Forwards Insp Repts 50-272/99-04 & 50-311/99-04 on 990419-0529.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy
ML18107A425
Person / Time
Site: Salem  
Issue date: 07/06/1999
From: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
Public Service Enterprise Group
Shared Package
ML18107A426 List:
References
50-272-99-04, 50-272-99-4, 50-311-99-04, 50-311-99-4, NUDOCS 9907120312
Download: ML18107A425 (3)


See also: IR 05000272/1999004

Text

Mr. Harold W. Keiser

President and Chief Nuclear Officer

Nuclear Business Unit

  • July 6, 1999

Public Service Electric and Gas Company

Post Office Box 236

Hancocks Bridge; NJ 08038

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-272/99-04, 50-311/99-04

Dear Mr. Keiser:

On May 29, 1999, the NRC completed an inspection at your Salem 1 & 2 reactor facilities. The

enclosed report presents the results of that inspection. The preliminary results and conclusions

were presented to PSE&G management led by Mr. Lou Storz of your staff in an exit meeting on

June 4, 1999.

During the six-week period covered by this inspection report, your activities at Salem were

generally characterized by safety-conscious operations, sound engineering and maintenance

practices, and careful radiological work controls .

Overall, Unit 2 outage activities were effectively coordinated and performed safely with

appropriate radiological controls. Also, operators responded effectively to a Unit 1 automatic reactor trip that resulted from a dropped control rod. Nonetheless, we concluded that continued

management attention was warranted in human performance, as evidenced by the fact that two

issues in this area resulted in violations of NRC requirements. First, the inappropriate marking

of procedure steps as "not applicable* resulted in inadequate maintenance on the Unit 2

containment fan cooler units (CFCUs). Secondly, ineffective supervision of a surveillance test

resulted in an unplanned entry into technical specification 3.0.3. These events had negligible

actual safety consequence, but both could have been prevented by more alert supervision and

better questioning attitude by your staff.

We have determined that two Severity Level IV violations of NRC requirements occurred, as

discussed above. These violations are being treated as non-cited violations (NCVs), consistent

with Appendix C of the Enforcement Policy. These NCVs are described in the subject

inspection report. If you contest the violation or severity level of these NCVs, you should

provide a response within 30 days of the date of this inspection report, with the basis for your

denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC

20555-0001, with copies to the Regional Administrator, Region I, and the Director, Office of

Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and

the NRC Resident Inspector at the Salem facility .

  • *

9907120312 990706

PDR

ADOCR 05000272

G

PDR

Mr. Harold W. Keiser

2

In accordance with 1 O CFR 2. 790 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room (PDR).

Docket Nos.: 50-272, 50-311

License Nos: DPR-70, DPR-75

Sincerely,

Origin~! Signed By:

Glenn W. Meyer, Chief

Projects Branch 3

Division of Reactor Projects

Enclosure:

Inspection Report 50-272/99-04, 50-311/99-04

ccw/encl:

L. Storz, Senior Vice President - Nuclear Operations

E. Simpson, Senior Vice President - Nuclear Engineering

E. Salowitz, Director - Nuclear Business Support

A. F. Kirby, Ill, External Operations - Nuclear, Delmarva Power & Light Co.

D. Garchow, General Manager - Salem Operations

J. McMahon, Director - QA/Nuclear Training/Emergency Preparedness

D. Powell, Director, Licensing, Regulation and Fuels

R. Kankus, Joint Owner Affairs

A. Tapert, Program Administrator

J. J. Keenan, Esquire

M. J. Wetterhahn, Esquire

J. A. Isabella, Manager, Joint Generation

Atlantic Electric

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways Creek Township

State of New Jersey

State of Delaware

Mr. Harold W. Keiser

Distribution w/encl:

Region I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector,

PUBLIC

H. Miller, RA/J. Wiggins, DRA

G. Meyer, DRP

R. Barkley, DRP

S. Barr, DRP

C. O'Daniell, DRP

Distribution w/encl: (Via E-Mail)

M. Tschiltz, OEDO

E. Adensam, PD1, NRR

J. Clifford, NRR

P. Milano, NRR

T. Madden, OCA

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

DOC DESK

3

DOCUMENT NAME: G:\\BRANCH3\\2-SAL\\sa11R99-04.wpd

To receive a copy of this document, Indicate In the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

OFFICE

Rl/DRP

I

I

I

I

I

I

I

NAME

GM eyer

DATE

07/01/99

071 /99

071 /99

071 /99

071 /99

OFFICIAL RECORD COPY

,