ML18079B104
| ML18079B104 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 08/27/1979 |
| From: | Schneider F Public Service Enterprise Group |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML18079B103 | List: |
| References | |
| NUDOCS 7910120329 | |
| Download: ML18079B104 (2) | |
Text
e.
Frederick W. Schneider Vice President Public Service Electric and Gas Company 80 Park Place Newar.k, N.J. 07101 201 /430-7373 Production Mr. Boyc:e
- H. Grier..
Director of USNRC Off ice of Inspection and Enforcement Region i 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Mr.* Grier:
NRC INSPECTION REPORT NO.* 50-272/79-19 MAY 24-25 and May 30-31,.1979 UNIT NO. 1 SALEM GENERATING STATION A~gust 27,.1979 We have reviewed the report of your inspection conducted on May 24-25 and May 30-31, 1979,.which was transmitted with your letter of August 8, 1979,.and received on August 10,.1979.
The item of non-
. compliance in Appendix A of your. report is as follows:
Item 4.b - Deficiency 10CFR 55, Appendix A, states,.in part:
"Records of the requalifica-tion program sh~ll be maintained *.* to* document the participation of each *licensed operator.and senior operator in the requalif ication program."
Salem Generating Station Training Procedure 10, NRC Licensed Oper-ator Re*quaLi..fication Program, states, in part:
"A training folder will be *maintained by the training staff for each licensed operator for the life of* his license.
The folder will contain *** Qualifica-tion Card for Overall Plant Operating and Emergency Instructions *.* "
Contrary to the above, *although the Requalification Log shows ap-pr*opriate *o.perating and emergency instruction training and simula-tion was conducted in 1978,* none *of the selected ind.l.vidual opera-tors' training folders reviewed contained the aforementioned *Quali-fication Cards for the year 1978, as required by TP-10 to implement the provisions of 10CFR 55,.Appendix A, Paragraph 5.
Mr. B.H. Grier 2 -
8-27-79 Our response is as follows:
- 1.
The cause of the Deficiency was failure of the training staff to verify.that the folders were maintained in accordance with the procedure.
- 2.
To correct the situation, training folders have been updated to reflect actual training status *.
- 3.
To prevent future items of noncompliance, the training staff will more closely supervise record keeping.
Training Pro-cedure 10 shall be revised to clarify the requirements.
Sta-tion QA Engineer shall follow up on this activity by surveil-lance or audit.
- 4.
We are in compliance now.
The revision to procedure TP-10 shall be completed by October 1, 1979.
If you-require additional information, we will be pleased to discuss it with you.
Sincerely, CC:
Director, Office of Inspection
& Enforcement USNRC Washington, D.C.
20555