ML13127A174

From kanterella
Jump to navigation Jump to search
4/29/2013 - Summary of Catawba 2012 EOC Meeting
ML13127A174
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/03/2013
From: Bartley J
NRC/RGN-II/DRP/RPB1
To: Henderson K
Duke Energy Corp
References
Download: ML13127A174 (23)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 3, 2013 Mr. Kelvin Henderson Site Vice President Duke Energy Corporation Catawba Nuclear Station 4800 Concord Road York, SC 29745-9635

SUBJECT:

PUBLIC MEETING

SUMMARY

- CATAWBA NUCLEAR STATION - DOCKET NO. 50-390

Dear Mr. Henderson:

This refers to the meeting conducted on April 29, 2013, at the Rock Hill City Hall Rotunda in Rock Hill, SC. The purpose of this meeting was to discuss the NRC's Reactor Oversight Process (ROP) and the NRC's annual assessment of plant safety performance for the period of January 1, 2012, to December 31, 2012. The slides presented during the meeting are enclosed.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4607.

Sincerely,

/RA/

Jonathan H. Bartley, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket No.: 50-413, 50-414 License No.: NPF-35, NPF-52

Enclosures:

1. List of Attendees
2. Presentation Slides cc w/encls: (See page 2)

_________________________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE AMR /RA/ JHB /RA/

NAME ARuh JBartley DATE 05/01/2013 05/03/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO K. Henderson 2 cc w/encl: Alicia Richardson Scott L. Batson Licensing Administrative Assistant Plant Manager General Office Catawba Nuclear Station Duke Energy Corporation Duke Energy Corporation Electronic Mail Distribution Electronic Mail Distribution Lara S. Nichols William M. Suslick Deputy General Counsel Design Engineering Manager Duke Energy Corporation Catawba Nuclear Station Electronic Mail Distribution Duke Energy Corporation Electronic Mail Distribution David A. Cummings Associate General Counsel Steven B. Putnam General Office Organizational Effectiveness Manager Duke Energy Corporation Catawba Nuclear Station Electronic Mail Distribution Duke Energy Corporation Electronic Mail Distribution Beth J. Horsley Wholesale Customer Relations Randall D. Hart Duke Energy Corporation Regulatory Compliance Manager Electronic Mail Distribution Catawba Nuclear Station Duke Energy Corporation Sandra Threatt, Manager Electronic Mail Distribution Nuclear Response and Emergency Environmental Surveillance Joseph Michael Frisco, Jr. Bureau of Land and Waste Management Vice President, Nuclear Design Engineering Department of Health and Environmental General Office Control Duke Energy Corporation Electronic Mail Distribution Electronic Mail Distribution Division of Radiological Health M. Christopher Nolan TN Dept. of Environment & Conservation Director - Regulatory Affairs 401 Church Street General Office Nashville, TN 37243-1532 Duke Energy Corporation Electronic Mail Distribution David A. Repka Winston Strawn LLP David A. Cummings (acting) Electronic Mail Distribution Fleet Regulatory Compliance & Licensing Manager Piedmont Municipal Power Agency General Office Electronic Mail Distribution Duke Energy Corporation Electronic Mail Distribution Vanessa Quinn Federal Emergency Management Agency County Manager of York County Radiological Emergency Preparedness York County Courthouse Program P. O. Box 66 1800 S. Bell Street York, SC 29745-0066 Arlington, VA 20598-3025

K. Henderson 3 Letter to Kelvin Henderson from Jonathan Bartley dated May 3, 2013

SUBJECT:

PUBLIC MEETING

SUMMARY

- CATAWBA NUCLEAR STATION - DOCKET NO. 50-390 Distribution w/encl:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCatawba Resource Ca ta wb a Nu c le a r S ta tio n An n u a l As s e s s m e n t Me e tin g Re a c to r Ove rs ig h t P ro c e s s - 2012 Nu c le a r Re g u la to ry Co m m is s io n - Re g io n II Ro c k Hill, S C Ap ril 29, 2013 1

Enclosure 2

P u rp o s e o f To d a ys Me e tin g

  • A p u b lic fo ru m fo r d is c u s s io n o f th e lic e n s e e s p e rfo rm a n c e in 2012
  • NRC will a d d re s s th e p e rfo rm a n c e is s u e s id e n tifie d in th e a n n u a l a s s e s s m e n t le tte r
  • Lic e n s e e will b e g ive n th e o p p o rtu n ity to re s p o n d a n d in fo rm th e NRC o f n e w o r e xis tin g p ro g ra m s to m a in ta in o r im p ro ve p e rfo rm a n c e 2

