Responds to Violations Noted in Insp Repts 50-335/87-31 & 50-389/87-30.Corrective Action:Inverter 1MD Restored to Normal Operation,Nonlicensed Operator Counseled & Procedure Re Control of Infrequent Operations Under Development
ML17221A659
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/07/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-88-112, NUDOCS 8803110149
Download: ML17221A659 (5)


Text

AC CELEBRATED DISI'RIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR-88031103.49 DOC.DATE: 88/03/07 NOTARIZED: NO DOCKET ¹ IL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 UTH.NAME CONWAY,W.F.

'UTHOR AFFILIATION Florida Power Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to violations noted in Insp Repts 50-335/87-31 &

50-389/87-30.Corrective action:procedure being developed.

DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR J ENCL L TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response SIZE: Z NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 TOURIGNY,E 2 2 INTERNAL: ACRS 2 2 AEOD 1 1 DEDRO 1 1 NRR MORISSEAU,D 1 1 NRR/DLPQ/PEB11B 1 1 NRR/DLPQ/QAB10A 1 1 NRR/DOEA DIR11E 1 1 NRR/DREP/EPB10D 1 1 NRR/DREP/RPB10A 2 2 NRR/DRIS DIR9A2 1 1 NRR/PMAS/ILRB12 1 1 H RMAN(J 1 1 OGC 15-B-18 1 1 02 1 1 RES/DRPS DIR 1 1 RGN2 FILE 01 1 1 AL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 S

h TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

p. 0, Box:<GcO .

MARCH 7 1980 L-88-112 10 CFR 2.201 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Ins ection Re ort 335 87-31 and 389 87-30 Florida Power & Light Company has reviewed the subject inspection report, and pursuant to the provision of 10 CFR 2.201, the response is attached.

Very truly yours, Wo ~ C w Acting Group Vice President Nuclear Energy WFC/GRM/gp Attachment cc: Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant GRM/001.IR 8803110149 880307

~l PDR ADOCK 05000335 9 DCD an FPL Group company

ATTACHMENT VIOLATION:

During the Nuclear Regulatory Commission (NRC) inspection conducted on December 6, 1987- January 2, 1988, a violation of NRC requirements was identified. The violation involved the failure to establish and/or implement procedures. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1987), the violation is listed below:

Unit 1 Technical Specif ication (TS) 6. 8. 1. a, states that written procedures shall be established, implemented and maintained covering the applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision- 2, February 1978.

Regulatory Guide 1.33, Revision 2, February 1978, Appendix A, states in part, that procedures are required for startup, operation and shutdown of safety-related systems including electrical systems.

Contrary to the above, on December 21, 1987, procedure 1-0970020, operation of the 120V instrument AC system (Class lE), was not properly implemented in that. while

-attempting to place the 1MD instrument invertor back into service following preventive maintenance, the inverter's output breaker was not closed, thereby causing loss of 120V instrument AC and a subsequent

'eactor trip.

RESPONSE

1. Florida Power & Light Company concurs with the violation.
2. A cognitive personnel error, by a non-licensed operator not adequately following a Plant procedure, is the cause for the violation.
3. The 1MD inverter was restored to normal operation. The non-licensed operator involved was counselled on his error and his qualifications were reviewed.

4 ~ A procedure governing the control of infrequent operations on sensitive 'systems is under development to insure adequate expertise and planning is present during these infrequent evolutions. Non-licensed operator training is being assessed for effectiveness in the area of Electrical Plant Distribution.

5. The long term corrective action is scheduled to be completed by June 1, 1988.

GRM/001.IR