Forwards Suppl to Final Response to IE Bulletin 80-08, Examination of Containment Linear Penetration Welds. Previous Info Clarified W/Figures & Data Re Butt Welds & Results of Nondestructive Examinations
ML17209A466
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 12/01/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-80-08, IEB-80-8, L-80-394, NUDOCS 8012220614
Download: ML17209A466 (32)


Text

P.O. SOX 529100 IVIIAi>ll,F L 33152 FLORIDA POWER & LIGHT COMPANY December 1, 1980 L 94 Nr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission .

101 Marietta Street, Suite 3100 V%

Atlanta, Georgi a 30303

)E k

Re: RI P 0-389 I u letin 80-08 cn Vl On September 29, 1980 (L-80-323), Florida Power & Light Company (FPL) submitted~

a final response to the NRC regarding the information requested in IE Bulletin 80-08. During a site inspection on October 27, 1980, several questions were raised by the NRC inspectors regarding the interpretation of information included in the response.

, In order to clarify the previously submitted information and eliminate any further misinterpretation, we have. provided below and, in the attached figures, all the necessary data requested in, the bulletin.

(1) Both,flued head designs and other designs with containment boundary butt weld(s) between the penetration sleeve and process piping are utilized in St. Lucie Unit 2.

(2a) ASME Section III Code utilized by the vendor: 1971 edition through Winter 1973 addenda.

ASNE Section II Code utilized by construction: 1977 edition through Summer of 1977 addenda.

(2b) As a minimum, all subject welds have been or will be radiographed.

(2c) All subject butt welds are shown on the attached figures.

These figures provide the base metal and size for the process pipe, sleeve and/or flued head, as appropriate.

Backing bars are not used on the subject butt welds.

(2d) The results of nondestructive examinations are shown on the attached figures.

(3) This item is not applicable since one of the volumetric examinations performed is radiography.

PEOPLE... SERVING P

sJ f~

p rs

Office of Inspection and Enforcement Page Two December 1, 1980 As indicated in the previous letter, FPL considers all items of IE Bulletin 80-08 to be closed out on 'the basis that ultrasonic testing is not conducted, that no backing bars are utilized, and that radiography is one of the methods required for acceptance of all subject butt welds.

V ery truly yours, Robert E. Uhrig Vice President Advanced Systems 5 Technology REU/TCG/ah Attachments cc: U. S. Nuclear Regulatory Commission Director,. Division of Reactor Construction and Inspection Washington, D. C. 20555 Harold F. Reis, Esquire

Florida Powex & Light Company St Lucie Unit 2 Index to Containment Vessel Pi in Penetrations Penetration 8 S stem For Details see sheet 1 Main Steam 1 2 Main Steam 1 3 Feedwater 2 4 Feedwater 2 5 Blowdown 3 6 Blowdown 3 7 Primary Water Supply 4 8 Station Air'upply 5 9 Instrument Air Supply 6 10 H&V Containment Purge Not Applicable ll H&V Containment Purge This numbex" is not used Not Applicable 12 Not Applicable 13 This number is not used Not Applicable 14 Nitrogen Supply, 7 15 CCW Return Fan Cooler. Not Applicable 16 CCW Supply Fan Cooler Not Applicable 17 CCW"Return Fan Cooler Not Applicable 18 CCW Supply Fan Cooler Not Applicable 19 CCW Return Fan Cooler . Not Applicable 20 CCW Supply Fan Cooler Not Applicable 21 CCW Return Fan Cooler Not Applicable 22 CCW Supply Fan Cooler Not Applicable 23 Water Supply to RCP's Not Applicable 24 Watex Return from RCP's Not Applicable 25 Fuel Transfer Tube 8 26 Letdown Line 9 27 Charging Line 10 28 Sampling Hot Leg 11 29 Sampling Pressurizer Steam Space 11 30 Blowdown 11 31 Containment Vent Header Not Applicable 32 Containment Sump Suction 12 33 Containment Sump Suction 12 34 A&B Containment Spray Not Applicable 35 A&B'6 Containment Spray Not Applicable Containment Spray 13.

