MONTHYEARML20217M2101999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates LR-N990450, Submits 30-day Fuel Clad Temp Rept,Iaw 10CFR50.46.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Salem Generating Station Large & Small Break LOCA Analyses1999-10-18018 October 1999 Submits 30-day Fuel Clad Temp Rept,Iaw 10CFR50.46.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Salem Generating Station Large & Small Break LOCA Analyses ML18107A5531999-10-0808 October 1999 Forwards Summary Rept of Plant Startup & Power Ascension Testing for Sgs,Unit 2 Cycle 11,per Requirements of TS 6.9.1.1 ML18107A5511999-10-0707 October 1999 Forwards RAI Re Licensee 990604 Request for NRC Concent to Transfer Pse&G Ownership Interests & Licensed Operating Authorities in Hope Creek & Salem to New,Affiliated Nuclear Generating Company,Pseg Nuclear Limited Liability Co LR-N990409, Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests1999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML18107A5521999-10-0505 October 1999 Encourages NRC to Support ABB Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5591999-10-0505 October 1999 Informs That Nj Dept of Environ Protection Has No Comments on License Change Request S99-07 for Sgs,Units 1 & 2 ML18107A5471999-09-28028 September 1999 Forwards Insp Repts 50-272/99-07 & 50-311/99-07 on 990712- 0829.Six Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with Interim Enforcement Policy for Pilot Plants ML18107A5401999-09-24024 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Sngs,Units 1 & 2 ML18107A5461999-09-23023 September 1999 Informs That Response to Violations Noted in Insp Repts 50-272/99-08 & 50-311/99-08,acceptable NTD-99-302, Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999)1999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) ML18107A5421999-09-22022 September 1999 Forwards Discharge Monitoring Rept for Salem Generating Station for Aug 1999.Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18107A5371999-09-20020 September 1999 Forwards Insp Repts 50-272/99-06 & 50-311/99-06 on 990719-0806 (Region I-Inoffice) 990809-19 & 0901.NRC Has Determined That Three Violations of NRC Requirements Have Occurred.Violations Being Treated as non-cited ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld LR-N000420, Provides Notification That PSEG Intends to Utilize ASME Code Case N-481 During Second ISI Interval at Sgs Units 1 & 21999-09-13013 September 1999 Provides Notification That PSEG Intends to Utilize ASME Code Case N-481 During Second ISI Interval at Sgs Units 1 & 2 LR-N990405, Forwards Revised 10CFR50.92 Evaluation to Clarify Util Response to Question Number 1 Re Amend to Modify TS 3/4 8.1, AC Power Sources1999-09-13013 September 1999 Forwards Revised 10CFR50.92 Evaluation to Clarify Util Response to Question Number 1 Re Amend to Modify TS 3/4 8.1, AC Power Sources ML18107A5351999-09-13013 September 1999 Informs That NRC Has Reviewed Pse&G Request Proposing to Modify TS Which Allow EDG to Be Operated for 24 Surveillance Test During Any Mode,Iaw 10CFR50.91(b) & Has No Comments LR-N990406, Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations1999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations LR-N990392, Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1999. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Salem Generating Station for Period of Jan-June 19991999-09-0808 September 1999 Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1999. