Revision 309 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Section 9.2
ML16256A447
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16256A447 (61)


Text

WSES-FSAR-UNIT-39.2-19.2WATER SYSTEMS9.2.1STATION SERVICE WATER SYSTEM This system is not applicable to Waterford 3.

9.2.2COOLING SYSTEM FOR REACTOR AUXILIARIES Cooling water for the reactor auxiliaries is supplied by the Component Cooling Water System (CCWS) andthe Auxiliary Component Coolant Water System (ACCWS).The function of these reactor auxiliaries cooling systems is to remove heat from the reactor auxiliaries,and to transfer it to the cooling towers for rejection to the atmosphere, and to ensure continuous operationor safe shutdown of the unit under all modes of operations.9.2.2.1Design BasesThe design bases for the CCWS and ACCWS are:

a)The systems shall supply sufficient cooling water to remove heat from the safety related reactorauxiliaries and non safety related auxiliaries where the potential for radioactive leakage exists andto transfer it to the cooling towers during normal reactor operation.b)The systems shall supply sufficient cooling water to the components required for normal unitshutdown.c)The systems shall supply sufficient cooling water to components required during refueling.d)The systems shall supply sufficient cooling water to components required for safe shutdown, andto mitigate a design basis accident assuming a single active component failure coincident with aloss of offsite power.e)The systems shall be able to perform its safety related functions after any of the following naturalphenomena:1)safe shutdown earthquake 2)tornado 3)hurricane 4)floodf)The systems shall be designed to withstand:1)the effects of external and internal missiles, as discussed in Section 3.5 2)the effects of pipe rupture, as discussed in Section 3.6 and WSES-FSAR-UNIT-39.2-2Revision 10 (10/99)3)the environmental design conditions as discussed in Section 3.11.g)The systems shall be designed to permit periodic inspection and testing of components, to assuresystem integrity and capability.h)The CCWS is designed to provide a radiation monitored intermediate barrier between the reactorauxiliaries and the evaporative wet towers (ACCWS) during normal operation.The CCWS and ACCWS components are designed to the safety and seismic requirements listed in Table3.2-1.9.2.2.2System DescriptionThe cooling system, as shown in Figure 9.2-1 (for Figure 9.2-1, Sheet 4, refer to Drawing G160, Sheet 4and for Figure 9.2-1, Sheet 6, refer to Drawing G160, Sheet 6), for the reactor auxiliaries is divided into two separate systems:a)Component Cooling Water System (CCWS), andb)Auxiliary Component Cooling Water System (ACCWS).

The CCWS is a closed cooling water system serving all reactor auxiliaries. Heat is removed from thesystem by dry cooling towers (see Subsection 9.2.5), and by the CCW heat exchangers.The ACCWS is a separate system that provides cooling water to the CCW heat exchangers, and pumps itto the wet cooling towers for heat dissipation to the atmosphere.Design data of the CCWS and ACCWS components are listed in Table 9.2-1. Controls for the CCWS andACCWS components are described in Table 9.2-2. The equipment served by the CCWS and ACCWS under all conditions is listed in Table 9.2-3.9.2.2.2.1Component Cooling Water System The CCWS is a closed loop cooling water system that uses demineralized water buffered with a corrosioninhibitor to cool components listed in Table 9.2-3. The CCWS includes two CCW heat exchangers (tube side), three 100 percent capacity pumps, two dry cooling towers, one surge tank (baffled) and one chemical addition tank. The demineralized cooling water is pumped by the CCW pumps through the dry cooling towers and the tube side of the CCW heat exchangers, through the components being cooled and back to the pumps.The CCW surge tank is connected to the suction side of the pumps, and accommodates fluid expansionand contraction of the system. The demineralized makeup water is normally added from the Demineralized Water System to the CCWS through a control valve which is automatically actuated by the CCW surge tank level monitoring equipment. In addition, two seismic Category I CCW makeup pumps take suction from the condensate storage pool and are capable of providing makeup.