37 Safety Infection Loop 13 38 Safety Injection Loop 13 39 Safety In)ection Loop 13 40 Shutdown Cooling 14 41 SIT Test 15 42 Containment Sump Pump Discharge Not Applicable 43 Reactor Drain Pump Suction 16

Penetration ff S stem For Details see sheet 44 RCP's Controlled Bleedoff 17 45 Diff Pressure between inside Containment ll

& Annulus 46 Refueling Cavity Purification inlet 18 47 Refueling Cavity Purification outlet 18 48 H Sampling 11 49 Bfowdown 11 ~

50 Spare Not Applicable 51 H Sampling 11 52 IkT Instrumentation 19 53 Diff. Pressure between Inside Containment ll

& Annulus 54 ILRT 20 55 Spare Not Applicable 56 H&V Purge Inlet Not Applicable 57 H&V Purge Outlet Not Applicable 58 Spare Not Applicable 59- SBVS, Not Applicable 60 SBVS Not Applicable 61 Spare Not Applicable 62 Instrument Air to Construction Hatch Not Applicable 63 This number is not used Not Applicable 64 Shutdown Cooling 14 65 Spare Not Applicable 66 Spare Not Applicable 67 H&V Vacuum Relief, Not Applicable 68 H&V Vacuum Relief Not Applicable 69 Leg 2B Injection

'ot 21 70 Hot Leg .2B Infection 21 71 Spare Not Applicable 72 Spare Not Applicable

Inside Containment Outside Vessel Vendor Weld RT RT.

Head SA 105 Carbon SA 516 .Gr II Gr 70 Steel SA 5)6 Gr 70 60" OD 60" OD Field Weld RT Test Results Pen 1 Not Complete Pen 2 Not Complete For Details refer to Hf . Dv s. Vendor Weld RT Test Results

'.998-1983 Pen 1 Repair for lack of

,'998-1985 fusion, penetration and slag

',998-1987

.998-1989 Pen 2 Repaired for lack of fusion,'lag Penetrations 1 and 2 Sheet 1 of 21

iside Containment Outside Vessel RT RT Flued Head SA arbon 105 teel SA 516 Gi 70 SA 516 Gr 70 r 70 45" OD Field Weld RT Test Results Pen 3 Not Complete Pen 4 Not Complete 45" OD For Details Refer to Mf . Dw s.

2998-1991 2998-1995 2998-1993 2998-1997 Vendor Weld RT Test Results Pen 3 No Repair Pen 4 Repaired for unmelted insi Pentrations 3 and 4 Sheet 2 of 21

nside Containment Outside Vessel RT RT RT Flued Head Carbon Steel SA 105 10.V50"

12. 750" SA 420 OD OD Gr WPL6 SA 106 Gr 9 Field Wkld RT Test Results Vendor Weld RT Test Results Vendor Weld RT Test Results Accepted ,Accepted Accepted For Details refer to Mf . Dw s.

2998-1999 Penetrations 5 and 6 Sheet 3 of 21

Outside Containment Inside Vessel SB 564 RT Carbon 20375" Steel OD 4 5"'OD Field Meld - RT Test Results Not Complete For Details refer to Mf . Dw s.

2998-2000 Penetration 7 Sheet 4of 21

Outside Containment Inside Vessel SA 234 Gr MPH Carbon 2.375" OD Steel 4 ~ 5 'OD Field Meld RT Test Results Not Complete-For Details refer to Mf . Dw s.

2998-2001 Penetration 8 .

Sheet 5 of 21

Containment Inside Vessel SA 23) Gr WPB RT Carbon 2 375" OD Steel 4.5"-OD Field Weld RT Test Results Hot Complete For Details refer to Mf . Dw s.

2998-2929 Penetration 9 Sheet 6 of21

OutsideContainment Inside-Vessel SB 564 RT Carbon 1.315" Steel

OD 4 5" 'OD Field Weld RT Test Results Not Complete

.or Details refer to Mf . Dw s.

) 998-2003 Penetration 14 Sheet 7 of 21

Inside Containment Outside Vesse RT Fuel Cavity Wall RT Material Later Later Material Later , SA 516 Gr 70 48" Carbon OD Steel Field Weld - R1 Test Results Field Weld RT Test Results Not Complete Not Complete For Details refer to Mf . Dw s.

3998-1557 Penetration 25 Sheet 8 of 21

~

~

Inside Containment Outside Vessel RT RT Flued Head SA 182 Gr F304 Carbon SA 106 Gr B Steel 12 '50" OD Field Weld RT Test Results ~

Vendor Weld RT Test Results Accepted Accepted or Details refex to Mf . Dw s.

