Category:CORRESPONDENCE-LETTERS
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl 1999-09-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl ML17229B0851999-04-0505 April 1999 Requests Approval of Encl Relief Request 25 Which Proposes to Use Alternative Requirements of ASME Code Case N-613 in Lieu of Requirements of ASME Section XI Figures IWB-2500-7(a) & IWB-2500-7(b).Action Requested by Aug 1999 ML17309A9791999-03-31031 March 1999 Forwards Revised EPIPs Including Rev 2 to EPIP-00,rev 2 to EPIP-09,rev 2 to EPIP-10 & Rev 10 to HP-207.Summary of Revs Listed ML17309A9761999-03-23023 March 1999 Forwards Revised Epips,Including Rev 4 to EPIP-03, Er Organization Notification/Staff Augmentation, Rev 3 to EPIP-05, Activation & Operation of OSC & Rev 14 to HP-200, HP Emergency Organization. Changes to Epips,Discussed ML17229B0691999-03-19019 March 1999 Transmits TS Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity,Per Soluble Boron Credit ML17229B0721999-03-16016 March 1999 Requests Approval of Enclosed Relief Requests 23 & 24 Re ISI Plan for Second ten-year Interval.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML17229B0481999-03-10010 March 1999 Informs That Util Delivered Matls Requested in Encl 1 of NRC Ltr by Hand on 990308,as Requested by NRC Ltr Dtd 990218 1999-09-25
[Table view] Category:UTILITY TO NRC
MONTHYEARML17223A9401990-09-13013 September 1990 Forwards Evaluation of Potential Safety Impact of Failed Control Element Assemblies on Limiting Transients for Facility ML17223A9341990-09-10010 September 1990 Forwards Addl Info Re Generic Implications & Resolution of Control Element Assembly (CEA) Failure at Facility,Per NRC Request.Description of Testing Program for Old Style CEAs in Unit 1 Core Encl L-90-315, Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 81990-08-30030 August 1990 Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 8 ML17223A9201990-08-28028 August 1990 Forwards Forms NIS-1 & NIS-2, Owners Rept for Inservice Insps as Required by Provisions of ASME Code Rules, Per 900725 Ltr ML17223A8911990-08-20020 August 1990 Forwards Corrected Monthly Operating Repts for Jul 1990 for St Lucie Units 1 & 2 & Summary of Operating Experience ML17348A5041990-08-17017 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990 L-90-301, Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant1990-08-16016 August 1990 Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant ML17223A8751990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor IR 05000335/19900141990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor ML17348A4701990-07-27027 July 1990 Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance Testing ML17223A8621990-07-25025 July 1990 Advises That NIS-1 & NIS-2 Forms,As Part of Inservice Insp Rept,Will Be Submitted by 900831 ML17348A4281990-07-25025 July 1990 Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b) ML17223A8631990-07-25025 July 1990 Submits Addl Info Re Implementation of Programmed Enhancements Per Generic Ltr 88-17, Loss of Dhr. All Mods for Unit 1 Completed & Operational.Mods for Unit 2 Schedule for Upcoming Refueling Outage L-90-271, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders1990-07-20020 July 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders ML17223A8581990-07-19019 July 1990 Forwards Implementation Status of 10CFR50.62 Mod at Facility Re Requirements for Reduction of Risk from ATWS Events for Light Water Cooled Nuclear Power Plants ML17223A8491990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. No Rosemount Transmitters Models 1153 Series B,1153 Series D & 1154 Mfg Prior to 890711 Supplied by Different Vendor ML17223A8521990-07-17017 July 1990 Forwards Addl Info Requested Re Generic Implications & Resolution of Control Element Assembly Failure at Plant.Encl Confirms Util Intent to Follow C-E Regulatory Response Group Action Program IR 05000335/19900131990-07-0909 July 1990 Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements ML17223A8421990-07-0909 July 1990 Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements ML17348A3881990-07-0505 July 1990 Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs ML17223A8391990-07-0303 July 1990 Forwards Results of Beach Survey Procedure & Reduction of Field Survey Data,Per Tech Spec 4.7.6.1.1.Unit 1 Updated Fsar,Section 2.4.2.2,concluded That Dune Condition Acceptable Per Tech Spec 5.1.3 ML17223A8381990-07-0202 July 1990 Requests Termination of Operator License for s Lavelle.Util Also Requests That Ltr Be Withheld (Ref 10CFR2.790) L-90-239, Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)1990-07-0202 July 1990 Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) ML17223A8371990-06-27027 June 1990 Provides Details of Implementation Plan Re Recommendations & Schedular Requirements in Generic Ltr 89-10,per 891228 Ltr.Design Basis Review of safety-related motor-operated Valves & Determination of Switch Settings in Progress ML17308A4981990-06-27027 June 1990 Responds to Generic Ltr 90-04 Re Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions ML17223A8341990-06-19019 June 1990 Forwards Corrected Proposed Tech Spec Figure 3.4-2 Per 900207 Application for Amend to License NPF-16,incorporating Revised Pressure/Temp Limits & Results of Revised Low Temp Overpressure Protection Analysis Into Tech Specs ML17223A8241990-06-18018 June 1990 Forwards Revised Combined Semiannual Radioactive Effluent Release Rept for Jan-June 1988. ML17223A8271990-06-18018 June 1990 Forwards Ma Smith 900601 Ltr to WR Cunningham of EPA Requesting Mod to Plant NPDES Permit to Permit Cleaning of Facility & to Establish Discharge Limits for Chemical Cleaning Wastes ML17348A2981990-06-12012 June 1990 Forwards Rev 16 to Topical QA Rept. ML17223A6761990-05-31031 May 1990 Advises That Air Operated safety-related Components Will Perform All Design Basis Events,Per 881227 Ltr.All Actions Required by Generic Ltr 88-14 Complete for Plant ML17348A2651990-05-29029 May 1990 Submits Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per 10CFR26,App A.2.8(e)(4) ML17223A6741990-05-22022 May 1990 Forwards Info Re Status of 10CFR50.62 Mods to Meet ATWS Requirements as of 900515.Plant Change/Mod Package Necessary for Installing ATWS Will Be Issued by 900630.Hardware Procurement for Diverse Scram Sys Approx 90% Complete ML17223A6361990-05-0808 May 1990 Forwards Final Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. One Untraceable Circuit Breaker Installed in Unit 2 Qualified SPDS & Replaced W/Traceable Breaker ML17223A6281990-04-21021 April 1990 Forwards St Lucie Unit 2 Annual Environ Operating Rept, Vol 1 1989. ML17223A6081990-04-13013 April 1990 Responds to Violations Noted in Insp Repts 50-335/90-02 & 50-389/90-02.Corrective Actions:Nuclear Plant Supervisor Required to Remain in Control Room During Significant Changes in Power Operation & Preventive Maint Upgraded ML17223A6071990-04-0505 April 1990 Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Removal & Replacement of Cold Leg Side Plugs of Heat Number 3513 for Unit 1 Completed During Refueling Outage ML17308A4911990-04-0202 April 1990 Forwards Description & Summary of Safety Evaluations of Plant Changes/Mods Reportable Per 10CFR50.59.Repair &/Or Replacement of Protective Coatings on Surfaces Inside Bldg Pose No Unreviewed Safety Question ML17223A5931990-03-30030 March 1990 Forwards Status of 10CFR50.62, Requirements for Reduction of Risk from ATWS Mods at Plant as of 900315.Diverse Scram Sys