Proposed Tech Specs Re Requirements for Periodic DG Peak Load Tests
ML18064A761
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/01/1995
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18064A760 List:
References
NUDOCS 9505120013
Download: ML18064A761 (4)


Text

ATTACHMENT 1 Consumers Power Company Palisades Plant Docket 50-255 PROPOSED DG TESTING TECHNICAL SPECIFICATIONS PROPOSED PAGE

-4.7 EMERGENCY PO~ SYSTEM PERIODIC TESTS 4.7.1 Diesel Generators

a. Verify, each 31 days:
1) that each DG starts from standby conditions and achieves

~ 2000 V in ~ 10 seconds, steady state voltage ~ 2280 and

~ 2520 V, and frequency~ 59.5 and~ 61.2 Hz, and

2) that each DG operates for ~ 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />; for ~ 15 minutes loaded above the peak accident loading, and for the remainder of the test loaded ~ 2300 and ~ 2500 kW. Momentary transients outside the load range do not invalidate this test.
b. A test shall be conducted during each refueling outage to demonstrate the overall automatic operation of the emergency power system. The test shall be initiated by a simulated simultaneous loss of normal and standby power sources and a simulated SIS signal. Proper operations shall be verified by bus load shedding and automatic starting of selected motors and equipment to establish that restoration with emergency power has been accomplished within 30 seconds.
c. Each diesel generator shall be subjected to an inspection, in accordance with procedures prepared in conjunction with the manufacturer's recommendations for this class of standby service, at least once per refueling cycle during plant shutdown. The licensee shall utilize his best efforts to conduct additional major diesel generator inspections and overhauls during shutdown periods.
d. Verify, by analytical means, each 18 months that diesel generator steady state automatically connected electric loads do not exceed the continuous rating of 750 amp at 2400 volts.
e. The fuel transfer pumps shall be verified to be operable each month.

4.7.2 Station Batteries

a. Every month, the voltage of each cell (to the nearest 0.01 volt),

the specific gravity and the temperature of a pilot cell in each battery shall be measured and recorded.

4-42 Amendment No. ~' ~' .f.G2.,

ATTACHMENT 2 Consumers Power Company Pali sades Pl ant Docket 50-255 PROPOSED DG TESTING TECHNICAL SPECIFICATIONS EXISTING PAGE WITH PROPOSED CHANGES MARKED

,4,7 EMERGENCY POWER Apel i eabi 1 i ty S~EM PERIODIC TESTS

  • Applies te periedie testiAg aAd surveillaAee requiremeAts ef the emergeAey pm~er system.

Ob.jective Te verify that the emergeAcy pmier system will respeAd premptly aAd preperly

~iheA required.

SpeeifieatieAs 4.7.1 Diesel Generators

a. ~ach diesel geAerater shall be maAually started each meAth aAd demeAstrated te be ready fer leadiAg withiA 10 seeeAds. The sigAal iAitiated te start the diesel shall be varied frem eAe test to aAother to verify that A aAd B startiAg circuits are eperable. The geAerator shall be syAchroAized from the eoAtrol room, aAd loaded to 2400 +100 kW.
1:W::[::::::1:::1gr:1::1:;[:::~1P:~:::~:::1:11:~11:1::;::
b. A test shall be conducted during each refueling outage to demonstrate the overall automatic operation of the emergency power system. The test shall be initiated by a simulated simultaneous loss of normal and standby power sources and a simulated SIS signal. Proper operations shall be verified by bus load shedding and automatic starting of selected motors and equipment to establish that restoration with emerg~ncy power has been accomplished within 30 seconds.
c. Each diesel generator shall be subjected to an inspection, in accordance with procedures prepared in conjunction with the manufacturer's recommendations for this class of standby service, at least once per refueling cycle during plant shutdown. The licensee shall utilize his best efforts to conduct additional major diesel generator inspections and overhauls during shutdown periods.

~1!:~~::b~:~s~m~~~

d.

e. The fuel transfer pumps shall be verified to be operable each month.

4.7.2 Station Batteries

a. Every month, the voltage of each cell (to the nearest 0.01 volt), the specific gravity and the temperature of a pilot cell in each battery shall be measured and recorded.

4-42 Amendment No. :/-3, ~' ~'