|
---|
Category:Letter
MONTHYEARL-24-247, Davis-Nesse Nuclear Power Station, Unit 1 - License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2025-02-26026 February 2025 Davis-Nesse Nuclear Power Station, Unit 1 - License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control L-25-021, Response to Request for Confirmatory Information Regarding the IR23 Steam Generator Tube Inspection Report2025-02-12012 February 2025 Response to Request for Confirmatory Information Regarding the IR23 Steam Generator Tube Inspection Report ML25043A0742025-02-11011 February 2025 Response to Request for Confirmatory Information Regarding the IR23 Steam Generator Generator Tube Inspection Report IR 05000346/20240042025-01-24024 January 2025 Integrated Inspection Report 05000346/2024004 ML24361A0042025-01-17017 January 2025 Issuance of Amendment No. 307 Regarding Removal of Table of Contents from the Technical Specifications ML24352A1242024-12-19019 December 2024 Response to Request to Reschedule Davis-Besse Nuclear Power Station Triennial U.S. Nuclear Regulatory Commission-Evaluated Force-On-Force Inspection L-24-233, Proposed Alternative Request to Defer ASME Code Section XI Inservice Inspection Examinations for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-12-18018 December 2024 Proposed Alternative Request to Defer ASME Code Section XI Inservice Inspection Examinations for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles L-24-259, ISFSI; Davis-Besse Nuclear Power Station, Unit No. 1 ISFSI & Perry Nuclear Power Plant, Unit No. 1 ISFSI - Triennial ISFSI Decommissioning Funding Plan2024-12-17017 December 2024 ISFSI; Davis-Besse Nuclear Power Station, Unit No. 1 ISFSI & Perry Nuclear Power Plant, Unit No. 1 ISFSI - Triennial ISFSI Decommissioning Funding Plan 05000346/LER-2021-001-02, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-12-0909 December 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground IR 05000346/20240102024-12-0606 December 2024 Comprehensive Engineering Team Inspection Report 05000346/2024010 L-24-227, Response to Request for Additional Information for Relief Request RR-A 12024-11-20020 November 2024 Response to Request for Additional Information for Relief Request RR-A 1 IR 05000346/20244022024-11-19019 November 2024 Material Control and Accounting Program Inspection Report 05000346/2024402 (Public) IR 05000346/20240032024-11-14014 November 2024 Integrated Inspection Report 05000346/2024003 ML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components ML24338A0242024-10-0303 October 2024 MPR Associates, Inc. - Report in Accordance with 10 CFR Part 21 IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 ML24108A0382024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions 2025-02-26
[Table view] Category:License-Operator
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24045A0722024-02-14014 February 2024 Form 5.1-1 Post Examination Check Sheet IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 ML24045A0702024-01-29029 January 2024 Form 1.3-1 Examination Security Agreement-Post Examination ML24045A0712024-01-29029 January 2024 Form 2.1-1 Examination Prep Checklist L-24-029, Post-Exam Package Cover Letter2024-01-25025 January 2024 Post-Exam Package Cover Letter ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 ML24045A0382023-12-14014 December 2023 Form 2.3-4 Written Exam Quality Checklist ML24045A0152023-12-14014 December 2023 Form 2.3-1 Exam Outline Quality Checklist for Davis-Besse ML24045A0162023-12-14014 December 2023 Form 3.4-1 Events and Evolutions Checklist for Davis-Besse ML24045A0342023-12-14014 December 2023 Form 2.3-2 Operating Test Quality Checklist ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination IR 05000346/20223012022-04-12012 April 2022 NRC Initial License Examination Report 05000346/2022301 ML22108A2442022-02-24024 February 