ML21137A226

From kanterella
Jump to navigation Jump to search
ES-D-1
ML21137A226
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/18/2021
From: Gregory Roach
NRC/RGN-III/DRS/OLB
To:
FirstEnergy Nuclear Operating Co
Roach G
Shared Package
ML20136A251 List:
References
L-20-236
Download: ML21137A226 (2)


Text

Appendix D Scenario Outline Form ES-D-1 NUREG-1021, Revision 11 Page 1 of 21 Facility:

Davis-Besse Scenario No.:

1 Op Test No.:

DB NRC 2021 Examiners:

Operators:

SRO ATC BOP Initial Conditions:

Approximately 2% power

MDFP in service

MFP 2 running with no load on it, ICS control in HAND Turnover:

Plant was shut down to repair a small RCS Leak

Reactor Power currently at approximately 2%

Plant startup per DB-OP-06901, complete through Step 3.24

Mode 1 checklist is complete Planned:

Continue a plant startup per DB-OP-06901, starting at Step 3.25

Place MFP 2 in service and shutdown the MDFP

Raise Reactor power to 4% in preparation for Mode change Critical tasks:

1.

Trip All Reactor Coolant Pumps (CT-1) 2.

Initiate LPI and cross-tie injection lines (CT-4)

Event No.

Malf.

No.

Event Type*

Event Description 1

N-BOP/SRO Transfer from Motor Driven Feed Pump to MFP 2 2

R-ATC/SRO Raise power to 4%

3 C-BOP/SRO CAC 2 high bearing temperature (TS) 4 I-ATC/SRO PZR Level Temp Comp Inst Fails Low 5

C-BOP/SRO SW Pump Trip (TS), CT2955 fails to Auto Open 6

M-All Large Break LOCA/Reactor Trip/LSCM 7

C-ATC/SRO LPI pump 2 fail to start - cross connect LPI (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 NUREG-1021, Revision 11 Page 1 of 17 Facility:

Davis-Besse Scenario No.:

2 Op Test No.:

DB1LOT21 Examiners:

Operators:

SRO ATC BOP Initial Conditions:

93% Power

  1. 1 EDG is OOS for maintenance Turnover:

Reactor Power is at 93% power in preparation to stop #1 Condensate Pump Planned:

Stop Condensate Pump 1 for planned PMs Restore #1 EDG to service when maintenance is complete Critical tasks:

1.

Restore RCP Seal Return (CT-B) 2.

Electrical Power Alignment (CT-8)

Event No.

Malf.

No.

Event Type*

Event Description 1

N-BOP/SRO Stop Condensate Pump 1 2

I-ATC/BOP/SRO RCS Press NNI input fails low (TS) 3 C-BOP/SRO Circ Pump high stator temperature 4

C-ATC/SRO MU38, RCP Seal Return fails Closed (TS) 5 R-ATC/SRO Small RCS Leak (~275 gpm) into CTMT (TS) 6 M-ALL Loss of Offsite Power/Loss of SCM 7

C-ATC/BOP/SRO EDG 2 trips/HPI fails to Auto start (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor