ML18107A477
| ML18107A477 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 08/10/1999 |
| From: | Meyer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Keiser H Public Service Enterprise Group |
| Shared Package | |
| ML18107A478 | List: |
| References | |
| 50-272-99-05, 50-311-99-05, NUDOCS 9908170030 | |
| Download: ML18107A477 (3) | |
See also: IR 05000272/1999005
Text
.**
Mr. Harold W. Keiser
President and Chief Nuclear Officer
Post Office Box 236
Hancocks Bridge, NJ 08038
August 10, 1.999
SUBJECT:
NRC INSPECTION REPORT 50-272/99-05, 50-311/99-05
Dear Mr. Keiser:
On July 11, 1999, the NRC completed an inspection of your Salem 1 & 2 reactor facilities. The
enclosed report presents the results of that inspection. The preliminary findings were presented
to PSEG Nuclear management led by Messrs. Mark Bezilla and Dave Garchow in an exit
meeting on July 16, 1999.
This inspection was an examination of activities conducted under your license as they related to
reactor safety and compliance with the Commission's rules and regulations, and with the
conditions of your license. Within these areas the inspection consisted of a selected
examination of procedures and representative records, observations of activities, and interviews
with personnel. Specifically, this inspection involved six weeks of resident inspection.
Also, the inspectors reviewed the performance indicators (Pis) you submitted as part of the pilot
program for the new regulatory oversight process and verified the data which supported three of
these Pis. We noted that in the May 1999 and June 1999 submittals Salem Pis were reported
as green, with the exception of one white Pl at each unit for Protected Area Security Equipment
Performance Index. We recognize that this Pl resulted primarily from planned security
compensatory measures during the installation of system upgrades in the fourth quarter of 1998,
and we do not plan any additional inspections or reviews in response to this white Pl.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
Original Signed By:
Glenn W. Meyer, Chief,
Projects Branch 3
Division of Reactor Projects
Enclosure:
Inspection Report 50-272/99-05, 50-311/99-05
9908170030 990810
ADOCK 05000272
G
/*()/
/~'
..
Mr. Howard W. Keiser
2
cc w/e.ncl:
L. Storz, Senior Vice President - Nuclear Operations
E. Simpson, Senior Vice President and Chief Administrative Officer
M. Bezilla, Vice President - Nuclear Operations
D. Garchow, Vice President - Technical Support
M. Trum, Vice President - Maintenance
T. O'Connor, Vice President - Plant Support
E. Salowitz, Director - Nuclear Business Support
A. F. Kirby, Ill, External Operations - Nuclear, Delmarva Power & Light Co.
J. McMahon, Director - QA/Nuclear Training/Emergency Preparedness
D. Powell, Director, Licensing, Regulation and Fuels
R. Kankus, Joint Owner Affairs
A. Tapert, Program Administrator
J. J. Keenan, Esquire
Consumer Advocate, Office of Consumer Advocate
W. Conklin, Public Safety Consultant, Lower Alloways Creek Township
M. Wetterhahn, Esquire
State of New Jersey
State of Delaware
- '
Mr. Howard W. Keiser
Distribution w/encl:
Region I Docket Room (with concurrences)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
PUBLIC
H. Miller, RA/J. Wiggins, ORA
G. Meyer, DRP
S. Barr, DRP
R. Barkley, DRP
C. O'Daniell, DRP
Distribution w/encl: (via e-mail)
M. Tschiltz, OEDO
E. Adensam, NRR
J. Clifford, NRR
P. Milano, PDl-2, NRR
T. Madden, OCA
Inspection Program Branch, NRR (IPAS)
T. Frye, NRR
R. Correia, NRR
DOC DESK
3
DOCUMENT NAME: G:\\BRANCH3\\2-Salem\\sal9905.wpd
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E"::; Copy with attachment/enclosure "N" = No copy
OFFICE
Rl/DRP
Rl/DRP
I
NAME
SM orris
GM eyer
DATE
08/10/99
08//o/99
/99
08/ /99
08/ /99
ICIAL RECORD COPY