2022 Ile ES-201-2 ML22116A1892022-02-24024 February 2022 Scenarios As-Administered ML22115A1762022-02-24024 February 2022 Ile Proposed Exam Submittal Letter L-21-267 ML22131A2132022-02-24024 February 2022 Ile Outline Review Comments and Resolutions ML22131A1942022-02-24024 February 2022 Ile ES-301-7 ML22115A1552022-02-24024 February 2022 Ile ES-401-2 and ES-401-3 ML22108A2492022-02-24024 February 2022 Ile Forms ES-301-5 ML22116A1932022-02-24024 February 2022 Written Exam As-Administered ML22116A1912022-02-24024 February 2022 Walkthrough Portion JPMs As-Administered ML22108A2412022-02-24024 February 2022 Ile ES-201-2 NRC Written Outline Only ML22118A3302022-02-24024 February 2022 Ile ES-201-1 ML22116A0462022-02-24024 February 2022 Ile ES-401-6 ML22115A1732022-02-24024 February 2022 Ile ES-301-3 ML22115A1532022-02-24024 February 2022 Ile ES-301-2 ML22108A2512022-02-24024 February 2022 Ile Outline Submittal Letter L-21-219 L-22-061, Ile Post Exam Letter L-22-0612022-02-24024 February 2022 Ile Post Exam Letter L-22-061 ML22116A0612022-02-24024 February 2022 Ile Proposed Written Exam ML22115A1572022-02-24024 February 2022 Ile Forms ES-D-1 ML22131A2112022-02-24024 February 2022 Ile ES-401-4 ML22131A2042022-02-24024 February 2022 Ile ES-401-9 ML22118A7952022-02-24024 February 2022 Ile Forms ES-201-3 ML22115A1492022-02-24024 February 2022 Ile ES-301-1 ML22116A0592022-02-24024 February 2022 Ile Proposed Exam Scenarios ML22116A0572022-02-24024 February 2022 Ile Proposed Exam JPMs ML22027A5092022-01-27027 January 2022 Operator Licensing Examination Approval ML21181A4052021-07-0101 July 2021 Confirmation of Initial License Examination IR 05000346/20213012021-03-15015 March 2021 NRC Initial License Examination Report 05000346/2021301 ML21137A2232021-02-18018 February 2021 ES-401-2 3 ML21137A3202021-02-18018 February 2021 ES-403-1 ML21137A3412021-02-18018 February 2021 Admin JPM ML21137A2812021-02-18018 February 2021 ES-401-6 ML21137A2992021-02-18018 February 2021 Proposed Written Exam ML21137A2192021-02-18018 February 2021 ES-301-2 ML21137A2262021-02-18018 February 2021 ES-D-1 ML21137A2112021-02-18018 February 2021 ES-301-1 ML21137A3342021-02-18018 February 2021 ES-401-9 ML21137A2942021-02-18018 February 2021 Proposed in Plant JPMs 2024-02-02
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, ILLINOIS 60532-4352 January 31, 2018 Mr. Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Co.
Davis-Besse Nuclear Power Station 5501 N. State Rte. 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL
Dear Mr. Bezilla:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at your Davis-Besse Nuclear Power Station.
The U.S. Nuclear Regulatory Commission has approved the subject examinations and you may administer the written examinations in accordance with Revision 11, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, during the week of February 12, 2018.
The U.S. Nuclear Regulatory Commission staff will administer the operating tests during the weeks of February 5, 2018, and February 12, 2018. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility.
Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9834.
Please contact your Chief Examiner, Mr. Randal Baker, at 630-829-9871, if you have any questions or identify any errors or changes in the license level (Reactor Operator or Senior Reactor Operator) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Sincerely,
/RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV Mr. Jeffrey D. Cuff, Training Manager
Letter to Mark B. Bezilla from Robert J. Orlikowski dated January 31, 2018
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL DISTRIBUTION:
Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado Colleen Schmidt ADAMS Accession Number: ML18031A944 OFFICE RIII RIII RIII RIII NAME CSchmidt:cl RBaker ROrlikowski DATE 01/29/18 01/29/18 01/31/18 OFFICIAL RECORD COPY