Module Prototype Fabrication in Progress ML17223A5921990-03-27027 March 1990 Forwards Addl Info on Proposed License Amend Re Increased Max Allowable Resistance Temp Detector Delay Time,Per 891219 Telcon & Advises That Util Request to Increase Plant Resistance Temp Detector Response Time Remain Unchanged ML17223A5831990-03-19019 March 1990 Forwards Response to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implications of Control Sys in LWR Nuclear Power Plants,' Per 10CFR50.54(f) ML17347B6191990-03-13013 March 1990 Provides Listing of Property Insurance Programs ML17223A5531990-03-0909 March 1990 Submits Results of Investigation of Error Detected in Dose Assessment During 900124 NRC Evaluated Exercise at Plant. Operator Error Caused Keyboard Hangup Requiring Computer Restart ML17223A5451990-03-0808 March 1990 Forwards Revised Tech Specs Re Steam Generator Tube Repairs, Per 890602 Telcon & Subsequent Discussions W/Nrc ML17308A4871990-03-0707 March 1990 Forwards Response to Eight Audit Questions & Licensing Bases Criteria to Resolve Station Blackout Issue.Util Currently Has Procedures to Mitigate Effects of Hurricanes & Tornados Which Meet or Exceed NUMARC 87-00 Guidelines ML17347B5881990-03-0101 March 1990 Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. Info Covers Time Spent by Key Power Plant Managers in Responding to Operational Insps & Audits ML17347B6031990-02-27027 February 1990 Requests Approval to Use Code Case N-468 at Plants ML17223A5321990-02-26026 February 1990 Forwards CEN-396 (L)-NP, Verification of Acceptability of 1-Pin Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2. ML20012A0011990-02-26026 February 1990 Notifies That Followup Actions Completed on Schedule & Incorporated Into Rev 25 to Plant Physical Security Plan,Per NRC 890605 Request ML17223A5411990-02-26026 February 1990 Provides Addl Info Re Proposed License Amends Re Moderator Temp Coefficient Surveillance Requirements,Per 891026 & 900109 Telcons IR 05000335/19890241990-02-22022 February 1990 Responds to Violations Noted in Insp Repts 50-335/89-24 & 50-389/89-24.Corrective Actions:Applicable Procedures Changed to Clarify Which Spaces & Blocks Required to Be Completed on Plant Work Order & QC Supervisor Counseled 1990-09-13
[Table view] |
Text
REQULATO INFORMATION DISTRIBUTION STEM (RIDS)
ACC)ESSlON NBR 8712280186 DOC. DATE: 87/12/22 NOTARIZED: NO DOCKET FAC IL'0-335 St. Lucie Planti Unit ii Florida Power h Light Co. 05000335 AUTH. NAME AUTHOR AFFILI*TION NOODYz C. O. Florida Power 5 Light Co.
RECIP. NAME RECIPIENT AFFILI*TION Document Control Branch <Document Control Desk)
SUBJECT:
Responds to NRC 871125 request for addi info re proposed license amend. Proposed amend to permit replacement of spent fuel pool racks at Unit 1 to ensure that sufficient future capacity exists for storage of spent fuel. Figures encl.
DISTRIBUTION CODE: A001D TITLE: OR COPIES RECEIVED: LTR Submittal: General Distribution
~ ENCL j SIZE:
NOTES'ECIPIENT COPIES REC IP IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 5 5 TOURIQNYi E 1 1 INTERNAL: ARM/DAF/LFMB 1 0 NRR/DEST/ADS 1 1 NRR/DEST/CEB 1 1 NRR/DEST/MTB 1 1 NRR/DEST/RSB 1 1 NRR/DOE*/TSB 1 1
- ILRB 1 1 OQC/HDS2 1 0 REQ FILE 01 1 1 RES/DE/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 17
~ ~
I It r,y tl I
It
P. 0 x 14000, JUNO BEACH, FL 3340B.0420 g(ll/y OECEft/GER 88 1987 L-87-538 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:
Re: St. Lucie Unit I Docket No. 50-335 S ent Fuel Rerack By letter L-87-245, dated June l2, l987, Florida Power & Light Company (FPL) submitted a proposed license amendment to permit replacement of the spent fuel pool racks at St. Lucie Unit I to ensure that sufficient future capacity exists for storage of spent fuel.