Enclosure 2

Ag e n d a

  • In tro d u c tio n
  • Na tio n a l S u m m a ry o f P la n t P e rfo rm a n c e
  • Dis c u s s io n o f P la n t P e rfo rm a n c e Re s u lts
  • Lic e n s e e Re s p o n s e a n d Re m a rks
  • NRC Clo s in g Re m a rks
  • Bre a k
  • NRC a va ila b le to a d d re s s p u b lic q u e s tio n s 3

Enclosure 2

Ou r Mis s io n

  • To lic e n s e a n d re g u la te th e n a tio n s c ivilia n u s e o f b yp ro d u c t, s o u rc e , a n d s p e c ia l n u c le a r m a te ria ls to e n s u re a d e q u a te p ro te c tio n o f p u b lic h e a lth a n d s a fe ty, p ro m o te th e c o m m o n d e fe n s e a n d s e c u rity, a n d p ro te c t th e e n viro n m e n t.

4 Enclosure 2

NRC P e rfo rm a n c e Go a ls

  • S a fe ty: En s u re a d e q u a te p ro te c tio n o f p u b lic h e a lth a n d s a fe ty a n d th e e n viro n m e n t.
  • S e c u rity: En s u re a d e q u a te p ro te c tio n in th e s e c u re u s e a n d m a n a g e m e n t o f ra d io a c tive m a te ria ls .

5 Enclosure 2

Na tio n a l S u m m a ry o f P la n t P e rfo rm a n c e S ta tu s a s o f 12/31/2012 Lic e n s e e Re s p o n s e 81 Re g u la to ry Re s p o n s e 18 De g ra d e d Co rn e rs to n e 3 Mu ltip le /Re p e titive De g . Co rn e rs to n e 1 Un a c c e p ta b le 0 IMC 0350 Ove rs ig h t 1 To ta l 104 6

Enclosure 2

Na tio n a l S u m m a ry

  • P e rfo rm a n c e In d ic a to r Re s u lts fo r 2012*

- Gre e n 6926

- Wh ite 23

- Ye llo w 0

- Re d 0

  • P Is a re c o u n te d p e r p la n t p e r q u a rte r
  • To ta l In s p e c tio n Fin d in g s in 2012#

- Gre e n 914

- Wh ite 16

- Ye llo w 1

- Re d 1

  1. Fin d in g d a ta c u rre n t a s o f 3/04/2013 7

Enclosure 2

Ca ta wb a As s e s s m e n t Re s u lts J a n u a ry 1 - De c e m b e r 31, 2012

  • Ca ta wb a Un it 1 wa s in th e Re g u la to ry Re s p o n s e Co lu m n e ffe c tive 2 n d q u a rte r 2012

- Wh ite Fin d in g fo r in a d e q u a te g e n e ra to r p ro te c tio n m o d ific a tio n

- 95001 S u p p le m e n ta l In s p e c tio n c o m p le te d Ma rc h 21, 2013 with n o is s u e s

- Re tu rn e d to Lic e n s e e Re s p o n s e Co lu m n e ffe c tive Ap ril 1, 2013

  • Ca ta wb a Un it 2 wa s in th e Lic e n s e e Re s p o n s e Co lu m n 8

Enclosure 2

Ca ta wb a In s p e c tio n Ac tivitie s J a n u a ry 1, 2012 - J a n u a ry 5, 2013

  • 2442 h o u rs o f in s p e c tio n

- 2257 h o u rs o f b a s e lin e

- 130 h o u rs o f e ve n t re s p o n s e (Ap ril 2012 LOOP )

- 63 h o u rs fo r TIs

  • 720 h o u rs o f p la n t s ta tu s wa lk d o wn s 9

Enclosure 2

Ca ta wb a In s p e c tio n Ac tivitie s J a n u a ry 1 - De c e m b e r 31, 2012

  • S p e c ia l In s p e c tio n to re vie w th e Ap ril 2012 Un it 1 re a c to r trip a n d lo s s o f o ffs ite p o we r
  • Bie n n ia l P ro b le m Id e n tific a tio n a n d Re s o lu tio n In s p e c tio n
  • TI- 187, In s p e c tio n o f Ne a r-Te rm Ta s k Fo rc e Re c o m m e n d a tio n 2.3 Flo o d in g Wa lkd o wn s
  • TI-188, In s p e c tio n o f Ne a r-Te rm Ta s k Fo rc e Re c o m m e n d a tio n 2.3 S e is m ic Wa lkd o wn s 10 Enclosure 2

