2/15/18 Summary of Public Meeting Southern Nuclear Operating Company to Discuss Issues Associated with the Safety Review of Licensing Actions for Vogtle Electric Generating Plant, Units 3 and 4
ML18059A909
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/23/2018
From: Jordan Hoellman
NRC/NRO/DNRL/LB4
To: Jennifer Dixon-Herrity
NRC/NRO/DNRL/LB4
Hoellman J/415-5481
References
Download: ML18059A909 (10)


Text

March 27, 2018 MEMORANDUM TO: Jennifer Dixon-Herrity, Chief Licensing Branch 4 Division of New Reactor Licensing Office of New Reactors FROM: Jordan Hoellman, Project Manager /RA/

Licensing Branch 4 Division of New Reactor Licensing Office of New Reactors

SUBJECT:

SUMMARY

OF A PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY ON FEBRUARY 15, 2018 The U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with Southern Nuclear Operating Company (SNC) on February 15, 2018. The purpose of the meeting was to discuss issues associated with the safety review of licensing actions for SNCs Vogtle Electric Generating Plant (VEGP) Units 3 and 4.

The meeting notice can be found in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML18026A756. The meeting notice is also posted on the NRC public website. Enclosures 1 and 2 are the meeting agenda and attendance list for the meeting, respectively. The other documents referenced during the discussion can be found at the ADAMS Accession Nos. given below:

  • Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Notification (UIN) - ML17332A068 for ITAAC 2.6.03.04b (ITAAC Index No. 602)
  • NRC Question on Request for Additional Information (RAI) Response for Request for Alternative Regarding Counterboring of Class 1 Piping, Components, and - ML18044A089 Fittings with Weld End Transitions (ALT-08)
  • Draft RAI for Request for Alternative Regarding Application of VT-1 Visual Examination Methodology for Preservice Inspection of the Reactor Vessel - ML18037A569 Nozzle Inner Radius Sections (ALT-07)

Summary of Meeting:

On February 15, 2018, staff from the NRC conducted a public meeting with representatives from SNC to discuss issues associated with the safety review of licensing actions for SNCs VEGP Units 3 and 4. Specifically, the meeting discussed (1) the UIN for ITAAC Index No. 602, (2) NRC question regarding the RAI response for ALT-08, (3) draft RAIs for ALT-07, and (4) pre-submittal information regarding a proposed LAR for changes to MCR vestibule vent penetrations.

The first topic discussed was the UIN for ITAAC Index No. 602. The staff stated the UIN is acceptable as-is; however, the staff also said a license amendment was necessary, without including additional context that would be helpful to ensure a mutual understanding. Following the meeting, it was determined that additional discussion would be appropriate at a subsequent public meeting, to clarify the reason why the staff discussed a license amendment, provide the appropriate context, and ensure a complete mutual understanding. The topic was scheduled for discussion again on March 8, 2018.

The second topic discussed was NRCs question regarding the RAI response for ALT-08. The staff noted that in the RAI response to Question 5, it was not clear to the staff that a fatigue evaluation that complies with American Society of Mechanical Engineers (ASME)

Subsection 3200 requirements will be performed for alternate counterbore configurations on these weld joints. SNC noted that an ASME Subsection 3600 fatigue evaluation is done as part of the inservice inspection.

Additionally, SNC clarified that, in response to RAI Question 3, the stress analyses for the AP1000 piping and components are based on satisfying minimum wall thickness required by Code and noted that the fatigue evaluation is done as part of the stress analysis. SNC also clarified that, for counterbores covered by the alternative, the existing stress and counterbore analysis would not need to be changed for new configurations allowed by the alternative because the analyses were based on minimum allowable wall thickness rather than actual wall thickness, and the new configurations would not change the minimum allowable wall thickness.

SNC noted that weld transition configurations would not change and that while the length of the counterbores would change, this factor is not part of the stress/fatigue analysis, and the analyses would not change. SNC stated that stress analysis would have an insignificant change. Additionally, SNC stated that the fatigue analyses on AP1000 weld joints were performed in accordance with ASME Code,Section III, Subarticle 3600. SNC stated that alternate counterbore configurations on weld joints will not result in any impact to piping stress analysis because alternative counterbore configurations on weld joints will be at or above the minimum wall thickness required by ASME Code,Section III. Accordingly, SNC advised that it was not necessary to update the fatigue analyses on weld joints where the alternative will be applied.

The staff stated that they understood the additional information provided by SNC and noted that they would review the information to determine if an additional RAI is necessary to complete the staffs review.

The third topic discussed was draft RAIs for ALT-07. SNC requested clarification regarding the third draft RAI question. The staff noted that the intent of the request was to have SNC demonstrate that the AP1000 is bounded by the operating experience of the operating fleet.

