Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 WBL-20-006 February 10, 2020 10 CFR 50 , Appendix E,Section V 10 CFR 50.54(q)(5) 10 CFR 72.44(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington , D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 & Unit 2 Facility Operating License No. NPF-90, NPF-96 NRC Docket No. 50-390 , 50-391

Subject:

Emergency Plan Implementing Procedure Revision In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, 10 CFR 50.54(q)(5) , and 10 CFR 72.44(f) , the following Emergency Plan Implementing Procedure (EPIP) has been revised with administrative and editorial changes :

EPIP Revision Title Effective Date 2 0042 Notification of Unusual Event 01/14/2020 6 0054 Activation and Operation of the Technical 01/14/2020 Support Center (TSC) 12 0048 Emergency Equipment and Supplies 01/14/2020 16 0024 Termination of the Emergency and 01/09/2020 Recovery The above referenced revisions continue to comply with regulations and there is no reduction in effectiveness of the plans. Details of the revisions are included in Enclosure 1. There are no regulatory commitments in this letter. Please direct all questions concerning this matter to Mike White , Emergency Preparedness Manager, at (423) 365-3232.

nttiony L. Williams IV Site Vice President Watts Bar Nuclear Plant

U.S. Regulatory Commission WBL-20-006 February 10, 2020 Page2 cc:

NRC Regional Administrator - Region II NRC Senior Resident Inspector

Enclosure 1 Description of Revision/Change EPIP-2, Rev 0042

  • Added Note to Appendix G which allows optional use of EPIP-16 for termination.

EPIP-6, Rev 0054

  • Removed reference to O-MA-1 due to procedure being cancelled.

EPIP-12, Rev 0048

  • Removed O-MA-1 from inventories of TSC, OSC and Alternate Facility due to procedure is canceled.
  • Changed title of inventory from Fire Truck to Stretcher Cabinet to align with PM Title.

Also added signature/date blocks for performer and reviewer.

EPIP-16, Rev 0024

  • Removed NOTE discussing non-applicability of this procedure and added it as a sentence in the purpose section and added EPIP-1 as a Performance Reference.

Revised the heading titles in the References Section 2.0 and changed all supplemental material from Appendix to Attachment to align with Writer's Guide.

  • Revised document retention requirements in section 4.0 to align with Writer's Guide and fleet guidance.
  • Updated the locator map in Attachment 3.
  • Moved the NOTE in Attachment 4 to precede the form. Rearranged the sentences within the NOTE to clarify reference to procedure.