998-2006 Penetration 26 Sheet 9 of 21

sideContainment Outside Vessel RT RT Flued Head SA 182 Gr 304F SA 106 Gr B Carbon Steel 10.750" OD Field Weld RT Test Results Vendor Weld RT Test Results Acceptable Repaired and Accepted For Details refer to Mf . Dw s 2998-2007 Penet.ration 27 Sheet10of

Outside Containment Inside Vessel SA 106 Gr B RT RT SA 420 WPL 6 Carbon Steel 6 '25" OD Vendor Weld RT Test Results Field Weld --RT Test Results Pen 29 . Accepted Pen 29 Accepted'ccepted Pen 30 Repaired for porosity Pen 30 Pen 49 Accepted Pen 49 Not Complete Pen 28 Accepted Pen 28 Accepted Pen 45 Accepted 45Accepted

-'en Pen 48- Accepted Pen 48 Not Complete Pen 51 Accepted Pen 51, Accepted Pen 53 .. Accepted Pen 53 Not Complete For Details refer to Mf . Dw s.

2998-2009 2998-2021 2998-2010 2998-2022 2998-2008 2998-2023 2998-2018 Penetrations 28,= 29, 30, 45, 48, 49, 51, 53 Sheet ].]of 21

Inside Containment Outside Vessel RT SA 516 Gr 70 Carbon Steel 3a.oo" OD Field Weld

. RT Test Results Pen 32 Accepted Pen 33 Accepted For Details refer to Mf . Dw s.

2998- 37>9 2998-1559 Penetrations 32 and 33 Sheetl2of 21

0

,ide Containment Outside Vessel SA 420 WPL6 RT SA 106 Gr B RT RT Flued Head Carbon SA 182 Gr F304

=

Steel 18" OD 16" OD Field Weld RT Test Results Vendor Weld RT Test Results Vendor Weld- RT Test Results Pen 36 Accepted. Pen 36 'Accepted Pen 36 Accepted Pen 37 Not Complete Pen 37 Accepted Pen -37 Repaired for slag Pen 38 Accepted . Pen 38 Accepted Pen 38 Repaired for slag Pen 39 Not Complete Pen 39 Accepted Pen 39 Repaired for slag For Details refer to Mf . Dw s.

2998-2013 Penetrations 36, 37, 38 and 39 Sheet13of 21

Inside Containment Outside Vessel RT SA 516 Gr 70 RT Flued Head A 182 Gr F304 Carbon Steel 24" OD Field Weld . RT Test Pen 64Accepted Results Vendor Weld - RT Test Results Pen 64 Accepted Pen 40 Accepted . Pen 40 Accepted.

For Details refer to Mf . Dw s.

2998-2025 2998-2014 Penetrations'.'40 and 64 Sheetl'@of 20

Insiders Containment Outside Vessel SA 106 Gr B RT RT Flued Head SA 182 Gr F 304 Carbon Steel 8.625" OD Field Meld RT Test Results Vendor Meld RT Test'Results Accepted Accepted For Details refer to Mf . Dw s.

2998-2015 Penetration 41 Sheet 1'5of 21

Inside Containment Outside Vessel RT SB 166 Carbon Steel 8" OD Field Meld RT Test Results Not Complete For Details refer to Mf . Dw s.

2998-763 2998-764 Penetration 43 Sheetl6of21

InsideContainment Outside RT Vessel SA 106 Gr B Flued Head A 182 Gr F304 Carbon Steel 625ll OD Field Weld - RT Test Results Ven'dor Weld RT Test Results Not Complete Repaired and Accepted

.'or Details refer to Mf . Dw s.

!998-2017 Penetration 44 Sheet 17of 21

Outside Containment Inside Vessel SA 403 MP 304 RT Carbon 3 ~ 5" OD Steel 6.625" OD Field Meld RT Test Results".:

Pen 46 Not 'Complete Pen 47 Not Complete For Details refer to Mf . Dw s.

2998-2019 2998-2020 Penetrations 46 & 47 Sheet18of21

Outside Containment Inside Vessel SA 420 WPL 6 RT SA 106 Gr B C arbon Steel 12 '5 OD Field Weld RT Test Results Vendor Wild '-'RT Test Results Not Complete Not Complete For Details refer to Mf . Dw s.

2998-7945 Penetration 52 Sheetl9of21

OutahdeContainment Inside .

Vessel:

SSA 234 Gr WPB RT Carbon 8 625's Steel OD 16" 'OD Field Weld RT Test Results'ot Complete vr Details refer to Mf . Dw s.

398-7946 Penetration 54 Sheet 20 of 21

Inside Containment Outside Vessel SA 106 Gr B RT Flued Head SA -182 r F304 Carbon Steel 10.75" OD Field Weld RT Test Results Vendor Weld RT Test Results Pen 69 Not Complete Pen 69 Repaired for slag Pen 70 Accepted Pen 70 Accepted For Details refer to Mf . Dw s.

2998-2928 Penetrations 69 and, 70 Sheet 21of 21