Public Service Electric and Gas Company JUN 04 1998 Louis F. Storz Public SeNice Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-5700 Senior Vice President - Nuclear Operations LR-N980230 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

REAFFIRMATION OF COMMITMENT TO JOG PROGRAM HOPE CREEK AND SALEM GENERATING STATIONS FACILITY OPERATING LICENSES DPR-70, DPR-75, AND NPF-57 DOCKET NOS. 50-272, 50-311, AND 50-354 In a letter to the Nuclear Regulatory Commission (NRG), dated March 13, 1997, Public Service Electric and G.as Company (PS_E&G) committed to implementing a motor-operated valve (MOV) periodic verification program for both Salem and Hope Creek Generating Stations that would be consistent with the program described in Topical Report MPR-1807, Revision 0, "Joint BWR and Westinghouse Owners' Group Program on Motor-Operated Valve Periodic Verification." Subsequently, MPR-1807/NEDC-32719, Revision 2 was submitted

  • to the NRG. On October 30, 1997, the NRG issued a safety evaluation (SE) for MPR-1807/NEDC-32719, Revision 2 that, within the conditions and limitations described in the SE, stated that the staff considers the Joint Owners Group (JOG) program on MOV periodic verification to be an acceptable industry-wide response to Generic Letter (GL) 96-05. The JOG had agreed that, after issuance of the SE, requests would be made for participating utilities to notify the NRG of their plans to implement the JOG program described in Revision 2 of the subject topical report. By this letter, PSE&G is notjfying the NRG of our plans to implement Revision 2 of MPR-1807/NEDC-32719 as our response to GL 96-05 for the Salem and Hope Creek Generating Stations. Additionally, the specific items described in PSE&G's March 13, 1997 letter continue to be applicable.

Should you have any questions or comments on this transmittal, please contact Mr. C. Manges at (609) 339-3234.

Sincerely,

~.

9ao61201ac~ b~&8~72 PDR ADO PDR p

l:I.\. Printed on

'=' Recycled Paper

.. e JUN 04 1~98 Document Control Desk LR-N980230 C Mr. H. Miller, Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. R. Ennis, Acting Licensing Project Manager - HC U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. P. Milano, Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. S. Pindale (X24)

USNRC Senior Resident Inspector - HC Mr. S. Morris (X24)

USNRC Senior Resident Inspector - Salem Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering P. 0. Box415 Trenton, NJ 08625 95-4933