WSES-FSAR-UNIT-39.2-3Revision 9 (12/97)Two CCW pumps normally operate. A third pump is provided as a standby. The motors of the twonormally operating pumps are connected to buses in separate electrical divisions, A and B. The third pump is available to replace an on-line pump that is unable to perform its function. The standby pump is connected to the A/B bus and may be manually aligned to either A or B division (see Subsection 8.3.1.2.3).The CCWS supplies cooling water to two redundant safety-related essential loops, a nonessentialseismically qualified loop, and a nonessential nonseismic loop.Each essential loop services the following equipment:

a)one emergency diesel generatorb)one essential services water chillerc)two containment fan coolersd)one high pressure safety injection pump and the standby high pressure injection pump (valvedinto one train only)e)one low pressure safety injection pumpf)one containment spray pumpg)one shutdown cooling heat exchangerh)Post-Accident Sampling System (PASS)The nonessential seismically qualified loop services the following equipment:a)one letdown heat exchanger b)one fuel pool heat exchanger c)four reactor coolant pump seals and motor coolers (seismically supported) d)control element drive mechanism (CEDM) coolers (seismically supported) e) one backup fuel pool heat exchanger The nonessential, nonseismic loop services the following equipment:

a)waste gas compressors b)sample coolers c)chemical feed tank d)boric acid and waste concentrators WSES-FSAR-UNIT-3 9.2-4 Revision 307 (07/13)

(EC-30976, R307)

During normal operating conditions, the two operati ng CCW pumps are connected on the pump suction and discharge, and supply cooling water into common headers serving safety and non-safety equipment.

During either shutdown, refueling, or defueled operating conditions it is possible to provide adequate CC

support with only one loop. CCW maintenance and modifi cation will occur during either MODE 5, MODE 6, or when defueled on one loop at a time when c onditions allow a single CC loop to provide adequate cooling for plant systems. Upon SIAS, the two redundant safety loops will be automatically isolated from each other by closure of two fail close pneumatic header isolation valves (3CC-F121B, 3CC-F123B) and the nonessential, nonseismically qualified loop will be aut omatically isolated from both by closure of two fail closed pneumatic valves (3CC-F133A/B, 3CC-F132A/B). The CCW pump suction and discharge header isolation valves will also close on SIAS. The outlet valve on the "A" shutdown heat exchanger

CC-963A (3CC-F130A) remains closed but may be opened manually from the control room, the outlet valve CC-963B (3CC-F131B) on the "B" shutdown heat exchanger goes full open automatically. The A loop also continues to provide cooling to the R eactor Coolant Pumps via the nonessential seismically qualified loop. (EC-30976, R307)

Following isolation, on SIAS, separate CCWS channels are formed, and each supplies cooling water in sufficient quantity and at the required temperature to remove 100 percent of the heat necessary to shutdown the reactor.

(EC-30976, R307)

Upon CSAS, the containment isolation valves (2 CC-F146A/B, 2CC-243A/B, 2CC-F147A/B) on the supply and return lines of CCW to the Reactor Coolant Pu mps and CEDM coolers are automatically isolated, and the outlet valve CC-963A (3CC-F130A) on the A shutdown heat exchanger goes full open automatically. (EC-30976, R307)

The required NPSH for the CCW pumps is provided by a surge tank located approximately 70 ft. above the pumps. The surge tank is provided with a ba ffle plate and redundant level indication and controls to ensure that water ,loss in one CCWS channel will not affect the redundant channel operation. Low Surge Tank level will isolate the respecti ve CCW train (see Table 9.2-5). Over flow from the surge tank is piped to the waste drains leading to the Waste Management System.

The chemical feed tank in the system permits m anual on-line addition of proper corrosion inhibitor. A commercial corrosion inhibitor is used to maintain proper corrosion protection for the Component Cooling Water System.

A filtration system consisting of two sets of filter s arranged in series is provided on the non-essential loop for maintaining CCW water purity. Each filter housing is provided with a set of isolation valves to allow for on-line filter maintenance.