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Salem Generating Station for Period of Jan-June 1999 LR-N990396, Forwards Ninety Day Rept for ISI Activities Conducted at Sgs,Unit 2 During Ninth Extended Outage & Tenth Refueling Outage.List of Encl,Provided1999-08-26026 August 1999 Forwards Ninety Day Rept for ISI Activities Conducted at Sgs,Unit 2 During Ninth Extended Outage & Tenth Refueling Outage.List of Encl,Provided ML18107A5061999-08-26026 August 1999 Provides First Feedback from Observation of NRC Insp Under Pilot Nuclear Power Plant Insp Program.Attached Are Completed Insp Feedback Forms for Procedure 71111, Attachment 21 & Procedure 71151 LR-N990385, Forwards Response to NOV That Resulted from Predecisional Enforcement Conference Conducted on 990624.Corrective Actions:Communications to Supervisors Reinforced Employee Right & Duty to Raise Nuclear Safety Issues1999-08-26026 August 1999 Forwards Response to NOV That Resulted from Predecisional Enforcement Conference Conducted on 990624.Corrective Actions:Communications to Supervisors Reinforced Employee Right & Duty to Raise Nuclear Safety Issues ML18107A5001999-08-25025 August 1999 Discusses 990820 Telcon Between D Silk & D Jackson Re Arrangements for Administration of Licensing Exam During Wks of January 10 & 17,2000 ML18107A5051999-08-24024 August 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Request IAW Requirements of 10CFR50.91(b) & Has No Comments Re Amend to FOL Change Request S99-02 to Modify TS Re Penetration Valves LR-N990363, Provides Suppl Info Re 971024 Amend Request to Modify TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Util Withdraws from Request All Proposed Changes Associated with Filter Testing,Per Issuance of GL 99-021999-08-23023 August 1999 Provides Suppl Info Re 971024 Amend Request to Modify TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Util Withdraws from Request All Proposed Changes Associated with Filter Testing,Per Issuance of GL 99-02 LR-N990389, Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars1999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML18107A4861999-08-19019 August 1999 Forwards NPDES Discharge Monitoring Rept, for Salem Generating Station for Month of Jul 1999.Rept Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection LR-N990375, Submits Licensee Comments on NRC Which Provided Notification of Close Out of TAC Numbers MA0567 & MA0568 Re GL 92-01,Rev 1,Suppl 11999-08-18018 August 1999 Submits Licensee Comments on NRC Which Provided Notification of Close Out of TAC Numbers MA0567 & MA0568 Re GL 92-01,Rev 1,Suppl 1 LR-N990140, Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed1999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML18107A4771999-08-10010 August 1999 Forwards Insp Repts 50-272/99-05 & 50-311/99-05 on 990530- 0711.No Violations Noted.Inspectors Also Reviewed Licensee Performance Indicators,Submitted as Part of Pilot Program for New Regulatory Oversight Process ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML18107A4701999-07-30030 July 1999 Discusses Closure of Listed TACs in Response to Requests for Addl Info Re GL 92-01 ML18107A4711999-07-28028 July 1999 Discusses Administrative Proceeding Conducted by DOL Re Complaint Filed with DOL on 980419 by Nuclear Mechanical Technician & Forwards Notice of Violation & Synopsis of OI Investigation Rept 1-1998-023 ML18107A4531999-07-20020 July 1999 Forwards Discharge Monitoring Rept for Salem Generating Station, for June 1999.Rept Is Required by & Prepared for EPA & Nj Dept of Environ Protection ML18107A4361999-07-16016 July 1999 Accepts Commitment to NRC Re Licensee Providing Clarification Concerning Licensing & Design Basis for 125 Vdc Battery Margins for Hope Creek & Salem Generating Stations for Meeting SBO & Loca/Loop Loading Requirements ML18107A4381999-07-0909 July 1999 Forwards SER & Notice of Denial of Amend of Licensee Amend Request S97-07 to Revise Applicable TSs Re Control Room Emergency Air Conditioning System ML18107A4311999-07-0606 July 1999 Discusses Requalification Program Insp,Planned for Wk of 990830,which Coincides with Regulatory Scheduled Requalification Exam Cycle ML18107A4251999-07-0606 July 1999 Forwards Insp Repts 50-272/99-04 & 50-311/99-04 on 990419-0529.