By letter dated November 25, I 987 (E. G. Tourigny to C. O. Woody) the NRC Staff requested additional information in the area of plant systems it needed to continue its review of this proposed license amendment.
Attached is FPL's response to this request.
If additional information is required, please contact us.
Very truly yours,
.~ O. Woo
~
Executiv ice President COW/E JW/gp Attachment cc: Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant
'712280186= 871222 '.
PDR ADOCK 05OQO335 t,' .. -. -..L>DR E JW4/054/ I an FPL Group company
~ A il 0
'I t,
III
QUESTION NO. 1: Provide additional discussion on the temporary crane that will be used to handle the spent fuel storage racks within the fuel building", specifically, the load path that the fuel building crane will take to carry the temporary crane.
Demonstrate that the appropriate safety factors'ave been applied to the crane.
RESPONSE: Figures 1 through 9 depict the installation sequence for the temporary crane. The numbers listed below correspond to the figure numbers.
- 1. The auxiliary hook of the fuel cask handling crane will be used to bring the east end truck into the fuel handling building. Using a tag line, the truck will be set onto the east rail and secured in place. Temporary support plates will be provided for this purpose.
2,3,4,5. A temporary gib'crane will be installed near the northwest corner of the spent fuel pool and used in conjunction with the cask crane auxiliary hook to maneuver the west end truck into place. It will then be secured to the west rail.
6,7,8. The south bridge girder will be brought into the building using the cask crane auxiliary hook, and with the jib crane will be maneuvered into a horizontal position. The girder will be transported to its proper location at the south end of the crane and bolted to both end trucks. A similar operation will be performed with the north girder.
- 9. Any miscellaneous small items will be installed at this time. The trolley will then be lowered directly onto the bridge rails.
During the aforementioned operations, the spent fuel handling machine will be parked over the nearest spent fuel rack modules containing stored fuel to ensure that none of the temporary crane components are placed on the rails in that area. No loads will be carried over spent fuel at any time.
QUESTION No. 1 (continued)
RESPONSE: (continued)
The following safety factors, which meet or exceed the requirements of NUREG 0612, have been provided in the design of the load bearing components of the temporary crane:
Component Factor of safety** Criterion**
Bridge girders 2.93 Yield strength End trucks >20 Ultimate strength Wheels 2.50 Rated capacity*
Wheel bearings 3.34 Rated capacity*
Drum Ultimate strength'-
Hoist rope 5.34 Breaking strength Hook Ultimate strength
- Rated capacity has a margin of 5 over ultimate strength.
- Factor of safety equals criterion stress over design stress.
The following steps are taken in the inspection and testing of the temporary crane to achieve compliance with the spirit of NUREG 0612.
a~ The crane structural members are purchased to ASPIC specification and certified as such.
- b. The crane hoist is proof tested to 150X of the rated load in the hoist manufacturer's shop.
C ~ The crane is erected in the crane manufacturer's shop and the workings of the trolley dri'ves and alignment of the trolly is confirmed.
- d. All welds in the manufacturing of the crane are liquid penetrant or magnetic particle tested.
QUESTION NO. 2: Provide the results of the failure of the temporary crane's hook, assuming that it is lifting the heaviest rack at the maximum carrying height.
RESPONSE: The spent fuel pool structure has been previously analyzed for the drop of a 25 ton cask (dimensions 33 inches in diameter by 195 inches long) from a height of 58 feet (elevation 79.50') above the pool floor. (The cask must attain an elevation of 77.00'or entry into the fuel handling building.) The details of this analysis have been presented in Subsection 9.1.4.3 of the St Lucie Unit 1 FSAR.
The concern evaluated there was structural damage to the spent fuel pool concrete. Damage to the steel pool liner was not a limiting factor because a leak in the liner will cause fluid to either (1) enter the space between the liner and the concrete wall where it will eventually be arrested since there is no flow path through the concrete, or (2) enter the monitor channel system where it will eventually be detected at one of the 19 collection points at the base of the pool.
