Discusses 990820 Telcon Between D Silk & D Jackson Re Arrangements for Administration of Licensing Exam During Wks of January 10 & 17,2000
ML18107A500
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/25/1999
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
Public Service Enterprise Group
References
NUDOCS 9909010097
Download: ML18107A500 (4)


Text

Mr. Harold W. Keiser President and Chief Nuclear Officer PSEG Nuclear LLC Post Office Box 236 Hancocks Bridge, NJ 08038 August 25, 1999

SUBJECT:

SENIOR REACTOR AND REACTOR OPERATOR INITIAL EXAMINATIONS -

SALEM UNITS 1 & 2

Dear Mr. Keiser:

In a telephone conversation on August 20, 1999, between Mr. David Silk, Examiner/Inspector, and Mr. Don Jackson, Manager, Nuclear Operations Training, arrangements were made for the administration of licensing examinations at Salem facility, during the weeks of January 10, 2000 and January 17, 2000.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 8, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by October 25, 1999. The written examinations and operating tests will be due by

  • November 25, 1999. Supporting reference materials identified in Attachment 2 of ES-201 will be requested by the chief examiner on an as-needed basis. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates notes above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first 9909010097 990825 PDR ADOCK 05000272 V

PDR

Mr. Harold examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed appHcations certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are submit to the PapetWork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30, 2000.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33),

.U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Don Jackson has been.advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact D. Silk at (610) 337-5372, or me at (610) 337-5183.

Docket Nos. 50-272, 50-311 Sincerely, ORIGINAL SIGNED BY:

Richard J. Conte, Chief Human Performance and Emergency Preparedness Branch Division of Reactor Safety

Mr. Harold c~

L. Storz, Senior Vice President - Nuclear Operations E. Simpson, Senior Vice President and Chief Administrative Officer M. Bezilla, Vice President - Nuclear Operations D. Garchow, Vice President - Technical Support M. Trum, Vice President-Maintenance T. O'Connor, Vice President - Plant Support E. Salowitz, Director - Nuclear Business Support AF. Kirby, Ill, External Operations - Nuclear, Delmarva Power & Light Co.

J. McMahon, Director - QNNuclear Training/Emergency Preparedness D. Powell, Director, Licensing, Regulation and Fuels R. Kankus, Joint Owner Affairs A Tapert, Program Administrator J. J. Keenan, Esquire Consumer Advocate, Office of Consumer Advocate W. Conklin, Public Safety Consultant, Lower Alloways Creek Township M. Wetterhahn, Esquire State of New Jersey State of Delaware J. Guinan, NJ PIRG N. Cohen, Coalition for Peace and Justice R. Fisher*

F.Berryhill B. August D. Jackson, Manager, Nuclear Operations Training

Mr. Harold W. Keiser Distribution:

Region I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

NRG Resident Inspector PUBLIC H. Miller, RNJ. Wiggins, ORA

  • G. Meyer, DRP S.Barr,DRP L. Harrison, DRP C. O'Daniell, DRP L. Prividy, DRS W. Lanning, DRS B. Holian, DRS R. Conte, DRS D. Silk, Chief Examiner OL Facility File 0/. Curley, DRS)

DRS File Distribution: (Via E-Mail)

M. Tschiltz, OEDO E. Adensam, NRR S. Bajwa, NRR P. Milano, PDl-2, NRR T. Madden, OCA Inspection Program Branch, NRR (IPAS)

R. Correia, NRR DOC DESK DOCUMENT NAME: G:\\HPEPB\\SILK\\SALEM120DAYLTR.WPD To receive a copy of this document, Indicate In the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS NAME DSilk DATE 08/23/99 08/ /99 08/ /99 08/ /99 OFFICIAL RECORD COPY