LER 80-043/03L-0:on 801122,PT-33 Failed to Meet Required Criterion of 0.05 Inches of Water.Caused by Excessive Leakage from 2B Battery Room Door.Battery Room Door Repaired
ML18139A931
Person / Time
Site: Surry Dominion icon.png
Issue date: 12/18/1980
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18139A930 List:
References
LER-80-043-03L-03, LER-80-43-3L-3, NUDOCS 8012230403
Download: ML18139A931 (2)


Text

,C FORM 366 U.S. NUCLEAR REGULATORY COMMISSION 77)

-ICENSEE EVENT REPORT e CONTROL BLOCK: I I I I I I 6IG)

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

IJ Iv IA I8 IP I 8 I 2 101 ° IO I- I oI oI oI o po ! .:- I o I o 1014 Ii Ii I 1 I 1 101 I I 0 8 9 LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58

JN'T I:].

8

=~~~~~ L!J© I o I 5 I o I o Io I 2 I s I 1 101 1 I 1 I 2 I 2 I s Io 60 61 DOCKET NUMBER 68 69 EVENT DATE 1011 12 11 i4 75 1s I s I o 10 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@

CIT] ion November 22, 1980, with Unit No. 2 at 100% power, PT-33 failed to meet tbe required

~ acceptance criterial of 0.05 in. of water. This is contrary to T.S.-3-19A and is re-1 ITD !portable per. T.S.-6.6.2.b(2). The emergency ventilation system was proven operable, therefore the health and safety of the public were not affected. I ill] L I- - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - - - - - - - - '

[ill ITD Im8 9 . 80 SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUSCODE COMPONENT CODE SUSCODE SUSCODE wJ 8 IA I Al@

9 10 L~J@ 12W@ 13lxlxlxlx!xl xi@

11 18 w@

19 W

20 SEQUENTIAL OCCUR REN CE REPORT REVISION 0,.' LER/RO CVENT YEAR REPORT NO. CODE TYPE NO.

~ iG~~~~ I 8 IO I 21

  • 22
  • I I 23 l O I 4 13 1 24 26 I /I 27 Io I3 I 28 29 w

30 l==1 31 l.9-.J 32 ACTION TAKEN FUTURE ACTION EFFECT ON PLANT SHUTDOWN METHOD . HOURS e

(.;:;\ ATTACHMENT SUBMITTED NPRD-4 FORM SUS.

PRIME COMP.

SUPPLIER COMPONENT MANUFACTURER LLJ@w@

33 34

_35W@ LLJ I o I o I a I a I 36 37

  • 40 W*@-

41 b.J(§)

42 ILJ@

43 I z I9 44 19 I 91@

47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @

II§] l The door to 2B battery room had excessive leakage, The battery m.am door was repaired IJJJ fnd PT-33 was performed satisfactorily.

ITIJ ITTI IE]

8 9 80 FACILITY

@ METHOD OF A STATUS  % POWER OTHER STATUS DISCOVERY DISCOVERY DESCRIPTION ~

Cill ~@ I 8 9 10 11 ol o!@I 12 1'3 N/A 44 I lJLJ@I 45 46 Survei JJ ance Testing 80 ACTIVITY CONTENT (.'.;;;\

RELEASED OF RELEASE AMOUNT OF ACTIVITY ~ _LOCATION OF RELEASE @

QI] ~~@I_

8 9 10 11 N/A 44 I 45 NLA 80 PERSONNEL EXPOSURES r::;:;,.

NUMBER ~ TYPE DESCRIPTION QI) 10 jO 10 j(32.i~@)L..-_N_/_A_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____,

8 9 11 12 13 80 PERSONNEL INJURIES Q NUMBER DESCRIPTION~

Cfil 8 jo 9

10 IO 11 l@.______~ N / = A = - - - - - - - - - - - - - - - - - - - - - - - - - - -80' 12 LOSS OF OR DAMAGE TO FACILITY '4J' TYPE DESCRIPTION i.::.:::J

~ ~@I N/A 8 9 10 80 0: ~). 30 PUBLICITY ISSUEDQ DESCRIPTION~

(;";;\

() -01 LJ

-. 0 .3 NRC USE ONLY IT£] LBJ~I N/A I l *1 I I I I I I I I I I80I !;

s 9 10 PREPARER J. L. Wilson cP'HONE (804) 357-3184 68. 69 n

ATTACHMENT 1 SURRY POWER STATION UNIT 2 DOCKET NO: 50-281

,:, REPORT NO: 50-281 .

REPORT NO: 80-043/03L-0 EVENT DATE: 11-22-80

SUBJECT:

EXCESSIVE CONTROL ROOM LEAKAGE

1. EVENT DESCRIPTION One November 22, 1980, with Unit No. 2 at 100% power PT-33 "Control Room Leakage Test" failed to meet the required acceptance criteria of*0.05 inches of water.

This is contrary to Technical Specification 3.19A and is reportable per Tech-nical Specification 3.19A and is reportable per Technical Specification. 6.6.2.b(2).

The PT was being conducted as a special test following maintenance on the control room pressure envelope.

2. PROBABLE CONSEQUENCES AND STATUS OF REDUNDANT EQUIPMENT The requirement of 0.05 inches of water ensures that the integrity of the control room is such that the bottled air system will prevent the leakage of radioactive materials for a period of one hour during an accident. The emergency ventilation system, filtered air, was proven operable as required by Technical Specification 3.19B. Therefore, the health and safety of the public were not affected.
3. CAUSE The door to 2B battery room had excessive leakage.

4 *. IMMEDIATE CORRECTIVE ACTION The emergency ventilation system was proven operable and the source of the leakage was identified.

5. SUBSEQUENT CORRECTIVE ACTIONS The battery room door was repaired and PT-33 was performed satisfactorily.

6.. ACTION TAKEN TO PREVENT RECURRANCE The development cf check list for door seals will identify developing problems.

7. GENERIC IMPLICATIONS NONE.