L-24-029, Post-Exam Package Cover Letter

From kanterella
Jump to navigation Jump to search
Post-Exam Package Cover Letter
ML24045A068
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/25/2024
From: Tony Brown
Energy Harbor Nuclear Corp
To: Gregory Roach
NRC/RGN-III
Greg Roach
Shared Package
ML22251A151 List:
References
L-24-029
Download: ML24045A068 (1)


Text

.a energy

~ harbor Davis-Besse Nuclear Power Sta tio n 5501 N. State Route 2 Oak H a r bor, Ohio 43449 Terry J. Br own 4 19-321-7676 Site Vice Pr eside nt, Da v is-Besse N uclear

January 25, 2024 10 CFR 55

L-24-029

Mr. Greg Roach Senior Operations Engineer U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352

Subject:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Submittal of Post Examination Materials in Support of Recently Completed Initial License Operator Examinations

Enclosed is a list of the post examination materials that are being submitted electronically for the initial licensed operator examinations that were administered during the weeks of January 8 and 15, 2024 at the Davis-Besse Nuclear Power Station (DBNPS).

The listed items are being submitted to the NRC for review and approval in accordance with 10 CFR 55.40, "Written Examinations and Operating Tests - Implementation" and NUREG-1021, Operator Licensing Examination Standards for Power Reactors (Revision 12).

After the Written Examination was completed, the Applicants participated in a review session to determine if enhancements to the questions were necessary. Results of this review indicate no enhancements are required prior to reuse. During the exam review, the applicants provided no substantive comments.

Post Examination analysis indicates potential generic training program weaknesses (Questions missed by 50 percent or more of the Applicants; Questions 6 and 13).

Investigations of these potential generic weaknesses are being tracked by the DBNPS Corrective Action Program (CR-2024-00474).

Davis-Besse Nuclear Power Station, Unit 1 L-24-029 Page 2 of 2

No changes were made while administering and grading the examination. Mr. Kyle P.

Turco, Exam Facility Reviewer, has confirmed the quality of the grading and he concurs with the individual and collective examination results.

There are no regulatory commitments included in the submittal. Please withhold all exam material from public record for a period of two years. If there are any questions or if additional information is required, please contact Mr. David S. Witt, Superintendent -

Nuclear Operations Training, at (419) 321-7432.

GMW

Enclosure:

Post Examination Items Being Submitted Electronically

cc: Regional Administrator, NRC Region Ill Chief, Operations Branch, NRC Region Ill DB-1 NRC/NRR Senior Project Manager DB-1 Senior Resident Inspector USNRC Document Control Desk Utility Radiological Safety Board Enclosure

L-24-029

Davis-Besse Nuclear Power Station, Unit 1

Post Examination Items Being Submitted Electronically

The following post examination items are being submitted electronically to the NRC via the file sharing method previously created by the NRC to support this exam :

1. Cover and Answer Sheets a. Form 4.2-3, Reactor Operator Written Examination Cover Sheets b. Form 4.2-4, Senior Reactor Operator Written Examination Cover Sheets
c. The Applicant's answer sheets (graded copies and one clean copy)

2. The written examination

3. Answer key

4. Questions asked by the Applicants during the administration of the examination,

and the Proctor's responses to those questions

5. The Written Examination Seating Chart

6. Copy of Condition Report CR-2024-00474, Initial License training program potential generic weaknesses

7. Examination Statistics

8. Form 1.3-1, Examination Security Agreement, will be forwarded to the NRC chief examiner as soon as possible, when all post examination signatures have been obtained.