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML18107A4431999-07-0606 July 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S98-17 Re Permissible Enrichment Values for New Fuel Storage & Has No Comments ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 LR-N990251, Submits Response to NRC Request for Info Re Y2K Readiness at Npps,Per GL 98-01,suppl 1.Disclosure Encl1999-06-30030 June 1999 Submits Response to NRC Request for Info Re Y2K Readiness at Npps,Per GL 98-01,suppl 1.Disclosure Encl ML20209B6751999-06-29029 June 1999 Ack Receipt of from Dr Powell in Response to NRC Re Fitness for Duty.Attachment 2 of Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML18107A4121999-06-28028 June 1999 Informs That Attachment 1 to Util Ltr LR-N99257,dtd 990604 Will Be Marked as Proprietary & Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended LR-N990289, Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util & Discussion with NRC1999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util & Discussion with NRC ML18107A3891999-06-23023 June 1999 Discusses Evaluation of Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. Safety Evaluation Encl ML18107A3981999-06-23023 June 1999 Forwards Copies of Notice of Consideration of Approval & Transfer of FOLs DPR-70,DPR-75 & NPF-57,respectively & Issuance of Conforming Amends & Opportunity for Hearing Re 990604 Application for Approval of Transfer of Licenses ML18107A4141999-06-23023 June 1999 Forwards SE Accepting Licensee Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions, for Plant,Units 1 & 2 ML18107A4091999-06-22022 June 1999 Forwards Discharge Monitoring Rept for May 1999,containing Info as Required by Permit NJ0005622.Rept Prepared Specifically for EPA & Nj Dept of Environ Protection 1999-09-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M2101999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML18107A5511999-10-0707 October 1999 Forwards RAI Re Licensee 990604 Request for NRC Concent to Transfer Pse&G Ownership Interests & Licensed Operating Authorities in Hope Creek & Salem to New,Affiliated Nuclear Generating Company,Pseg Nuclear Limited Liability Co ML18107A5471999-09-28028 September 1999 Forwards Insp Repts 50-272/99-07 & 50-311/99-07 on 990712- 0829.Six Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with Interim Enforcement Policy for Pilot Plants ML18107A5401999-09-24024 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Sngs,Units 1 & 2 ML18107A5461999-09-23023 September 1999 Informs That Response to Violations Noted in Insp Repts 50-272/99-08 & 50-311/99-08,acceptable ML18107A5371999-09-20020 September 1999 Forwards Insp Repts 50-272/99-06 & 50-311/99-06 on 990719-0806 (Region I-Inoffice) 990809-19 & 0901.NRC Has Determined That Three Violations of NRC Requirements Have Occurred.Violations Being Treated as non-cited ML18107A5001999-08-25025 August 1999 Discusses 990820 Telcon Between D Silk & D Jackson Re Arrangements for Administration of Licensing Exam During Wks of January 10 & 17,2000 ML18107A4771999-08-10010 August 1999 Forwards Insp Repts 50-272/99-05 & 50-311/99-05 on 990530- 0711.No Violations Noted.Inspectors Also Reviewed Licensee Performance Indicators,Submitted as Part of Pilot Program for New Regulatory Oversight Process ML18107A4701999-07-30030 July 1999 Discusses Closure of Listed TACs in Response to Requests for Addl Info Re GL 92-01 ML18107A4711999-07-28028 July 1999 Discusses Administrative Proceeding Conducted by DOL Re Complaint Filed with DOL on 980419 by Nuclear Mechanical Technician & Forwards Notice of Violation & Synopsis of OI Investigation Rept 1-1998-023 ML18107A4361999-07-16016 July 1999 Accepts Commitment to NRC Re Licensee Providing Clarification Concerning Licensing & Design Basis for 125 Vdc Battery Margins for Hope Creek & Salem Generating Stations for Meeting SBO & Loca/Loop Loading Requirements ML18107A4381999-07-0909 July 1999 Forwards SER & Notice of Denial of Amend of Licensee Amend Request S97-07 to Revise Applicable TSs Re Control Room Emergency Air Conditioning System ML18107A4251999-07-0606 July 1999 Forwards Insp Repts 50-272/99-04 & 50-311/99-04 on 990419-0529.