ML17223A195

From kanterella
Jump to navigation Jump to search
Advises That Commitment Date for Implementing Emergency Operating Procedures Extended to 891031 Due to Rev & Validation Process & Training on Revs to Requalification Program,Per Insp Repts 50-335/88-08 & 50-389/88-08
ML17223A195
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/12/1989
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-210, NUDOCS 8906190077
Download: ML17223A195 (4)


Text

AC CELE PATED D 1 STKBLn ON DEMONSTRATION SYSTEM

'.i li.-

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CESSION NBR:8906190077 DOC.DATE: 89/06/12 NOTARIZED: YES DOCKET g ACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION WOODY,C.O. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Extends commitment date for correcting discrepancies &

deviations noted in IRs 50-335,389/88-08 to 891031.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR t ENCL G SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR E CL ID CODE/NAME LTTR ENCL PD2-2 PD 1 NORRIS,J INTERNAL: ACRS AEOD AEOD/DEIIB AEOD/TPAD DEDRO NRR SHANKMAN,S NRR/DEST DIR NRR/DOEA DIR NRR/DREP/RPB 10 ll NRR/DLPQ/PQEB NRR/DREP/EPB 10 NRR/PMAS/ILRB12 NUDOCS-ABSTRACT O~I-E BEE~~V OGC/HDS2 EG FILE 02~

RGN2 FILE 01 TERNAL: LPDR NRC PDR NSIC R

I D

D NaIK 10 ALL RIDS RECIPIENTS ~

S PIEASE HELP US 'IQ REDUCE WASTE! (XNZACJ! 'IHE DOCUKKI'DNIBDLDESK, BDCN Pl-37 (EXT. 20079) KO XZZHZNLTB RÃ3R NME PKH DISTRIKlTION LISTS FOR DOCUMEMIS YOU DON'T NEEDf TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL

l il'

P.O. Box14000,Juno Beach,FL 33408 0420 JUNE 1 2 L989 L-89-210 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: St. Lucie Unit 1 and 2 Docket Nos. 50-335 and 50-389 Extension of Commitment Date Ins ection Re ort 88-08 Gentlemen:

NRC Inspection Report 50-335/88-08 listed the following four Inspector Follow-Up Items (IFIs) as a result of the inspection in the area of Emergency Operating Procedures (EOPs).

IFI 389/88-08-01 Correction of technical discrepancies contained in EOPs IFI 389/88-08-02 Correction of discrepancies noted during plant walkdowns IFI 389/88-08-03 Correction of lesson plans and completion of EOP training when EOPs revised IFI 389/88-08-04 Correction of human factors discrepancies contained in EOPs The Inspection Reports also identified the two following deviations.

Deviation A CEN-152 specifies an RCP NPSH curve in a. figure entitled "Typical Post-accident Pressure-Temperature Limits", which was included in many sections of the guidelines. The St. Lucie EOPs, with few exceptions, did not include the RCP NPSH requirements.

Deviation B The licensee failed to (1) provide information on the assumptions used to adapt the generic guidelines to the St. Lucie Plant, (2) provide a description of how the St. Lucie plants differ from the generic plant, and (3) provide the technical basis and/or justification for significant differences between the generic guidelines (CEN-152) and the St. Lucie procedure generation package.

GRMIR88 08

+906i 9pp77 89p612 ADOCK pr=ppp335 pDR pDC 9 ~~p(

an FPL Group company i)o

U. S. Nuclear Regulatory Commission L-89-210 Page 2 The EOPs are currently undergoing revision to be in accordance with CEN 152 Revision 3, Combustion Engineering Emergency Procedure Guidelines. Florida Power & Light committed to incorporate the IFIs and correct the deviations during the revision process, which was scheduled for completion on June 30, 1989. FPL will not be able to meet the commitment date and requests an extension.

The extension is requested because the original assessment underestimated the scope of the project. The magnitude of the revisions was far more extensive than realized. The experience gained in simulator validation of major revisions involving EOPs 9, 10, and 15 pointed out a clear need and benefit to validate EOPs 1, 2, 3, 4, 5, and 6 which was not included in the original assessment.

The revision and validation process, coupled with the training of licensed and non-licensed operators through the requalification program on the new revisions, requires an extension of the original EOP implementation date from June 30, 1989 to a new date of 1989. This new date also coincides with the completion of October'1, Licensed Operator Requalification Session 89-04, which will complete training on the new revisions.

Very truly yours, C. O. Woody p

Acting Senior Vice President Nuclear COW/GRM/cm cc: Stewart D. Ebneter, Regional Administrator, Region Resident Inspector, USNRC, St. Lucie Plant II, USNRC GRMIR8808