NUREG-1021, Revision 11 Rev 0 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Nuclear Power Station Date of Examination: 2/7/2022 to 2/18/2022 Exam Level: RO SRO(I) SRO(U)
Operating Test No.: DB1LOT22 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)
System / JPM Title Type Code*
Safety Function S1 Emergency Borate the RCS (NEW)
N, A, E 1
S2 Transfer LPI suctions to the Emergency Sump (JPM291)
D, A, EN, E, L
2 S3 Perform Boron equalization between Pressurizer and the Reactor Coolant System (JPM275)
D, A 3
S4 Trip Main Turbine IAW DB-OP-02015 15-2-E (NEW)
N, A, E 4S S5 Add water to RCS from BWST (MOD JPM187)
M, E, L 4P S6 Establish CTMT Closure IAW OP6904 Shutdown Ops (JPM219)
D, E, EN, L 5
S7 Failed NI, DB-OP-02505 Step 4.1.9 (NEW)
N, E 7
S8 Start CTMT purge IAW DB-OP-06503, Section 3.3 (JPM015)
D 8
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
P1 Deenergize the Control Rod Drive in accordance with Step 3.3 of DBOP02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture (JPM042)
D, E 1
P2 Perform an emergency shutdown of EDG, IAW section 5.4 of DB-OP-06316, Diesel Generator Operating Procedure (JPM115)
D, A 6
P3 Place the HPI alt min recirc flow path in service per Att 14 of OP2000 (JPM226)
D, E, R 2
All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / > 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3/ 3 / 2 (randomly selected) 1 / 1 / 1
NUREG-1021, Revision 11 Rev 0 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Nuclear Power Station Date of Examination: 2/7/2022 to 2/18/2022 Exam Level: RO SRO(I) SRO(U)
Operating Test No.: DB1LOT22 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)
System / JPM Title Type Code*
Safety Function S1 Emergency Borate the RCS (NEW)
N, A, E 1
S2 Transfer LPI suctions to the Emergency Sump (JPM291)
D, A, EN, E, L
2 S3 Perform Boron equalization between Pressurizer and the Reactor Coolant System (JPM275)
D, A 3
S4 Trip Main Turbine IAW DB-OP-02015 15-2-E (NEW)
N, A, E 4S S5 Add water to RCS from BWST (MOD JPM187)
M, E, L 4P S6 Establish CTMT Closure IAW OP6904 Shutdown Ops (JPM219)
D, E, EN, L 5
S7 Failed NI, DB-OP-02505 Step 4.1.9 (NEW)
N 7
S8 Start CTMT purge IAW DB-OP-06503, Section 3.3 (JPM015)
D 8
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
P1 Deenergize the Control Rod Drive in accordance with Step 3.3 of DBOP02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture (JPM042)
D, E 1
P2 Perform an emergency shutdown of EDG, IAW section 5.4 of DB-OP-06316, Diesel Generator Operating Procedure (JPM115)
D, A 6
P3 Place the HPI alt min recirc flow path in service per Att 14 of OP2000 (JPM226)
D, E, R 2
All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / > 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3/ 3 / 2 (randomly selected) 1 / 1 / 1
NUREG-1021, Revision 11 Rev 0 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis-Besse Nuclear Power Station Date of Examination: 2/7/2022 to 2/18/2022 Exam Level: RO SRO(I) SRO(U)
Operating Test No.: DB1LOT22 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)
System / JPM Title Type Code*
Safety Function S1 Emergency Borate the RCS (NEW)
N, A, E 1
S2 Transfer LPI suctions to the Emergency Sump (JPM291)
D, A, EN, E, L
2 S3 Perform Boron equalization between Pressurizer and the Reactor Coolant System (JPM275)
D, A 3
S4 Trip Main Turbine IAW DB-OP-02015 15-2-E (NEW)
N, A, E 4S S5 Add water to RCS from BWST (MOD JPM187)
M, E, L 4P S6 Establish CTMT Closure IAW OP6904 Shutdown Ops (JPM219)
D, E, EN, L 5
S7 Failed NI, DB-OP-02505 Step 4.1.9 (NEW)
N, E 7
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
P1 Deenergize the Control Rod Drive in accordance with Step 3.3 of DBOP02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture (JPM042)
D, E 1
P2 Perform an emergency shutdown of EDG, IAW section 5.4 of DB-OP-06316, Diesel Generator Operating Procedure (JPM115)
D, A 6
P3 Place the HPI alt min recirc flow path in service per Att 14 of OP2000 (JPM226)
D, E, R 2
All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / > 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3/ 3 / 2 (randomly selected) 1 / 1 / 1
NUREG-1021, Revision 11 Rev 0 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis-Besse Nuclear Power Station Date of Examination: 2/7/2022 to 2/18/2022 Exam Level: RO SRO(I) SRO(U)
Operating Test No.: DB1LOT22 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)
System / JPM Title Type Code*
Safety Function S1 Emergency Borate the RCS (NEW)
N, A, E 1
S2 Transfer LPI suctions to the Emergency Sump (JPM291)
D, A, EN, E, L
2 S3 Perform Boron equalization between Pressurizer and the Reactor Coolant System (JPM275)
D, A 3
S4 Trip Main Turbine IAW DB-OP-02015 15-2-E (NEW)
N, A, E 4S S5 Add water to RCS from BWST (MOD JPM187)
M, E, L 4P S6 Establish CTMT Closure IAW OP6904 Shutdown Ops (JPM219)
D, E, EN, L 5
S7 Failed NI, DB-OP-02505 Step 4.1.9 (NEW)
N 7
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
P1 Deenergize the Control Rod Drive in accordance with Step 3.3 of DBOP02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture (JPM042)
D, E 1
P2 Perform an emergency shutdown of EDG, IAW section 5.4 of DB-OP-06316, Diesel Generator Operating Procedure (JPM115)
D, A 6
P3 Place the HPI alt min recirc flow path in service per Att 14 of OP2000 (JPM226)
D, E, R 2
All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / > 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3/ 3 / 2 (randomly selected) 1 / 1 / 1
NUREG-1021, Revision 11 Rev 0 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis-Besse Nuclear Power Station Date of Examination: 2/7/2022 to 2/18/2022 Exam Level: RO SRO(I) SRO(U)
Operating Test No.: DB1LOT22 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)
System / JPM Title Type Code*
Safety Function S4 Trip Main Turbine IAW DB-OP-02015 15-2-E (NEW)
N, A, E 4S S6 Establish CTMT Closure IAW OP6904 Shutdown Ops (JPM219)
D, E, EN, L 5
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
P1 Deenergize the Control Rod Drive in accordance with Step 3.3 of DBOP02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture (JPM042)
D, E 1
P2 Perform an emergency shutdown of EDG, IAW section 5.4 of DB-OP-06316, Diesel Generator Operating Procedure (JPM115)
D, A 6
P3 Place the HPI alt min recirc flow path in service per Att 14 of OP2000 (JPM226)
D, E, R 2
All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / > 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3/ 3 / 2 (randomly selected) 1 / 1 / 1
NUREG-1021, Revision 11 Rev 0 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis-Besse Nuclear Power Station Date of Examination: 2/7/2022 to 2/18/2022 Exam Level: RO SRO(I) SRO(U)
Operating Test No.: DB1LOT22 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)
System / JPM Title Type Code*
Safety Function S4 Trip Main Turbine IAW DB-OP-02015 15-2-E (NEW)
N, A, E 4S S6 Establish CTMT Closure IAW OP6904 Shutdown Ops (JPM219)
D, E, EN, L 5
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
P1 Deenergize the Control Rod Drive in accordance with Step 3.3 of DBOP02000, RPS, SFAS, SFRCS Trip or SG Tube Rupture (JPM042)
D, E 1
P2 Perform an emergency shutdown of EDG, IAW section 5.4 of DB-OP-06316, Diesel Generator Operating Procedure (JPM115)
D, A 6
P3 Place the HPI alt min recirc flow path in service per Att 14 of OP2000 (JPM226)
D, E, R 2
All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / > 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3/ 3 / 2 (randomly selected) 1 / 1 / 1