Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-20-006, Unit 2, Emergency Plan Implementing Procedure Revision10 February 2020Unit 2, Emergency Plan Implementing Procedure Revision
L-12-001, Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System26 December 2019Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power SystemOpen Phase Condition
Offsite Circuit
L-19-061, Unit 2 - Emergency Plan Implementing Procedure Revision16 December 2019Unit 2 - Emergency Plan Implementing Procedure Revision
L-19-058, Statement of Payment of Civil Penalty11 December 2019Statement of Payment of Civil Penalty
L-19-054, Unit 2 - Emergency Plan Implementing Procedure Revision5 December 2019Unit 2 - Emergency Plan Implementing Procedure Revision
L-19-046, Notification of Readiness for NRC Independent Review to Confirm Chilling Effect Letter and Cross-Cutting Issue Closure Criteria Have Been Met3 October 2019Notification of Readiness for NRC Independent Review to Confirm Chilling Effect Letter and Cross-Cutting Issue Closure Criteria Have Been Met
L-19-052, Revision 47 to Emergency Plan Implementing Procedure EPIP 12, Emergency Equipment and Supplies30 September 2019Revision 47 to Emergency Plan Implementing Procedure EPIP 12, Emergency Equipment and Supplies
L-19-048, Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-04212 September 2019Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-042Unanalyzed Condition
L-19-041, Cycle 2 Steam Generator Tube Inspection Report27 August 2019Cycle 2 Steam Generator Tube Inspection ReportNondestructive Examination
L-19-045, American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 Operation14 August 2019American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 OperationMoisture barrier
Through Wall Leak
L-19-044, Unit 2 - Forward Emergency Plan Implementing Procedure Revisions8 August 2019Unit 2 - Forward Emergency Plan Implementing Procedure Revisions
L-19-036, Notification of Readiness for NRC Inspection Procedure 95001 Inspection20 June 2019Notification of Readiness for NRC Inspection Procedure 95001 Inspection
L-19-034, Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report18 June 2019Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) ReportPost Accident Monitoring
L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations15 May 2019Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations
L-19-016, Annual Radiological Environmental Operating Report - 201815 May 2019Annual Radiological Environmental Operating Report - 2018Annual Radiological Environmental Operating Report
L-19-029, Submittal of Revision 0 of Cycle 3 Core Operating Limits Report24 April 2019Submittal of Revision 0 of Cycle 3 Core Operating Limits ReportShutdown Margin
L-19-015, Annual Non-Radiological Environmental Operating Report - 201811 April 2019Annual Non-Radiological Environmental Operating Report - 2018
L-19-026, Revised Pressure and Temperature Limits Report (PTLR)4 April 2019Revised Pressure and Temperature Limits Report (PTLR)Hydrostatic
Pressure and Temperature Limits Report
L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual19 March 2019Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements ManualSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Missed surveillance
Pressure and Temperature Limits Report
Process Control Program
Fuel cladding
Offsite Circuit
Grace period
Coast down
L-19-024, Unit 2 - Emergency Plan Implementing Procedures Revision7 March 2019Unit 2 - Emergency Plan Implementing Procedures Revision
L-19-019, Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 27 March 2019Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 2Stroke time
L-19-011, Plant, Unit 1 - Revision 1 of the Cycle 16 Core Operating Limits Report (COLR)29 January 2019Plant, Unit 1 - Revision 1 of the Cycle 16 Core Operating Limits Report (COLR)Tritium Producing Burnable Absorber Rods
L-19-008, American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 Operation24 January 2019American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 OperationThrough Wall Leak
L-18-001, Notification of Readiness for NRC Inspection Procedure 95001 Inspection26 November 2018Notification of Readiness for NRC Inspection Procedure 95001 Inspection
L-04-001, Completion of Action Required in Response to NRC Bulletin 2004-01: Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors25 January 2018Completion of Action Required in Response to NRC Bulletin 2004-01: Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water ReactorsVT-2
L-11-001, Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies.24 September 2015Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies.
L-11-011, Transmittal of Response to NRC Bulletin 2011-01, Mitigating Strategies.29 June 2015Transmittal of Response to NRC Bulletin 2011-01, Mitigating Strategies.B.5.b Mitigating Strategies
Earthquake
L-88-017, Response Clarification to Generic Letter 88-01713 August 2013Response Clarification to Generic Letter 88-017
L-03-004, Tennessee Valley Authority Response to Nuclear Regulatory Commission Bulletin 2003-04, Rebaselining of Data in the Nuclear Materials Management and Safeguards System, Dated October 8, 200318 December 2003Tennessee Valley Authority Response to Nuclear Regulatory Commission Bulletin 2003-04, Rebaselining of Data in the Nuclear Materials Management and Safeguards System, Dated October 8, 2003