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML18107A4311999-07-0606 July 1999 Discusses Requalification Program Insp,Planned for Wk of 990830,which Coincides with Regulatory Scheduled Requalification Exam Cycle ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 ML20209B6751999-06-29029 June 1999 Ack Receipt of from Dr Powell in Response to NRC Re Fitness for Duty.Attachment 2 of Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML18107A4121999-06-28028 June 1999 Informs That Attachment 1 to Util Ltr LR-N99257,dtd 990604 Will Be Marked as Proprietary & Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML18107A3891999-06-23023 June 1999 Discusses Evaluation of Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. Safety Evaluation Encl ML18107A3981999-06-23023 June 1999 Forwards Copies of Notice of Consideration of Approval & Transfer of FOLs DPR-70,DPR-75 & NPF-57,respectively & Issuance of Conforming Amends & Opportunity for Hearing Re 990604 Application for Approval of Transfer of Licenses ML18107A4141999-06-23023 June 1999 Forwards SE Accepting Licensee Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions, for Plant,Units 1 & 2 ML18107A3731999-06-15015 June 1999 Forwards SE Accepting Ltrs Dtd 980908,990405 & 22,requesting Approval of Proposed Changes to Nuclear Business Unit EP for Hope Creek & Salem Generating Stations,Iaw 10CFR50.54(q) ML18107A3651999-06-0909 June 1999 Discusses NOED for Pse&G Re Plant,Unit 1 & Concludes That to Avoid Undesirable Transient as Result of Forcing Compliance with License Condition,Noed Was Warranted,Because Action Involved Minimal Safety Impact ML18107A4201999-06-0404 June 1999 Informs That NRR Reorganized,Effective 990328.Organization Chart Encl ML18107A3401999-05-27027 May 1999 Informs That on 990512 NRC Held Planning Meeting to Identify Insp Activities at Salem Facility Over Next Six Months. During Next Six Months (June-Nov of 1999),NRC Plans to Perform Inspections Listed on Two Encls ML18107A3411999-05-24024 May 1999 Forwards Narrative Summary for 980303,plume Exposure Pathway Exercise & 980505-07,ingestion Pathway Exercise for Plants. Narrative Summary Omitted from Final Exercise Rept Submitted 990419 ML18107A3251999-05-21021 May 1999 Forwards Insp Repts 50-272/99-02 & 50-311/99-02 on 990308- 0418.NRC Concerned About Three Related non-cited Violations of NRC Requirements Identified During Rept Period ML18107A3041999-05-14014 May 1999 Discusses DOL ALJ Decision & Order, Re Predecisional Enforcement Conference Re Employee Claim That He Was Discriminated Against by Util for Raising Safety Issues.Since Review Not Complete,Nov Not Issued ML18107A2901999-05-11011 May 1999 Informs That on 990407 NRC Administered Generic Fundamentals Exam Section of Written Operator Licensing Exam to Employee of Util Facility.One Individual from Salem 1 & 2 Administered Exam & Passed ML18107A2751999-05-0303 May 1999 Forwards Insp Repts 50-272/99-03 & 50-311/99-03 on 990315- 19.No Violations Were Identified ML18107A2701999-04-30030 April 1999 Refers to Investigation Conducted by OI After Chemistry Supervisor at Salem Facility Made Change to Procedure Without Proper Review & Signed Record Indicating That Independent Verifications Had Been Performed ML18107A2651999-04-30030 April 1999 Discusses Investigation Conducted by OI (Rept 1-98-011) to Evaluate Allegation That D Branham Made Procedure Change Without