A continuously operating radiation monitor is pr ovided in each of the redundant headers on the discharge loop of the CCW pumps. Additional radiation monitoring is provided to monitor radioactivity of the cooling water from the components inside the containment; i.e

., reactor coolant pump, motor and seal coolers, and control element drive mechanism. Should activity in the system rise above the set limit, a high radiation alarm is actuated in the main control room. A more complete discussion of the CCWS radiation monitors is provided in Section 11.5.

WSES-FSAR-UNIT-3 9.2-5 Revision 11-A (02/02)The temperature controls for the ACCWS components are described in Table 9.2-2 and in Subsection 9.2.5.The ACCWS consists of two 100 percent capacity, independent loops. Each loop includes a pump, and an evaporative wet type mechanical draft cooling tower. Each tower has a basin which is capable of storing sufficient water to bring the plant to safe shutdown under all accident conditions. Subsection 9.2.5 contains

a detailed description of the ultimate heat sink.The system is divided into two separate loops, each serving one of the redundant CCWS trains. ACCWS water is pumped by the ACCW pumps through the shell side of the CCW heat exchangers to the wet cooling towers. The ACCW pumps then take suction from the basin of their respective cooling tower to complete the path to the CCW heat exchanger. The ACCW pumps are designed with sufficient NPSH for

105°F cooling tower basin water temperature and minimum water level. The ACCW pump motors are connected to separate Class 1E buses, one in each electrical division.

The ACCWS provides cooling water to the Essential Services Chilled Water System chillers, whenever the CCWS temperature exceeds a maximum setpoint of 105

°F (102°F nominal). Chiller supply valves alignautomatically to ACCW when CCW temperature exceeds the nominal setpoint. Temperature control to the

Chiller is described in Table 9.2-2.

Each basin is provided with an independent, non-safety related filtration/chemical addition system tomaintain water purity and pH. This system consists of a pump, filter, and chemical feed tank. The pump

takes suction from the bottom of the basin, and discharges through a filter housing and spray headers at the

top of the basin to aerate the water.

9.2.2.2.2 Auxiliary Component Cooling Water System The system also includes a Jockey Pump which operates when the ACCW Pump is idle to keep the piping upstream of ACC-126A(B), the CCW Heat Exchanger Outlet Temperature Control Valve, full of water and pressurized during normal operations. In the event the high point pressure decreases due to a Jockey

Pump capacity, the ACCW Pump will automatically start on a low pressure signal in order to ensure the system remains full. The Jockey Pump is not required to operate post-accident.

9.2.2.3 Safety Evaluation(DRN 00-691)

A failure modes and effects analysis is provided in Table 9.2-4. This table demonstrates that the CCWS andACCWS is capable of providing sufficient cooling capacity to cool the system components listed in Table

9.2-3 with only one loop in operation and bring the plant into a safe shutdown condition under all conditions.(DRN 00-691) 9.2.2.4 Testing and Inspection The CCWS is continuously operating, and continuously monitored by the plant monitoring computer forperformance, capability, and availability of its components. If not in continuous operation, the ACCWS is

periodically started, and monitored by the computer for performance, capability, and availability of its components. Prior to installation, the CCWS and ACCWS components are tested and inspected according

to the requirements of ASME Section III. The pumps are tested for performance at manufacturer shops.

The CCWS and ACCWS preoperational and functional tests are described in Section 14.2. The CCW and ACCW pumps and automatic valves will be tested as described in Subsection 3.9.6.

In-service inspection for the CCWS and ACCWS components will be performed in accordance with the requirements of ASME Code Section XI as described in Section 6.6.

WSES-FSAR-UNIT-3 9.2-6 Revision 11-A (02/02) 9.2.2.5 Instrumentation Application Instrumentation related to the CCWS and ACCWS is discussed in Section 7.4 and safety related displayinstrumentation is identified in Section 7.5. Indicating lights are provided to monitor equipment status. Each

motordrive component has "On" and "Off" indicating lights; each remotely controlled open/shut service valve has corresponding open/shut light indications; and each breaker control switch has an associated open/shut indicating light. The red light is used to indicate an operating status, and the green light indicates that

equipment is not in an operating status.