The affected pool zone can then be valved off to prevent further leakage.
The cask drop analysis examined various free fall trajectories. It was determined that the vertical drop is critical because it results in the maximum energy at impact.
For the purpose of determining the impact velocity, the pool was assumed to be full of water up to elevation 60.00'. As to the assumed location of the drop, the critical target area is the cask storage pit since the concrete slab thickness at this location is 6' as compared to 9' throughout the rest of the pool. Also, it is only in this location that the cask can be lifted as high as elevation 79.50'ince the cask handling crane has no access anywhere else in the pool.
The results of the analysis determined that the maximum local penetration in the area of impact was 2". Stresses in the concrete slab are within the appropriate limits using the ultimate strength design method of ACI 318%3. Thus it was concluded that cracking throughout the slab's thickness will not occur under the impact of a cask drop.
The heaviest rack module which will be lifted over the spent fuel pool is an existing 7 x 10 module weighing approximately 42,000 lbs which is somewhat less than a spent fuel cask.
The rack will be lifted over the cask storage pit to the sane height assumed for a cask, as it must use the same path to leave the building. Whereas the spent fuel cask is a solid cylindrical structure with a circular base, the rack module is a rectangular structure having sharp corners. It is not a solid structure, but is composed of tubular and bar shaped structural members welded together into an assembly.
QUESTION NO. 2: (continued)
RESPONSE: An analysis of the impact of a rack module with the pool floor has not been performed, however some comparisons may be drawn between this event and the cask drop case previously analyzed. The structures are roughly of the same weight and are handled at the same height above the pool; the base area of the rack module is much greater than that of the cask.
From this it may be assumed that the rack module will attain an impact velocity not greater than that of the cask. A drop resulting in a vertical orientation at impact, therefore, will be enveloped by the cask drop analysis. An inclined drop, or one resulting in a point'r edge impact, may reasonably be expected to produce localized damage exceeding that of the cask drop; however, considering that a rack impacting the floor in this orientation will be especially capable of, absorbing energy through its own deformation, the overall effect on the pool floor slab is expected to be less severe than that of the cask drop. Localized tearing of the pool liner does not present a problem, as explained above; and based on the results of the cask drop analysis, the throughmracking of the floor slab which would be required to exceed the makeup capability to the spent fuel pool is not expected to occur.
II Possible rack drops from the temporary crane in other areas of the pool will be from a lesser height onto a thicker slab, and hence will be enveloped by the case evaluated above.
At no time will the temporary crane carry a load over a rack containing spent fuel; however, with respect to, the potential radiological consequences of a dropped rack upon the stored fuel assemblies, a comparison may be drawn with the cask drop accident. The results of that analysis, updated to reflect the increased spent fuel storage, are presented in Subsection 5.3.1.2 of the St Lucie Plant Unit No 1 Spent Fuel Storage Facilit 11odification, Safety Analysis Report, transmitted via letter L-87-245 dated June 12, 1987 and indicate that the 10 CFR 100 limits for offsite doses will not be exceeded provided the stored fuel assemblies have been allowed to decay for 1490 hours0.0172 days <br />0.414 hours <br />0.00246 weeks <br />5.66945e-4 months <br /> before a spent fuel cask is brought into the fuel handling building. Rack movement will not commence until this condition has been satisfied. The cask drop analysis assumes the failure of all the fuel rods in all the stored fuel assemblies. The consequences of the cask drop accident thus envelope those of any postulated rack drop.
n QUESTION NO. 3: Provide the stress levels in the temporary crane when the heaviest rack is dropped onto it from the maximum carrying height associated with the cask handling crane. (If the cask handling crane is single failure proof, then dropped means the maximum "possible lowering velocity associated with the cask handling crane.)