Proper Review & Signed Record Indicating All Independent Verifications Made.Forwards NOV ML18107A2161999-04-19019 April 1999 Forwards Ltr from Lg Canton,Regional Director,Fema Region II to Hj Miller,Nrc Region I,Forwarding FEMA Final Exercise Rept for 980303 Plume Exposure Pathway Exercise & 980505-07 Ingestion Pathway Exercise for Salem/Hope Creek Stations ML18107A1891999-04-15015 April 1999 Responds to Re NRC Fire Protection Regulations. Commission Provided Addl Direction to NRC to Begin Fire Protection Rulemaking at Earliest Possible Date in Parallel with Establishment of NFPA Std ML18107A1761999-04-15015 April 1999 Responds to 981019 & s Requesting Approval of Proposed Changes to QA Program,Per Section 17.2 of Respective UFSAR Per 10CFR50.54(a)(3).Forwards SE Re Changes to QA Program ML18106B1621999-04-0909 April 1999 Informs of NRC Planned Insp Effort Resulting from Salem Generating Station Plant Performance Review Conducted for Period April 1998 Through Jan 1999.Historical Listing of Plant Issues & Insp Plans for Next Few Months Encl ML18107A1631999-04-0909 April 1999 Forwards Salem Unit 1 & 2 Reactor Operator & Senior Reactor Operator Initial Exam Repts 50-272/99-301 & 50-311/99-301 on 990222-0305 & 08-12.Eight of Eight SRO & Seven of Eight RO Applications Passed All Portions of Exams ML18106B1631999-04-0707 April 1999 Forwards Exemption from Certain Requirements of 10CFR50.71 Re Submission of Revs to UFSAR for Plant,Units 1 & 2 & SE Accepting That Rev IR 05000311/19980121999-04-0707 April 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-311/98-12.Review of Effectiveness of Corrective Actions in Rept, as Part of Independent Assessment of RCS & LER Completed ML18106B1441999-04-0101 April 1999 Forwards SER Authorizing Util 980716 Request to Use Alternative Welding Process as Provided in ASME Code, Section Xi,Article IWA-4500,1992 Edition,For Potential Repair of SG Feedwater Nozzles for Plant,Unit 2 IR 05000272/19990011999-04-0101 April 1999 Forwards Insp Repts 50-272/99-01 & 50-311/99-01 on 990117-0307.No Violations Identified.Expresses Concern About Two Human Errors That Caused Plant Events,One Which Challenged Safety Sys ML18106B1101999-03-23023 March 1999 Informs of Individual Exam Results of Applicants on Initial Written Exam & Operating Test Conducted at Plant on 990226 & 0222-0305.Sixteen Individuals Were Administer exam,14 Passed & 2 Failed ML18106B1091999-03-23023 March 1999 Forwards RAI Re NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML18106B1081999-03-22022 March 1999 Requests Info Re 990125 Event Involving NRC Licensed Operator Who Was Not Performing Licensed Duties & Was Determined to Be Under Influence of Alcohol Following for- Cause fitness-for-duty Test.Questionnaire Encl ML18106B1041999-03-17017 March 1999 Discusses Util Request That Requirements to Obtain More Definitive Habitat Utilization Data Under Incidental Take Statement in Biological Opinion for Salem & Hope Creek Nuclear Generating Stations Be Deleted ML18106B0991999-03-12012 March 1999 Forwards Request for Addl Info Re Enrichment Values for New Fuel Storage,Salem Nuclear Generating Station ML18106B0961999-03-12012 March 1999 Discusses Relief Requests V-24 & V-25 Re Testing of Accumulator Check Valves.Safety Evaluation Re IST Program Requests for Relief Encl ML18106B0771999-02-24024 February 1999 Forwards Revised TS Bases Sections 3/4.1.2,boration Sys, 3/4.1.3,moveable Control Assemblies for Unit 1 only,3/4.5.5, Refueling Water Storage Tank & 3/4.9.1,boron Concentration. NRC Has No Objection to Changes ML18106B0741999-02-18018 February 1999 Provides Authorization to Administer Written Exams to Listed Applicants on 990226 at Salem Generating Station,Hancocks Bridge,New Jersey.Nrc Region I Operator Licensing Staff Will Administer Operating Tests on 990222-25 & 990301-05 ML18106B0651999-02-12012 February 1999 Forwards Insp Repts 50-272/98-12 & 50-311/98-12 on 981206-990116 & Nov.Expresses Concern Re Circumstances Which Led to 981208 RCS Leak at Unit 2.Event Result of Inadequate CR Supervision During Startup ML18106B0731999-02-11011 February 1999 Discusses Closure of TAC Re Generic Implication of part- Length Control Rod Drive Mechanism Housing Leak 1999-09-28
