Appendix D Scenario Outline Form ES-D-1 Facility: Davis-Besse Scenario No.: 1 Op Test No.: DB NRC 2021 Examiners: Operators: SRO ATC BOP Initial Conditions:
Approximately 2% power MDFP in service MFP 2 running with no load on it, ICS control in HAND Turnover:
Plant was shut down to repair a small RCS Leak Reactor Power currently at approximately 2%
Plant startup per DB-OP-06901, complete through Step 3.24 Mode 1 checklist is complete Planned:
Continue a plant startup per DB-OP-06901, starting at Step 3.25 Place MFP 2 in service and shutdown the MDFP Raise Reactor power to 4% in preparation for Mode change Critical tasks:
- 1. Trip All Reactor Coolant Pumps (CT-1)
- 2. Initiate LPI and cross-tie injection lines (CT-4)
Event Malf. Event Type* Event No. No. Description 1 N-BOP/SRO Transfer from Motor Driven Feed Pump to MFP 2 2 R-ATC/SRO Raise power to 4%
3 C-BOP/SRO CAC 2 high bearing temperature (TS) 4 I-ATC/SRO PZR Level Temp Comp Inst Fails Low 5 C-BOP/SRO SW Pump Trip (TS), CT2955 fails to Auto Open 6 M-All Large Break LOCA/Reactor Trip/LSCM 7 C-ATC/SRO LPI pump 2 fail to start - cross connect LPI
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor NUREG-1021, Revision 11 Page 1 of 21
Appendix D Scenario Outline Form ES-D-1 Facility: Davis-Besse Scenario No.: 2 Op Test No.: DB1LOT21 Examiners: Operators: SRO ATC BOP Initial Conditions:
93% Power
Reactor Power is at 93% power in preparation to stop #1 Condensate Pump Planned:
Stop Condensate Pump 1 for planned PMs Restore #1 EDG to service when maintenance is complete Critical tasks:
- 1. Restore RCP Seal Return (CT-B)
- 2. Electrical Power Alignment (CT-8)
Event Malf. Event Type* Event No. No. Description 1 N-BOP/SRO Stop Condensate Pump 1 2 I-ATC/BOP/SRO RCS Press NNI input fails low (TS) 3 C-BOP/SRO Circ Pump high stator temperature 4 C-ATC/SRO MU38, RCP Seal Return fails Closed (TS) 5 R-ATC/SRO Small RCS Leak (~275 gpm) into CTMT (TS) 6 M-ALL Loss of Offsite Power/Loss of SCM 7 C-ATC/BOP/SRO EDG 2 trips/HPI fails to Auto start
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor NUREG-1021, Revision 11 Page 1 of 17