ML17221A361

From kanterella
Jump to navigation Jump to search
Forwards Revised Response to Insp Repts 50-335/87-11 & 50-389/87-10.Corrective Actions:Temporary Change Issued to Operating Procedure I-0530020 & Will Remain in Effect Until Procedure Revised to Reflect Current Method of Operation
ML17221A361
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/21/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-87-352, NUDOCS 8708280297
Download: ML17221A361 (6)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NOR: 8708280297 DOC. DATE: 87/08/21 NOTARIZED: NO DOCKET FACIL: 50-335 St. Lucie Planti Unit 1..Florida Power & Light Co. 05000335 50 389 St. Lucie Planti Unit 2i Florida Power fk Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION ODYL C. O. Florida Power 5 Light Co.

REC IP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards revised response to Insp Repts 50-335/87-11 8.

50-389/87-11 initially submitted by Util L-87-343 1tr.

DISTRIBUTION CODE: IE01D COP IEB RECEIVED: LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES:

RECIPIENT COPIES REC IP IENT COP IES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 TOUR IGNYi E 2 2 1' DEDRO 1 INTERNAL: AEOD 1 NRR MORISBEAUi D 1 NRR/DOEA DIR 1 1 NRR/DREP/EPB 1 NRR/DREP/RPB 2 2 NRR/DRIB DIR 1 1 NRR/PMAS/ ILRB 1 RMAN. J 1 1 OGC/HDB2 1 1 REG FILE 1 1 REB DEPY GI 1 1 R( FILE 01 1 1 RNAL: LPDR 1 1 NRC PDR NSIC 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

\

P. O. BOX 14000, JUNO BEACH, F L 33408 0420 ItI I

4~@~=

AUGUSTi 2 1 1987 L-87-352 I 0 CFR 2.20 I U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gent lemen:

Re: St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Ins ection Re ort 335/87-I I and 389/87-IO Revised Res onse As discussed with your staff on August 20, l987, the attached response to the subject inspection report replaces our response submitted by Florida Power Bc le Light letter L-87-343.

There is no proprietary information in this report.

Very truly yours, oup Vice President Nuclear Energy COW/GRM/gp Attachment cc: Dr. J. Nelson Grace, Regional Administrator, Region ll, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 8708280297 87082i PDR ADOCK 05000335 8 PDR GRM2/028/ I an FPL Group company

Re: St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Ins ection Re ort 335/87-I I and 389/87-IO Revised Res onse VIOLATION During the Nuclear Regulatory Commission (NRC) inspection conducted on June 22-26, l 987, a violation of NRC requirements was identified. The violation involved inadequate procedures. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," IO CFR Part 2, Appendix C (I 986), the violation is listed below:

Unit I Technical Specification (TS) 6.8.l.a, requires that written procedures be established, implemented, and maintained for activities recommended in Appendix A of Regualtory Guide I.33, Revision 2, February l978.

1 Appendix A of Regulatory Guide I.33, Revision 2, February I 978, states that the following is a typical safety-related activity that should be covered by written procedures: PWR Gaseous Effluent System-Collection, Storage, and Discharge.

Contrary to the above, Operating Procedure (OP) l-530020, Revision 8, July l5, 1985, Waste Gas System Operation and I-053002I, Revision 30, January 28, l987, controlled Gaseous Batch Release to Atmosphere, were inadequate in that the details for the Unit I waste gas system operation and for the waste gas system lineup were not included in the procedures to reflect the current mode of operation

RESPONSE

I. Florida Power 8 Light Company (FPL) concurs with the violation.

2. Through personnel oversight, the Unit I system operating procedure was not updated as required to be consistent with the current mode of operation.
3. A temporary change to Operating Procedure I -0530020 has been implemented and will remain in effect until the procedure is revised to reflect the current method of operation. Operating Procedure I-053002 I did not require any changes because it is valid for batch releases.
4. Responsible plant personnel have been made aware of this violation and the need to address all aspects of changes in operating methodology. FPL believes that this action is sufficient to prevent recurrence.
5. The procedure revision is expected to be issued by August 3I, l987.