Summary of January 25, 2017, Pre-Licensing Meeting with Duke Energy to Discuss Proposed License Amendment Request to Create a New Condition for Nuclear Service Water System TS 3.7.8 - Catawba Nuclear Station, Unit Nos. 1 and 2 (CAC MF8944-5
ML17089A204
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/07/2017
From: Michael Mahoney
Plant Licensing Branch II
To: Waldrep B
Duke Energy Carolinas
Mahoney M, NRR/DORL/LPLII-1, 415-3867
References
CAC MF8944, CAC MF8945
Download: ML17089A204 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 7, 2017 LICENSEE: DUKE ENERGY FACILITY: CATAWBA NUCLEAR STATION, UNIT NOS. 1AND2

SUBJECT:

SUMMARY

OF JANUARY 25, 2017, PRE-LICESING MEETING WITH DUKE ENERGY TO DISCUSS PROPOSED LICENSE AMENDMENT REQUEST TO CREATE A NEW CONDITION FOR TECHNICAL SPECIFICATION 3.7.8 TO ALLOW NUCLEAR SERVICE WATER SYSTEM SINGLE POND RETURN HEADER OPERATION FOR THE CATAWBA NUCLEAR STATION, UNIT NOS.

1 AND 2 (CAC NOS. MF8944 AND MF8945)

On January 25, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Duke Energy Carolinas (Duke Energy, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of this meeting was to discuss 's plans to submit a proposed license amendment request to create a new Condition for Technical Specification (TS) 3.7.8 to allow Nuclear Service Water System (NSWS) Single Pond Return Header Operation for the Catawba Nuclear Station, Unit Nos. 1 and 2. The meeting notice and agenda, dated January 10, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 1701 OA435. A list of attendees is enclosed.

The licensee presented the proposed changes in a power point slide presentation to aid in the NRC's review (ADAMS Accession No. ML17023A115). The slides for this meeting were made available, along with the public meeting notice.

During the meeting, the licensee presented the following topics:

1. Introductions I Opening Remarks
2. License Amendment Request Overview
3. TS 3.7.8 Change
4. System Plan View and Alignment
5. Probabilistic Risk Assessment (PRA) Overview
6. Overview submission timeline
  • The licensee briefed the NRC staff on the purpose of the request TS change. The TS change is to allow Single Pond Return Header Operation of the NSWS. This configuration would allow the licensee to perform the following activities:

o Planned plant modifications o Planned inspections o Future inspections o Future maintenance activities

  • The TS change will be a permanent change to TS 3.7.8. Licensee proposed to create a new Condition D, defined as "NSWS Single Pond Return Header Operation." New Condition D will have a 30-day Completion Time.
  • Licensee noted that Condition D will only be entered to address planned inspections and maintenance activites.
  • The licensee noted the submittal will be PRA risk-informed.
  • The licensee briefed the NRC staff on the schematics of the NSWS Single Pond Return Header Operation.
  • The licensee noted that the preliminary PRA numbers discussed with the NRC staff were based on two 30-day TS entrees per year (one per train).
  • The NRC staff provided feedback to the licensee in the following areas:

o Are there any other TSs impacted by the proposed change?

o Flooding evaluation for the Auxiliary Building.

o Why a 30-day completion time (verses a 14-day)?

o Define what exactly the NSWS Single Pond Return Header Operation configuration is.

o When discussing risk, address both units.

o Any impact on the ultimate heat sink TSs.

o Address any flex-equipment (crediting or not crediting).

No members of the public were in attendance, in person nor via a teleconference line.

No regulatory decisions were made during this meeting.

Please direct any inquiries to me at 301-415-3867 or Michael.Mahoney@nrc.gov.

au h/~

Michael Mahoney, Project Manager Plant Licensing Branch LPL 2-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-413 and 50-414

Enclosure:

List of Attendees cc w/enclosure: Distribution via Listserv

List of Attendees January 25, 2017 Public Meeting with Duke Energy Pre-Licensing Meeting Regarding Change to TS 3.7.8, "Nuclear Service Water System" Name Organization Michael Mahoney NRC/NRR/DORL/LPL2-1 Michael Markley NRC/N RR/DORL/LPL2-1 Matthew Hamm NRC/NRR/DSS/STSB Gordan Curran NRC/NRR/DSS/SBPB Jerry Purciarello NRC/N RR/DSS/SBPB Dan O'Neal NRC/NRR/DRA/APLA CJ Fong NRC/NRR/DRAIAPLA Cecil Fletcher Duke Energy Aaron Michalski Duke EnerQY Brian Cauthen Duke Energy Michael S. Kitlan Jr. Duke Energy Paul Farish Duke Energy Carrie Wilson Duke Energy Enclosure

SUBJECT:

SUMMARY

OF JANUARY 25, 2017, PRE-LICESING MEETING WITH THE LICENSEE ENERGY TO DISCUSS PROPOSED LICENSE AMENDMENT REQUEST TO EXTEND THE COMPLETION TIME FOR AN INOPERABLE DIESEL GENERATOR FOR THE CATAWBA NUCLEAR STATION, UNIT NOS 1 AND 2 (CAC NOS. MF8944 AND MF8955) DATED APRIL 7, 2017 DISTRIBUTION:

PUBLIC RidsNrrDssStsb Resource LPL2-1 R/F RidsNrrPMCataba Resource RidsACRS_MailCTR Resource RidsNrrDssSbpb RidsNrrDorlLpl2-1 Resource JBowen, OEDO RidsNrrDraApla MHamm, NRR RidsNrrLALKGoldstein Resource GPurciarello, NRR RidsRgn2MailCenter Resource ADAMS A ccess1on No.: ML17089A204 ee1nq Nt" Mt" o ice: ML 1701 OA435 OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DORL/LPL2-1/BC NRR/DORL/LPL2-1/PM NAME MMahoney KGoldstein MMarkley MMahoney DATE 04/03/17 03/31/17 04/06/17 04/07/17 OFFICIAL RECORD COPY