RESPONSE: The cask handling crane is not single-failure proof. Tne movement of the existing spent fuel racks in the vicinity of the temporary crane will be limited such that the rack will be lifted a maximum of 6 inches above the temporary'rane bridge girders. An analysis of the temporary crane bridge girders has been performed assuming a drop of the heaviest rack from a height of 1'-0 above the top of the girders. The entire impact energy is assumed to be absorbed in the elasto-plastic deformation of one bridge girder. The resulting deflection of the girder is approximately 6 inches. From this analysis, it is concluded that in the event of a rack drop on the temporary crane, the crane will remain on the rails. Should this condition actually occur, the temporary crane will be removed from the fuel handling building and subjected to a load test before being placed back into service.
In any event, there will be no stored spent fuel in the area of the pool where the load transfer between the fuel cask crane and the temporary crane will take place. Even if a rack drop'should result in the dropping of crane components or the rack into the pool, the consequences would be enveloped by those of the cask drop accident as discussed in the Response to Question No. 2 of this report.
QUESTION NO. 4: Does Figure 1 (September 8, 1987 submittal) represent the locations occupied by the spent fuel before the temporary crane is installedP RESPONSE: Figure 1 in the September 8, 1987 submittal shows the locations occupied by the spent fuel before the temporary crane 's installed.
QUESTION NO. 5: Provide the results of a light load drop analysis which includes a list of the objects considered, their weight and their maximum carrying height as well as the same information related to the referenced load. As an alternative, provide a discussion of the effects of having the new racks on a previously approved light load analysis.
RESPONSE: A light load analysis has not been performed for St Lucie Unit 1; however, such an analysis has been previously performed for St Lucie Unit 2, and has been reviewed and approved in Subsection 9.1.4 of The Safet Evaluation Re ort Related To The 0 ration of St Lucie Plant Unit No. 2, Supplement 3, NUREG&8436 circa April, 1983. The analysis, presented in Subsection 9.1.2.3 of the St Lucie Unit 2 FSAR, has been reviewed with respect to application to St Lucie Unit 1. The maximum attainable lift height for objects is the same for handled by the spent fuel handling machine both units. The spectrum of dropped objects considered for the St Lucie Unit 2 spent fuel pool analysis is applicable to St Lucie Unit 1, and it has been determined that there are no additional objects lighter than a fuel assembly to consider for St Lucie Unit 1. The analysis gives reasonable assurance that fuel damage will not occur due to a dropped light load.
Although an indepth analysis has not been performed for light loads in relation to their impact forces per unit area, the drop of a light load will be no more limiting than the accident, presented in Table 15.4.1-5 of the St fuel'andling Lucie Unit 1 FSAR. As stipulated in the St Lucie Unit 2 light load analysis, each assembly in the spent fuel pool is stored in a separate storage cell of the spent fuel rack, and it is considered inconceivable that more than one fuel assembly could be damaged by the drop of a light load. This conclusion is also applicable to St Lucie Unit 1. The St Lucie Unit 1 analysis of the fuel handling accident assumes that all the pins in one fuel assembly are damaged, and that all the activity in the pin gas gap is released; therefore, the drop of a light load will be no more limiting than the fuel handling accident.
The new spent fuel racks have been analyzed for the drop of a fuel assembly on top of the racks. The results are presented in Subsection 4.6.6 of the St lucis plant Unit No ~Sent l Fuel Stora e Facilit Modification, Safety Analysis Report, transmitte via letter L 7-2 5 dated June 12, 1987 and conclude that the permanent deformation of the rack does not extend below the tops of the stored fuel assemblies; hence the fuel assemblies will sustain no damage as a result of the drops
QUES'LION NO. 5: (continued),
RESPONSE: (continued)
An analysis of a dropped fuel assembly on a stored fuel.
assembly is presented in Subsection 15.4.3.1 of the St Lucie Unit 1 FSAR. 'ihis analysis concludes that there would be no fuel damage as a result of dropped fuel assembly on a stored fuel assembly since the "end on" energy absorption capability of a fuel assembly is greater than the kinetic energy of the drop.
Table 15.4.1-5 of the St Lucie Unit 1 FSAR presents the dos'es for the fuel handling accident, and they are well below the 10 CFR 100 limits; This conclusion remains applicable for the new spent fuel racks.