SNC stated that both the AP1000 and the operating fleet meet the objective standard, but they cannot demonstrate that the AP1000 is bounded by the operating experience of the operating

fleet. The staff noted that they understood SNCs response and requested that in the RAI response, SNC provide a contextual understanding of how the AP1000 compares to the operating fleet. SNC noted that they understood the staffs request and that they didnt need additional clarifications on the other draft RAIs. The staff stated that they would evaluate SNCs responses when they are formally submitted.

The fourth topic discussed was pre-submittal information regarding a proposed LAR for changes to MCR vestibule vent penetrations. SNC walked through the pre-submittal presentation, noting that two open pipe penetrations, which are outside of the MCR pressure boundary and pass through the 3-hour fire rated barrier, penetrate the MCR vestibule to provide a passive ventilation through open piping in case of a MCR Emergency Habitability System (VES) actuation. SNC stated that these penetrations must meet the safety-related function of maintaining the MCR at positive pressure relative to surrounding areas, as well as security safeguards and fire protection requirements for the wall and that they propose to use dual inverted inlet piping for these penetrations. SNC discussed the planned additional testing to demonstrate that the use of the dual inverted inlet piping configuration provides an adequate mitigation of the transfer of flame, smoke, and hot gases from passing to the adjacent side of the fire barrier. The staff noted that they understood SNCs proposed LAR, provided comments, and asked clarifying questions about the length of the piping and limiting combustibles near the penetrations. SNC noted that they would address the staffs comments and questions, as necessary, in the formal LAR submittal.

At the end of each topic discussed, there was an opportunity for the public to provide comments and ask questions. There were no comments or questions from members of the public.

Docket Nos.: 052-025 052-026

Enclosure:

As stated cc w/encls: See next page

ML18059A909 NRC-001 OFFICE PM: DNRL/LB4 LA: DNRL/LB4 BC: DNRL/LB4 PM: DNRL/LB4 NAME JHoellman (c) RButler (c) JDixon-Herrity (c) JHoellman (s)

DATE 3/22/18 3/19/18 3/23/18 3/22/18 AGENDA FOR PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION (NRC)

Thursday, February 15, 2018 9:00 a.m. - 10:30 a.m.

PURPOSE: To discuss issues associated with the safety review of licensing actions for Southern Nuclear Operating Companys (SNC) Vogtle Electric Generating Plant (VEGP) Units 3 and 4.

OPEN Time Topic Led By 9:00 a.m. Opening Remarks NRC 9:05 a.m. Discussion of Uncompleted NRC/SNC Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC)

Notification (UIN) for ITAAC 2.6.03.04b (ITAAC Index No. 602) 9:10 a.m. Opportunity for Public Comment PUBLIC/NRC 9:10 a.m. Discussion of NRC question regarding NRC/SNC/Westinghouse the Request for Additional Information (WEC)

(RAI) response for ALT-08 9:25 a.m. Opportunity for Public Comment PUBLIC/NRC 9:25 a.m. Discussion of draft RAIs for ALT-07 NRC/SNC/WEC 9:40 a.m. Opportunity for Public Comment PUBLIC/NRC 9:40 a.m. Discussion of pre-submittal information NRC/SNC/WEC regarding a proposed LAR for changes to main control room vestibule vent penetrations.

10:30 a.m. Opportunity for Public Comment PUBLIC/NRC 10:30 a.m. Adjourn Enclosure 1

PUBLIC MEETING UNITED STATES NUCLEAR REGULATORY COMMISSION Thursday, February 15, 2018 9:00 a.m. - 10:30 a.m.

List of Attendees Name Organization Representing the Nuclear Regulatory Commission Jordan Hoellman NRO/DNRL/LB4 Jennifer Dixon-Herrity NRO/DNRL/LB4 Chandu Patel NRO/DNRL/LB4 Don Habib NRO/DNRL/LB4 Lauren Kent NRO/DCIP/HOIB Michael Spencer OGC Matt Mitchell NRO/DEI/MCB Leslie Terry NRO/DEI/MCB Tuan Le NRO/DEI/MEB John Honcharik

  • NRO/DEI/MCB Antonio Dias NRO/DSRA/SPSB Bob Vettori NRO/DSRA/SPSB Thinh Dinh NRO/DSRA/SPSB Boyce Travis NRO/DSRA/SCVB Representing Industry Neil Haggerty Southern Nuclear Operating Company (SNC)

Wes Sparkman SNC Keith Dorsey SNC Ryan Linebarger SNC Mike Yox

  • SNC Amy Aughtman
  • SNC Corey Thomas
  • SNC Peter LeRoy
  • SNC Mark Wilson
  • SNC Mark Humphries
  • SNC Kevin Durrwachter

Zach Harper

  • WEC Jen Meneely

Name Organization Mark Gray

  • WEC Representing Public Tom Childress

Rob Berg

  • = participated via teleconference Enclosure 2

Vogtle Units 3 & 4 Mailing List (Revised 01/29/2018) cc:

Southern Nuclear Operating Company Mr. Barty Simonton Document Control Coordinator Team Leader 42 Inverness Center Parkway, Bin 237 Environmental Radiation Program Birmingham, AL 35242 Air Protection Branch Environmental Protection Division Office of the Attorney General 4244 International Parkway, Suite 120 40 Capitol Square, SW Atlanta, GA 30354-3906 Atlanta, GA 30334 George B. Taylor, Jr.

