Forwards Amend 13 to FSAR
ML17213B072
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/28/1983
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML17213B074 List:
References
L-83-88, NUDOCS 8303020086
Download: ML17213B072 (7)


Text

REGULATORY FORMATION DISTRIBUTION S) M (RIDS)

ACCE'SSION NBR:8303020086 DOC ~ DATE: 83/02/28 NOTARIZED: YES DOCKET FACIL:SO-389 St. Lucie PlantE Unit 2E Florida Power L Light Co. 05000389 AUTH ~ NAME AUTHOR AFFILIATION UHRIGER ~ E ~ Florida Power L Light Co ~

'.REC IP ~ NAME RECIPIENT AFFILIATION EISENHT,D,G. Division of Licensing

SUBJECT:

Forwards Amend 13 to FSAR.

DISTRIBUTION CODE: BOOIS .COPIES RECEIVED;I TR . ENCL;+P: SIZE:.

TITLE: Licensing Submittal: PSAR/FSAR Amdts L Related Correspondence NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A/D LICENSNG 1 0 LI C BR 03 BC 1 0 LIC BR P3 LA 1 0 NERSESEV, 01 1 1 INTERNAL; ELD/HDS2 0 IE FILE 1 1 IE/DEP EPDS 35 1 IE/DEP/EPLB 36 3 3 NRR/DE/AEAB 1 0 NRR/DE/CEB 11 1 1 NRR/DE/EQB 13 2 "2 NRR/DE/GB 28 2 2 NRR/DE/HGEB 30 1 1 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1. NRR/DE/QAB 21 1 1 NRR/DE/SAB 24 1 1 NRR/DE/SEB 25 1 1 NRR/DHFS/HFEB40 1 NRR/DHFS/LQB 32 1 1 NRR/DL/SSPB 1 0 NRR/DSI/AEB 26 1 1 NRR/DSI/ASB 1 1 NRR/DSI/CPB 10 1 1 NRR/DSI/CSB 09 1 1 NRR/DSI/I CS8 16 1 1 NRR/DS I/METB 12 1 1 NRR/DS I/PSB 19 1 1 R e 22 1 1 NRR/DS I/RSB 23 1 1 04 1 1 RGN2 3 3 RM/DDAMI/MI8 1 0 EXTERNAL: ACRS 41 6 BNL(AMDTS ONLY)

DMB/DSS (AMDTS) 1 1 FEMA-REP DIV 39 Lr DR 03 1 1 NRC PDR 02 NSIC 05 1 1 NTIS TOTAL NUMBER OF COPIES REQUIRED: LTTR 52 ENCL 45

0 0 S t3 J t1 ~%C N I'I f'l ' 1 II r ll H

P<

)I W

ti

FLORIDA'POWER 5 LIGHT COMPANY February 28, I 983 L-83-88 Office of Nuclear Reactor Regulations Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear mr. Eisenhut:

Re: St. Lucie Unit No. 2 Docket No. 50-389 Safet Anal sis Report (Amendment No. I3)

In accordance with the requirements of IO CFR 50.30, Florida Power & Light Company (FPL) is submitting sixty (60) copies of Amendment l3 to the Final Safety Analysis Report, St. Lucie Plant Unit 2.

This amendment does not contain any new information about St. Lucie Unit 2. The changes are based on previously docketed FPL letters provided to the NRC since Amendment No. I2. The attached list describes the changes made in this amendment and the letter references. If you have any questions regarding this submittal please contact us.

Very truly yours, Robert E. Uhrig Vice President Advonced Systems and TEchnology REU/R JS/PPL/cab Attachment cc: J. P. O'Reilly, Region II Harold F. Reis, Esquire

~ 830302008b 830228 PDR ADQCK 05000389 i j( PDR PEOPLE... SERVING PEOPLE

ATTACHMENTTO L-83-88 Dated February 28, l 983 Changes in the St. Lucie Plant Unit 2, FSAR as a result of Amendment l3 which were precipitated by FPL submittals to the NRC.

Appendix l.9A was revised as a result of NRC questions on the St. Lucie Plant Emergency Operations Facility (L-82-549).

2. Appendix l.9B changes include more detailed information on ICC Instrumentation and Core Exit Thermocouples (L-82-429, L-82-478).
3. Section 42 contoins the addition of two references and some editorial corrections (L-82-455).
4. Section 4.4.6.I is a new section addressing Loose Parts Monitoring System Training (L-82-465).
5. Section 5.2B was updated by providing more specific information on analysis of notural circulation cooldown. It shows that the St. Lucie I analysis is applicable to St. Lucie 2 (L-82-488).
6. Section 62.2.4 was revised to show that an ECCS sump test was completed (L-82-43 I ).
7. Section 6.52.2 has been revised to reflect a new hydrazine injection rote and concentration due to revised calulations, ond changes in instrument ranges to reflect the most recent specifications (L-82-474).
8. Section 8.3.l.l contains added information on controlling the separation of load groups A and B (L-82-439).
9. Section 9. I 4 clarifies on FPL commitment to NUREG-06 I2 (L-82-409).

IO. Section 9.3.6.6. has been updated per testing of the PASS instrumentation valves (L-82-588).

Section l3.2 changes address personnel expertise and training (L-82-406).

I 2. Chopter l5 has been revised to reflect some changes within the Iodine Removal System and new information in Appendix I SC on Small Break Loss of Feedwater (L-82-474, L-82-480, L-82-533).

I 3. Questions 2IOA. 57-60 have been added to address Base Plate Flexibility items which were requested by the NRC (L-82-3I I). Questions 2IOA.6I-64 respond to items regarding Concrete Expansion Anchors as requested by the NRC (L-82-408).

l4. Quest ion 220.37 has been updated per completed field inspections (L-82-459).

l5. Question 4l0.l0 had additional information specifying equipment which can be lifted over the Spent Fuel Pool and the Reactor Vessel (L-82-393).

l6. Questions 420.A.I, 420.A.8-I2 are being added to respond to NRC concerns resulting from the l8 C site audit (L-82-479).

l7. Questions 440.83-I50 have been added to respond to questions on CESEC (L-82-475).

i'TATE OF FLORIDA )

)

COUNTY OF DADE )

Robert E. Uhri being fixst duly sworn, deposes and says:

That he is Vice President of Florida Power 6 Light Company, the L>censee herein; That he has executed the foregoing document; that the state-ments made in this said document are true and correct to the best of his knowledge, information, and belie, and that he is authorized to execute the document on behalf of said Robert E. Uhrig Subscribed and sworn to be fore me this

.~

',)kk'".I /y.

..doy of Pill cX .

NOTA>Y'g".UBLlC,

'"S',6~a'"'e':""c n and or the County of Dade,

" ua(r<t f'F lori a ffotartr public, State of Flonda at Large MV Cornmiaion Expires p' October 30, 1983 COmmiSSiOn eXpireS:

ll i

)

I f

t