Indicating instruments are provided as shown in Table 9.2-5.

9.2.3 DEMINERALIZED WATER MAKEUP SYSTEM(DRN 01-111)

Demineralized water is produced by processing potable water from the St. Charles Parish Water System.

The potable water is initially stored in the Primary Water Treatment Plant Clearwell Tank. The water is thentransferred from the Clearwell Tank, via the Clearwell Transfer Pumps, to the Demineralized Water System(subsection 9.2.3.2) where it is demineralized, deaerated and stored.

9.2.3.1 Primary Water Treatment Plant 9.2.3.1.1 Design Bases The Primary Water Treatment Plant (PWTP) is no longer used for processing raw water from the MississippiRiver. The PWTP has been inactivated except for the Clearwell T ank, Clearwell Transfer Pumps, associatedpiping, valves, instrumentation and controls. The inactivated portions of the Water Treatment Plant have been isolated from other plant systems by closing isolation valves and opening circuit breakers.

The operable portion of the Primary Water Treatment Plant functions as a quality water source for the following plant systems and components:a)Demineralized Water System b)Sealing and cooling water source for the circulating water pumps and motors, screen wash pumps and the air evacuation pumpsc)Fire Water Storage Tanks (the PWTP functions as a secondary makeup water source) 9.2.3.1.2S ystem DescriptionThe operable portion of the PWTP consists of a Clearwell Tank, two transfer pumps, associated piping,valves, instrumentation and controls. The Clearwell Tank acts as a water reservoir. The Potable Water System maintains a constant volume of water in the tank. The Clearwell Transfer Pumps provide water totheDemineralized Water System and makeup to the Fire Water Storage Tanks. The CW Pump Bearing

Lubrication Water Pumps take suction on the Clearwell Tank in order to provide sealing and cooling water tothe Circulating Water Pumps, Screen Wash Pumps and the Air Evacuation Pumps. System piping and

components are shown on Figure 9.2-2.(DRN 00-691)The inactivated portion of the PWTP is located in the Water Treatment Building. The operable portion of thePWTP is located in the Water Treatment Building and the adjacent area north of the building.(DRN 00-691;01-111)

WSES-FSAR-UNIT-3 9.2-7 Revision 11-A (02/02)(DRN 01-111)(DRN 01-111) 9.2.3.1.3 Safety EvaluationThe PWTP serves no safety function since it is not required to achieve safe shutdown or mitigate theconsequences of an accident. While the operation of the PWTP is necessary to maintain the flow of makeup water to the condensate storage pool (via the DWS and the demineralized water storage tank), thesupply of water in the condensate storage pool is monitored and plant operation following receipt of a low-

level alarm is described in the Technical Specifications and Subsection 9.2.6.The majority of PWTP components are located in the Water Treatment Building and some components are located adjacent to the Water Treatment Building on the north side, which is physically separated from all seismic Category I structures. The failure of any PWTP equipment cannot affect any safety-related

equipment.

As the system serves no safety function, there are no safety class or seismic design requirements.

9.2.3.1.4 Testing and Inspections(DRN 01-111)All equipment will be tested prior to operation to ensure the proper functioning of all components. Theequipment is proven operable through normal plant operation. Periodic maintenance insures proper

operation of equipment.