[Table view] |
Text
Mr. Harold W. Keiser President and Chief Nuclear Officer PSEG Nuclear LLC Post Office Box 236 Hancocks Bridge, NJ 08038 August 25, 1999
SUBJECT:
SENIOR REACTOR AND REACTOR OPERATOR INITIAL EXAMINATIONS -
SALEM UNITS 1 & 2
Dear Mr. Keiser:
In a telephone conversation on August 20, 1999, between Mr. David Silk, Examiner/Inspector, and Mr. Don Jackson, Manager, Nuclear Operations Training, arrangements were made for the administration of licensing examinations at Salem facility, during the weeks of January 10, 2000 and January 17, 2000.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 8, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by October 25, 1999. The written examinations and operating tests will be due by
- November 25, 1999. Supporting reference materials identified in Attachment 2 of ES-201 will be requested by the chief examiner on an as-needed basis. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates notes above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first 9909010097 990825 PDR ADOCK 05000272 V
PDR
Mr. Harold examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed appHcations certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are submit to the PapetWork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30, 2000.
The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33),
.U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Don Jackson has been.advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact D. Silk at (610) 337-5372, or me at (610) 337-5183.
Docket Nos. 50-272, 50-311 Sincerely, ORIGINAL SIGNED BY:
Richard J. Conte, Chief Human Performance and Emergency Preparedness Branch Division of Reactor Safety
Mr. Harold c~
L. Storz, Senior Vice President - Nuclear Operations E. Simpson, Senior Vice President and Chief Administrative Officer M. Bezilla, Vice President - Nuclear Operations D. Garchow, Vice President - Technical Support M. Trum, Vice President-Maintenance T. O'Connor, Vice President - Plant Support E. Salowitz, Director - Nuclear Business Support AF. Kirby, Ill, External Operations - Nuclear, Delmarva Power & Light Co.
J. McMahon, Director - QNNuclear Training/Emergency Preparedness D. Powell, Director, Licensing, Regulation and Fuels R. Kankus, Joint Owner Affairs A Tapert, Program Administrator J. J. Keenan, Esquire Consumer Advocate, Office of Consumer Advocate W. Conklin, Public Safety Consultant, Lower Alloways Creek Township M. Wetterhahn, Esquire State of New Jersey State of Delaware J. Guinan, NJ PIRG N. Cohen, Coalition for Peace and Justice R. Fisher*
F.Berryhill B. August D. Jackson, Manager, Nuclear Operations Training
Mr. Harold W. Keiser Distribution:
Region I Docket Room (with concurrences)
Nuclear Safety Information Center (NSIC)
NRG Resident Inspector PUBLIC H. Miller, RNJ. Wiggins, ORA
- G. Meyer, DRP S.Barr,DRP L. Harrison, DRP C. O'Daniell, DRP L. Prividy, DRS W. Lanning, DRS B. Holian, DRS R. Conte, DRS D. Silk, Chief Examiner OL Facility File 0/. Curley, DRS)
DRS File Distribution: (Via E-Mail)
M. Tschiltz, OEDO E. Adensam, NRR S. Bajwa, NRR P. Milano, PDl-2, NRR T. Madden, OCA Inspection Program Branch, NRR (IPAS)
R. Correia, NRR DOC DESK DOCUMENT NAME: G:\\HPEPB\\SILK\\SALEM120DAYLTR.WPD To receive a copy of this document, Indicate In the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS NAME DSilk DATE 08/23/99 08/ /99 08/ /99 08/ /99 OFFICIAL RECORD COPY