ML22115A157

From kanterella
Jump to navigation Jump to search
Ile Forms ES-D-1
ML22115A157
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/24/2022
From: Chuck Zoia
NRC/RGN-III/DRS/OLB
To:
FirstEnergy Nuclear Operating Co
Zoia C
Shared Package
ML20140A252 List:
References
Download: ML22115A157 (3)


Text

Appendix D Scenario Outline Form ES-D-1

Facility: Davis-Besse Scenario No. 1 Op Test No.: DB1LOT22

Examiners: Operators: SRO ATC BOP

Initial Conditions: 100% Power

Turnover: Maintain 100% Power

Planned: Shift Routines

Critical tasks:

1. Close the Pressurizer Spray Valve and PORV Block Valve
2. Restore RCP Seal Return

Event Malf. Event Type* Event No. No. Description

1 (N) ATC Place Purification Demin 3 I/S per Chemistry request 2 (I) ATC Leaking Power Operated Relief Valve (PORV) (TS) 3 (C) BOP Trip TPCW Pump 1 Hi Bearing Temp / Start STBY pump

4 Inverter YV1 DC input failure (TS)

5 (R) ATC/(C) BOP TPCW Pump 2 trips / Lower power to capacity of 1 pump

6 Major Steam Leak in CTMT / Trip Reactor 7 (C) BOP AFP 1 Trips - Start the MDFP

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

NUREG-1021, Revision 11 Page 1 of 22 Appendix D Scenario Outline Form ES-D-1

Facility: Davis-Besse Scenario No.: 2 Op Test No.: DB NRC 2022

Examiners: Operators: SRO ATC BOP

Initial Conditions: 100% Power

Turnover: Maintain 100% Power

Planned: Shift routines

Critical tasks:

1. Shutdown Reactor - ATWS
2. Isolate Overcooling Steam Generators

Event Malf. Event Type* Event No. No. Description

1 (C) ATC Weekly Run of the Standby Makeup Pump 2 Oil Pumps (TRM)

2 (C) BOP Main Feedwater Pump Turbine 1 High Drain Tank Level 3 (C) BOP Swap SFP Pumps due to high bearing temp/vibration 4 (R) ATC / BOP Dropped Control Rod - Reduce Reactor Power (TS) 5 Major Main Generator Lockout - ATWS

6 (C) BOP Stuck Open Main Steam Safety Valve - Overcooling

7 (C) BOP Steam Feed Rupture Control System fails to automatically align for a low pressure trip on Steam Generator 1

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

NUREG-1021, Revision 11 Page 1 of 20 Appendix D Scenario Outline Form ES-D-1

Facility: Davis-Besse Scenario No.: 3 Op Test No.: DB NRC 2022

Examiners: Operators: SRO ATC BOP

Initial Conditions: 60% Power

Turnover: Shutdown Main Feedwater Pump1 to 1000 RPM Auxiliary Feedwater Pump 1 Out of Service

Planned: Complete the Shutdown of Main Feedwater Pump 1

Critical tasks:

1. Trip all 4 RCPs
2. Initiate High Pressure Injection Cooling

Event Malf. Event Type* Event No. No. Description

1 (N) BOP Remove Main Feedwater Pump 1 from service 2 (C) ATC / BOP Component Cooling Water Pump 2 Trips (TS) 3 Bus F7 Failure / Motor Driven Feedwater Pump Inop (TS)

4 (C) BOP Station Air Compressor 2 setpoint failure - Low air header pressure

5 (R) ATC Rising Main Condenser Pressure - Reduce Reactor Power (C) BOP Trip the Main Generator

6 Major Trip the Reactor - Initiate / Isolate Steam Feedwater Rupture Control system

Auxiliary Feedwater Pump 2 Trips - Emergency Feedwater 7 (C) ATC/BOP Pump does not start - Loss of All Feedwater Standby Makeup Pumps fails to start - Makeup / High Pressure Injection / PORV Cooling

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

NUREG-1021, Revision 11 Page 1 of 18