ML18107A431

From kanterella
Jump to navigation Jump to search
Discusses Requalification Program Insp,Planned for Wk of 990830,which Coincides with Regulatory Scheduled Requalification Exam Cycle
ML18107A431
Person / Time
Site: Salem  
Issue date: 07/06/1999
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
Public Service Enterprise Group
References
NUDOCS 9907140003
Download: ML18107A431 (3)


Text

  • '

Mr. Harold W. Keiser President and Chief Nuclear Officer Nuclear Business Unit Public Service Electric and Gas Company P. 0. Box 236 Hancocks Bridge, New Jersey 08038 July 6, 1999

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION -SALEM

Dear Mr. Keiser:

In a telephone conversation on July 2, 1999, Thomas Kenny and Todd Fish made arrangements for the NRC to inspect the licensed operator requalification program at the Salem Nuclear Generating Station, Unit Nos. 1 and 2. The inspection is planned for the week of August 30, 1999, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRG-approved requalification program. This inspection will be conducted in accordance with the new NRC reactor inspection and oversight program, using Inspection Module 71111-11.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the exam week schedule and the written examinations and operating tests scheduled for the week of the inspection to the NRC by August 13, 1999.

Paul Williams has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30, 2000.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail atBJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

9907140003 99070672 PDR ADOC~ 050002 V

PDR I/

'...,.,/

\\ r.*:;

l, ~

_,,i;:_.

-f.;

Mr. Harold Thank you for your cooperation in this matter. If you have any quest!ons regarding this inspection, please contact T. Kenny at (610) 337-5287.

Docket Nos. 50-272, 50-311 cc:

Sincerely, ORIGINAL SIGNED BY:

Richard J. Conte, Chief Human Performance and Emergency Preparedness Branch Division of Reactor Safety L. Storz, Senior Vice President - Nuclear Operations E. Simpson, Senior Vice President - Nuclear Engineering E. Salowitz, Director - Nuclear Business Support A. F. Kirby, Ill, External Operations - Nuclear, Delmarva Power & Light Co.

D. Garchow, General Manager - Salem Operations J. McMahon, Director - QA/Nuclear Training/Emergency Preparedness D. Powell, Director, Licensing, Regulation and Fuels R. Kankus, Joint Owner Affairs A. Tapert, Program Administrator J. J. Keenan, Esquire J. A. Isabella, Manager, Joint Generation Atlantic Electric Consumer Advocate, Office of Consumer Advocate William Conklin, Public Safety Consultant, Lower Alloways Creek Township M. Wetterhahn, Esquire J. Guinan, NJ PIRG N. Cohen, Coalition for Peace and Justice R. Fisher F. Berryhill B. August State of New Jersey State of Delaware D. Jackson, Manager, Nuclear Operations Training

Mr. Harold W. Keiser Distribution:

Region I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector PUBLIC H. Miller, RA/J. Wiggins, ORA G. Meyer, DRP S. Barr, DRP L. Harrison, DRP C. O'Daniell, DRP N. Della Greca, DRS W. Lanning, DRS B. Holian, DRS T. Kenny, DRS OL Facility File Distribution w/encl: (Via E-Mail)

M. Tschiltz, OEDO E. Adensam, NRR P. Milano, PDl-2, NRR T. Madden, OCA Inspection Program Branch, NRR (IPAS)

R. Correia, NRR DOC DESK DOCUMENT NAME: G:\\HPEPB\\KENNY\\SAL60RPl.WPD e*

To receive a copy of this document, indicate in the box: "C" =Copy without attachmenUenclosure "E" =Copy with attachmenUenclosure "N" =No copy OFFICE RI/DRS I

RI/DRS I'* I I I

I I

NAME TKenny -(.\\~

RCoote,/' )"J DATE 07/06/99 07/,f,/99 071 /99 071 /99 071 /99 OFFICIAL RECORD COPY