision2020-02-10010 February 2020 Unit 2, Emergency Plan Implementing Procedure Revision L-12-001, Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System2019-12-26026 December 2019 Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System L-19-061, Unit 2 - Emergency Plan Implementing Procedure Revision2019-12-16016 December 2019 Unit 2 - Emergency Plan Implementing Procedure Revision L-19-058, Statement of Payment of Civil Penalty2019-12-11011 December 2019 Statement of Payment of Civil Penalty L-19-054, Unit 2 - Emergency Plan Implementing Procedure Revision2019-12-0505 December 2019 Unit 2 - Emergency Plan Implementing Procedure Revision L-19-046, Notification of Readiness for NRC Independent Review to Confirm Chilling Effect Letter and Cross-Cutting Issue Closure Criteria Have Been Met2019-10-0303 October 2019 Notification of Readiness for NRC Independent Review to Confirm Chilling Effect Letter and Cross-Cutting Issue Closure Criteria Have Been Met L-19-052, Revision 47 to Emergency Plan Implementing Procedure EPIP 12, Emergency Equipment and Supplies2019-09-30030 September 2019 Revision 47 to Emergency Plan Implementing Procedure EPIP 12, Emergency Equipment and Supplies L-19-048, Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-0422019-09-12012 September 2019 Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-042 L-19-041, Cycle 2 Steam Generator Tube Inspection Report2019-08-27027 August 2019 Cycle 2 Steam Generator Tube Inspection Report L-19-045, American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 Operation2019-08-14014 August 2019 American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 Operation L-19-044, Unit 2 - Forward Emergency Plan Implementing Procedure Revisions2019-08-0808 August 2019 Unit 2 - Forward Emergency Plan Implementing Procedure Revisions L-19-036, Notification of Readiness for NRC Inspection Procedure 95001 Inspection2019-06-20020 June 2019 Notification of Readiness for NRC Inspection Procedure 95001 Inspection L-19-034, Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report2019-06-18018 June 2019 Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations L-19-016, Annual Radiological Environmental Operating Report - 20182019-05-15015 May 2019 Annual Radiological Environmental Operating Report - 2018 L-19-029, Submittal of Revision 0 of Cycle 3 Core Operating Limits Report2019-04-24024 April 2019 Submittal of Revision 0 of Cycle 3 Core Operating Limits Report L-19-015, Annual Non-Radiological Environmental Operating Report - 20182019-04-11011 April 2019 Annual Non-Radiological Environmental Operating Report - 2018 L-19-026, Revised Pressure and Temperature Limits Report (PTLR)2019-04-0404 April 2019 Revised Pressure and Temperature Limits Report (PTLR) L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual2019-03-19019 March 2019 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual L-19-024, Unit 2 - Emergency Plan Implementing Procedures Revision2019-03-0707 March 2019 Unit 2 - Emergency Plan Implementing Procedures Revision L-19-019, Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 22019-03-0707 March 2019 Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 2 L-19-011, Plant, Unit 1 - Revision 1 of the Cycle 16 Core Operating Limits Report (COLR)2019-01-29029 January 2019 Plant, Unit 1 - Revision 1 of the Cycle 16 Core Operating Limits Report (COLR) L-19-008, American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 Operation2019-01-24024 January 2019 American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 Operation L-18-001, Notification of Readiness for NRC Inspection Procedure 95001 Inspection2018-11-26026 November 2018 Notification of Readiness for NRC Inspection Procedure 95001 Inspection L-04-001, Completion of Action Required in Response to NRC Bulletin 2004-01: Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors2018-01-25025 January 2018 Completion of Action Required in Response to NRC Bulletin 2004-01: Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors L-11-001, Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies.2015-09-24024 September 2015 Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies. L-11-011, Transmittal of Response to NRC Bulletin 2011-01, Mitigating Strategies.2015-06-29029 June 2015 Transmittal of Response to NRC Bulletin 2011-01, Mitigating Strategies. L-88-017, Response Clarification to Generic Letter 88-0172013-08-13013 August 2013 Response Clarification to Generic Letter 88-017 L-03-004, Tennessee Valley Authority Response to Nuclear Regulatory Commission Bulletin 2003-04, Rebaselining of Data in the Nuclear Materials Management and Safeguards System, Dated October 8, 20032003-12-18018 December 2003 Tennessee Valley Authority Response to Nuclear Regulatory Commission Bulletin 2003-04, Rebaselining of Data in the Nuclear Materials Management and Safeguards System, Dated October 8, 2003 2020-02-10
[Table view] |
Text
Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 WBL-19-054 December 5, 2019 10 CFR 50, Appendix E, Section V 10 CFR 50.54(q)(5) 10 CFR 72.44(f)
A TIN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 & Unit 2 Facility Operating License No. NPF-90, NPF-96 NRG Docket No. 50-390, 50-391
Subject:
Emergency Plan Implementing Procedure Revision In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, 10 CFR 50.54(q)(5), and 10 CFR 72.44(f), the following Emergency Plan Implementing Procedure (EPIP) has been revised with administrative and editorial changes:
EPIP Revision Effective Date 7 0040 Activation and Operation of the 11/13/19 Operations Support Center (OSC)
The above referenced revision continues to comply with regulations and there is no reduction in effectiveness of the plan. The revisions were administrative in nature.
There are no regulatory commitments in this letter. Please direct all questions concerning this matter to Mike White, Emergency Preparedness Manager, at (423) 365-3232.
site Vice President Watts Bar Nuclear Plant
U.S. Regulatory Commission WBL-19-054 December 5, 2019 Page 2 cc: NRC Regional Administrator - Region II NRC Senior Resident Inspector