Ca ta wb a Nu c le a r S ta tio n An n u a l As s e s s m e n t S u m m a ry J a n u a ry 1 - De c e m b e r 31, 2012

  • Du ke En e rg y Ca ro lin a s o p e ra te d Ca ta wb a Nu c le a r S ta tio n in a m a n n e r th a t p re s e rve d p u b lic h e a lth a n d s a fe ty
  • All c o rn e rs to n e o b je c tive s we re m e t with o n ly o n e Wh ite fin d in g id e n tifie d (in a d e q u a te g e n e ra to r p ro te c tio n m o d ific a tio n )

11 Enclosure 2

Ca ta wb a Nu c le a r S ta tio n An n u a l As s e s s m e n t S u m m a ry J a n u a ry 1 - De c e m b e r 31, 2012

  • NRC p la n s to c o n d u c t a n IP 95001 s u p p le m e n ta l in s p e c tio n (c o m p le te d Ma rc h 2013) in a d d itio n to b a s e lin e in s p e c tio n s a t Ca ta wb a Nu c le a r S ta tio n fo r 2013 12 Enclosure 2

Op e n to th e P u b lic

  • Th e NRC p la c e s a h ig h p rio rity o n ke e p in g th e p u b lic a n d s ta ke h o ld e rs in fo rm e d o f its a c tivitie s .
  • At www.n rc .g o v, yo u c a n :

- Fin d p u b lic m e e tin g d a te s a n d tra n s c rip ts

- Re a d NRC te s tim o n y, s p e e c h e s , p re s s re le a s e s ,

a n d p o lic y d e c is io n s

- Ac c e s s th e a g e n c ys Ele c tro n ic Re a d in g Ro o m to fin d NRC p u b lic a tio n s a n d d o c u m e n ts 13 Enclosure 2

Co n ta c tin g th e NRC

  • Re p o rt a n e m e rg e n c y

- (301) 816-5100 (c a ll c o lle c t)

  • Re p o rt a s a fe ty c o n c e rn

- (800) 695-7403

- Alle g a tio n @n rc .g o v

  • Ge n e ra l in fo rm a tio n o r q u e s tio n s

- www.n rc .g o v

- S e le c t Wh a t We Do fo r P u b lic Affa irs 14 Enclosure 2

Ac tio n s in Re s p o n s e to th e J a p a n Nu c le a r Ac c id e n t

  • Ac tio n s in re s p o n s e to J a p a n Nu c le a r Ac c id e n t We b s ite : h ttp ://www.n rc .g o v/ja p a n /ja p a n -in fo .h tm l
  • Ma ilb o x fo r c o m m e n ts o n s ta ff a c tio n s :

J LD_P u b lic .Re s o u rc e @n rc .g o v

  • Offic e o f P u b lic Affa irs P o in t o f Co n ta c t:

OP A.re s o u rc e @n rc .g o v o r 301-415-8200 15 Enclosure 2

NRC Re p re s e n ta tive s

  • Ric h a rd Cro te a u , Dire c to r, Divis io n Re a c to r P ro je c ts ,

Re g io n II

- (404) 997-4501

  • An d y Hu tto , S e n io r Re s id e n t In s p e c to r

- (803) 831-2963

  • Ch a d Hu fm a n , Re s id e n t In s p e c to r

- (803) 831-2963

  • J o n a th a n Ba rtle y, Ch ie f, Re a c to r P ro je c ts Bra n c h 1, Re g io n II

- (404) 997-4607 16 Enclosure 2

NRC S o c ia l Me d ia Ch a n n e ls

  • Blo g : h ttp ://p u b lic -b lo g .n rc -g a te wa y.g o v/
  • Flic kr: h ttp ://www.flic kr.c o m /p h o to s /n rc g o v/
  • Twitte r: h ttp s ://twitte r.c o m /#!/n rc g o v
  • Yo u Tu b e : h ttp ://www.yo u tu b e .c o m /u s e r/NRCg o v
  • RS S : h ttp ://www.n rc .g o v/p u b lic -in vo lve /lis ts e rve r.h tm l#rs s 17 Enclosure 2

Re fe re n c e S o u rc e s

  • Re a c to r Ove rs ig h t P ro c e s s

- h ttp ://www.n rc .g o v/NRR/OVERS IGHT/AS S ES S /in d e x.h tm l

  • P u b lic Ele c tro n ic Re a d in g Ro o m

- h ttp ://www.n rc .g o v/re a d in g -rm .h tm l

  • P u b lic Do c u m e n t Ro o m 800-397-4209 (To ll Fre e )

18 Enclosure 2