ML17214A441

From kanterella
Jump to navigation Jump to search
Forwards One Oversize Drawing Depicting post-core Support Barrel Lug Removal NDE Data,Per Util 830907 Ltr
ML17214A441
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/20/1983
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: John Miller
Office of Nuclear Reactor Regulation
Shared Package
ML17214A442 List:
References
L-83-491, NUDOCS 8309260338
Download: ML17214A441 (4)


Text

f REGuLaTORY )FORMATION DISTRIBUTION S =,M (RIDS)

'l ACCESSION NBRc8309260338 DOC.DATE: 83/09/20 NOTARIZED: NO DOCKET FACIL:50-335 St ~ Lucie Planti Unit AFFILIATION li Florida Power 8 Light Co. 05000335 AUTH, NAME AUTHOR UHRIGr R.E ~ Florida Power 8 Light Co.

REC IP, NAi4IE RECIPIENT AFFILIATION MILLERE J.R. Operating Reactors Branch 3

SUBJECT:

Forwards one oversize drawing depicting post core..support barrel lug removal NDE dataiper util 830907 ltr~'

DISTRISUTION CODE: ADO IS COPIES RECEIVED:LTR ENCL:. SIZE:=

TITLE: OR Submittal: General'ist.ribution NOTESS RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR OR03 BC 01 7 7 INTERNAL: "ELD/HDS2 1 0 NRR/DE/MTEB NRR/DL DIR 1 NRR/DL/GRAB NRR/DSI/METB 1 1 NRR/DS I/RAB 00 1 1 RGN2 EXTERNAL: ACRS 09 6. 6 LPDR 03 NRC PDR 02 1 1 NSIC 05 NTIS 1 1 TOTAL NUMBER OF COPIES REaUIRED: LTTR 25 ENCL 23

c A

l f I 'f II I'I 7 II tf g 3 I Il I If If I N t

BOX 14000, JUNO BEACH, FL 33408 FLORIDA POWER & LIGHT COMPANY September 20, I 983 L-83-49I Office of Nuclear Reactor Regulation Attention: Mr. James R. Miller, Chief Operating Reactors Branch PP3 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Miller:

Re: St. Lucie Unit I Docket No. 50-335 Reactor Vessel Internals and Thermal Shield; Plant Recover Pro ram Our letter of September 7, I 983 (L-83-475), stated that Non-Destructive Examination (NDE) data was being refined and consolidated with regard to Core Support Barrel (CSB) status.

Please find enclosed the presentation of post CSB Lug removal NDE data which is final for all nine Lugs, with the exception of Lugs t5 and P/6. The final FPL report on the PSL-I Plant Recovery Program, documenting CSB Integrity and Stability, will provide final NDE status on all nine Lugs. This report is tentatively scheduled to be provided by October 20, l983, as indicated in the St. Lucie I Plant Recovery Plan (Revision 3) (L-83-475).

Should any questions arise, please contact us immediately.

Very truly yours, Robert E. rig Vice President Advanced Systems & Technology REU/DAC/cab Enclosure pP

)

cc: Harold F. Reis, Esquire

~tLg 5'<>+

gag OIL~

iI"'- '8309260338 830920 Pjue.t. 10 y g 2 g~

PDR ADOCK 05000335 ),', ), -I PEOPLE... SERVING PEOPLE

)~

I' II I

1 I;. Irg