Resident Manager 2100 East Exchange Pl Oglethorpe Power Corporation Atlanta, GA 30084-5336 Alvin W. Vogtle Nuclear Plant 7821 River Road Brian H. Whitley Waynesboro, GA 30830 Regulatory Affairs Director Southern Nuclear Operating Company Anne F. Appleby 42 Inverness Center Parkway, BIN B237 Olgethorpe Power Corporation Birmingham, AL 35242 2100 East Exchange Place Tucker, GA 30084 Mr. Michael Yox Site Regulatory Affairs Director County Commissioner Vogtle Units 3 & 4 Office of the County Commissioner 7825 River Road, Bin 63031 Burke County Commission Waynesboro, GA 30830 Waynesboro, GA 30830 Mr. Wayne Guilfoyle Commissioner District 8 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Resident Inspector Vogtle Plant Units 3 & 4 8805 River Road Waynesboro, GA 30830 Page 1 of 3

Vogtle Units 3 & 4 Mailing List Email acchambe@southernco.com (Amy Chamberlian) agaughtm@southernco.com (Amy Aughtman)

ALPUGH@southernco.com (Amanda Pugh) annacom@westinghouse.com (Michael J. Annacone) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)

Bill.Jacobs@gdsassociates.com (Bill Jacobs) bjadams@southernco.com (Brad Adams) bwwaites@southernco.com (Brandon Waites) castelca@westinghouse.com (Curtis Castell) comerj@westinghouse.com (James Comer) crenshjw@westinghouse.com (John Crenshaw) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dgbost@southernco.com (Danny Bost) dlfulton@southernco.com (Dale Fulton) drculver@southernco.com (Randy Culver) durhamdc@westinghouse.com (David Durham) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David) erg-xl@cox.net (Eddie R. Grant) fdhundle@southernco.com (Forrest Hundley) fhwillis@southernco.com (Fred Willis)

G2NDRMDC@southernco.com (SNC Document Control) graysw@westinghouse.com (Scott W. Gray) jadwilli@southernco.com (J.D. Williams) james1.beard@ge.com (James Beard) jannina.blanco@pillsburylaw.com (Jannina Blanco) jantol1dj@westinghouse.com (David Jantosik) jenmorri@southernco.com (Jennifer Buettner)

JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)

John.Bozga@nrc.gov (John Bozga)

Joseph_Hegner@dom.com (Joseph Hegner) jpredd@southernco.com (Jason R. Redd) jranalli@meagpower.org (Jerry Ranalli) jtgasser@southernco.com (Jeff Gasser) karen.patterson@ttnus.com (Karen Patterson) karlg@att.net (Karl Gross) kdfili@southernco.com (Karen Fili)

Page 2 of 3

Vogtle Units 3 & 4 Mailing List kmstacy@southernco.com (Kara Stacy)

KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) lchandler@morganlewis.com (Lawrence J. Chandler) markus.popa@hq.doe.gov (Markus Popa) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)

Melissa.Smith@Hq.Doe.Gov (Melissa Smith)

Michael.Kuca@hq.doe.gov (Michael Kuca) mike.price@opc.com (M.W. Price) mlgraves@southernco.com (Michelle Graves)

MSF@nei.org (Marvin Fertel) myox@southernco.com (Mike Yox) nirsnet@nirs.org (Michael Mariotte)

Nuclaw@mindspring.com (Robert Temple) patriciaL.campbell@ge.com (Patricia L. Campbell)

Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) r.joshi15@comcast.net (Ravi Joshi) rjarrett@southernco.com (Robyn Jarrett)

RJB@NEI.org (Russell Bell)

Ronald.Jones@scana.com (Ronald Jones) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak) sblanton@balch.com (Stanford Blanton)

Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) skauffman@mpr.com (Storm Kauffman) sroetger@psc.state.ga.us (Steve Roetger) stephan.moen@ge.com (Stephan Moen) stephen.burdick@morganlewis.com (Stephen Burdick) tom.miller@hq.doe.gov (Tom Miller)

TomClements329@cs.com (Tom Clements)

Vanessa.quinn@dhs.gov (Vanessa Quinn) vcsummer2n3@gmail.com (Brian McIntyre) wasparkm@southernco.com (Wesley A. Sparkman) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver) x2gabeck@southernco.com (Gary Becker) x2kmseib@southernco.com (Kristin Seibert)

Page 3 of 3