ATTACHMENT 1 HATCH DOOR NOTE:
SAFETY RAILINGS WILL BE INSTALLED AROUND THE ENTIRE POOL BEFORE CRANE I NSTALLATION END TRUCK PLAT E EAST END TRUCK
,' I< ~
FINAL DESTANATIOI'I OF ".',': i END TRUCK END TRUCK SUPPORT
--EH.PTY...7x ia RAcKs NORTH FIGURE I LOOK ING EAST
'~ ~ldllututtg
-nuaear TITLE: SEQUENCE OF PORTABLE HOIST INSTALLATION
ATTACHMENT 2 NORTH WALL HATCH OOOR JIB CRANE 0
W EST END TRUCK 6 ~ ":.
i /
~
~
g
~
I g
r I~
I FIGURE 2 LOOKING NORTH
- .~ ~45C', TITLE: SEQUENCE OF PORTABLE HOIST
-nuclear utllltu construction I NS TALLATION ENCLOSURE: 2 OF 9
ATTACHMENT 3, NORTH WA'LL HATCH DOOR
'i:c . <
si. ~
I0 JIB CRANE M(EST END TRUCK
~ ~
~ I FIGURE a LOOK lNG NORTH TITLE: SEQUENCE OF PORTABLE HOIST ~
-nuclear utllltv conatructlnn INSTALLATION ENCLOSURE: 3 OF 9
ATTACHMENT 4 NORTH WALL HATCH DOOR
~,
l, I JtB CRANE HOLD BACK TO PREVENT FORWARD LUNGE WEST END TRUCK
~ g ~ ~
FIGURE 4 lOOKING NORTH TI TLE: S EQUEN CE OF PORTAB LE HOI S T
-nuclear uttl~ cnnatructlnn INSTALLATION ENCLOSURE: 4 OF 9
~ I ATTACHMENT 5 NORTH WALL HATCH DOOR C, 0.
JIB CRANE V/EST END TRUCK
~ 'h ~
FIGURE 5 LOOKING NORTH
'.= TITLE: S EQUEN CE OF PORTABLE HOI ST
&4'ADClPRf UClllLLJ CClA%iCAJCCIDA INSTALLATION ENCLOSURE I 5 PF 9
ATTACH/KNT 6 GIRDER NORTH MLL HATCH DOOR 35'-0" JIB CRANE I5-0 FIGURE 6 LOOKING NORTH TITLE: SEQUENCE OF PORTABLE HOIST
-flUCQSf UtflltLJ COP%tfUCtlCXl INSTALLATION ENCLOSURE: 6 OF 9
ATTACHNENT 7 I
NORTH WALL HATCH DOOR A /
- gr .
I ~
'rr'lB CRANE Gl RDER Ir
'i
'1 ~, ~
(
FIGURE 7 LOOK! NG NORTl-l MC', TITLE: SEQUENCE OF PORTABLE HOIST
-nuclear utllttu cnrmtructlun INSTALLATION EN CLOS URF: 7 OF 9
ATTACHHENT 8 NORTH WALL HATC H DOOR J I B CRANE SOUTH GIRDER FIGURE 8 LOOK lNG NORTH"
.= ~hfC,'nuclear TI TLE: SEQUENCE OF PORTABLE HOIST utilttu ccmstruct>on INSTALLATION ENCLOSURE: 8 OF 9
0 ~
A 11 r
~ V A
ATTACHMENT 9 1
NORTH WALL HATCH DOOR
" '<:c'.t Jl B CRANE PORTA E LE HOIST SOUTH GIRDER J
1 0~
1%
FIGURE 9 LOOK lNG NORTt-I 4-hMC:- TITLE: SEQUENCE OF FORTABLE HOIST
-tlUCIBBfUtf1~ CC&hSCFUCtlCÃl .9 INSTALLATION ENCLOSURE. PF 9
0
~I t
l ~
N
~ y