Forwards Response Schedule Re Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment.
ML17222A635
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/27/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GL-88-14, L-88-539, NUDOCS 8901030330
Download: ML17222A635 (3)


Text

. -<CCZ1ZMTED DIFIRIBUZON DEME STRXTION SYSTEM REGUDAT+ INFORMATION "DZSTRZBUTZOtYSTEM (RZDS)

ACCESSION NBR:8901030330 DOC.DATE: 88/12/27 NOTARIZED: NO DOCKET FACIL'!50-335 St. Lucie Plant, Unit 1, Florida Power a Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389

.AUTH. NAME AUTHOR AFFILIATION CONWAYFW.F. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards response schedule re Generic Ltr 88-14, "Instrument Air Supply Sys Problems Affecting Safety-Related Equipment."

DISTRIBUTION CODE: A001D TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution l ENCL ~ SIZE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 2 2 h NORRIS,J 1 1 INTERNAL: ACRS 6 6 ARM/DAF/LFMB 1 0 NRR/DEST/ADS 7E 1 1 NRR/DEST/CEB 8H 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/MTB '9H 1 1 NRR/DEST/RSB 8E 1 1 NRR/DEST/SICB 1 1 NRR/DOEA/TSB 11 1 1 NRR/PMAS/ILRB12 1 1 NUDOCS-ABSTRACT 1 1 , OGC/HDS2 1 0 Q~GF I L 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 R

NOIR 'IO ALL 'KIDS" RECIPIENXS:.

PIZASE HELP US 10 REDUCE RMBBEi CXRZACZ 'IHE DOCUMEÃ1'ON'HRL DESKF ROON P1-37 (EXT. 20079) TO EZZMZNATE KKR NAME FRCH DISTEGBUTIGN LISTS MR DOCUK MZS KRJ DON'T HEEDf TOTAL NUMBER OF COP1ES REQUIRED:. LTTR'6 ENCL 23

P.O. Box14000, Juno Beach, FL 33408-0420

'"-"~MRI:g C 7 1989 L-88-539 10 CFR 50.54(f)

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Instrument Air Supply System Problems Affecting Safet -Related E ui ment Generic Letter 88-14 Florida Power & Light Company (FPL) has received the subject Generic Letter (GL) dated August 8, 1988, and is taking action and performing verification requested by it. Due to outage schedules and pre-planned hardware modification, FPL will not respond to the GL by its February 19, 1989, due date. FPL's detailed schedule for response is attached.

This response schedule has been discussed with the NRC staff.

Please contact us if you have any questions about this schedule.

Very truly yours, W. F. Conway Senior Vice President - Nuclear WFC/EJW/cm Attachment cc: Malcolm L. Ernst, Acting Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 8901030330 88i227 PDR ADOCK 05000335 P PNU EWGL8814 an FPL Group company

Res onse Schedule St. Lucie Units 1 and 2 Generic Letter 88-14 Instrument Air Supply System Problems Affecting Safety-Related Equipment Item 1 Verification by test that actual instrument air quality is consistent with the manufacturer's recommendation for individual components served.

Complete Response June 30, 1989 Item 2. Verification that maintenance practices, emergency procedures, and training are adequate to ensure that safety-related equipment will function as intended on loss of instrument air.

Complete Response March 15, 1989 Item 3. Verification that the design of the entire instrument air system including air or other pneumatic accumulators is in accordance with its intended function....

Complete Response March 15, 1989

.... including verification by test that air-operated safety-related components will perform as expected in accordance with all design-basis events, including a loss of the normal instrument air system....

Conduct complete valve testing and integrated loss of air test (as and if required)

St. Lucie Unit 1: May 1990 (projected)

St. Lucie Unit 2: December 1990 (projected)

....This design verification should include an analysis of current air operated component failure positions to verify that they are correct for assuring required safety functions.

Complete Response March 15, 1989 Item. In addition to the above, each licensee/applicant should provide a discussion of their program for maintaining proper instrument air quality.

Complete Response March 15, 1989 EWGL8814