9.2.3.1.5 Instrumentation ApplicationInstrumentation for manual control of the system is provided. Local and remote alarms are provided for lowwater level in the Clearwell Tank.(DRN 01-111)

WSES-FSAR-UNIT-3 9.2-8 Revision 11-A (02/02)(DRN 01-111)(DRN 01-111) 9.2.3.2 Demineralized Water System 9.2.3.2.1 Design Bases The DWS is designed to utilize vendor supplied services to provide a supply of demineralized and deaerated water sufficient for the expected makeup demands for plant startup and operation with allowance for a

normal amount of downtime for maintenance.The DWS is shown on Figures 9.2-2. The DWS is designed to normally supply approximately 200 gpm of demineralizer water to the following:a)demineralized water storage tank b)condensate storage tank c)primary water storage tank

The DWS is designed to produce demineralized water at the design flow rates meeting the following effluent parameters:

Specific conductivity @ (25

°C) 77°F0.1micromho/cm PH @ (25°C) 77°F6-8 Sodium0.001ppm Silica (as Si0 2)0.01ppm Dissolved Oxygen0.100ppmChloride (as Cl)0.001ppm Total Organic Carbon0.100ppm Note: The pH and conductivity apply after correction is made for dissolved C0 2.(DRN 01-111)

The system is designed to process water based on the following analysis:

(DRN 01-111)

WSES-FSAR-UNIT-3 9.2-9 Revision 11-A (02/02)All quantities, except as noted, are expressed in parts per million as CaC0 2 Substance Mississippi River Water (Avg)Calcium 117Magnesium 58 Sodium 46 Bicarbonate 132 Carbonate 0 Sulfate 53 Chloride 34 Fluoride 1

Carbon Dioxide as (C0

2) 2.5 (Calculated)

Silica as (Si0

2) 10Turbidity (APHA units) less than 1pH 8.09.2.3.2.2S ystem Description The system, located in the Water Treatment Building, consists of flanged connections for connecting the vendor equipment and a DW Analyzer Control Panel which has a variety of instruments for monitoring the quality of the water produced by contractor or rental equipment. The water flows through an automatic 3-

way ball valve which will divert the demineralized water to the Regenerative Waste Sump if it does not meetminimum requirements. Alarms are provided locally and on Control Room panel CP-1 to provide indication of system anomalies. Water is supplied to the system from the PWTP clearwell transfer pumps.(DRN 01-111)Flow through the system is manually controlled. Upon low level in either the primary water tank,condensate storage tank or demineralized water storage tank, the PWTP and makeup dem ineralizer arestarted manually. Water is transferred from the clearwell via the Clearwell transfer pumps to the vendor supplied services for deminaralization and deaeration. The discharge of the vendor supplied system is thennormally directed to the demineralized water storage tank. Makeup water is manually transferred to the condensate storage tank and primary water storage tank when needed. The demineralized water storage

tank, condensate storage tank and primary water storage tank are provided with a nitrogen blanket which maintains dissolved oxygen content of the water to approximately 50 ppb.(DRN 01-111)

WSES-FSAR-UNIT-39.2-10 Revision 11-A (02/02)

The waste from the vendor supplied system is discharged in the regenerative waste sump and pumped tothe waste processing facility of Waterford SES Units 1 and 2 where the pH is adjusted. From there the

effluent is discharged into the circulating water discharge of Units 1 and 2.

9.2.3.2.3 Safety Evaluation The DWS serves no safety function since it is not required to achieve safe shutdown or mitigate theconsequences of an accident. See Subsection 9.2.3.1.3 for a discussion of the effect of loss of flow to the

condensate storage pool.

Portions of the DWS are located in and adjacent to the Water Treatment Building, which is physicallyseparated from the seismic Category I structures. The failure of any DWS equipment cannot affect any

safety related equipment.

As the system serves no safety function, there are no safety class or seismic design requirements.

9.2.3.2.4 Testing and Inspection(DRN 00-691)

The 3-way Control Valve can be tested by operating the unit in the manual mode to check valve operation.Pumps will also be tested individually. All equipment will be tested prior to operation to ensure the proper functioning of all components. The system is proven operable through normal plant operations. Periodic

maintenance ensures proper operation of equipment.(DRN 00-691) 9.2.3.2.5 Instrumentation Application The DW Analyzer Control Panel contains instrumentation to monitor the following:

°pH° Silica°Dissolved Oxygen

° Sodium° Conductivity

° Total organic carbon If the water quality does not meet or exceed the setpoint for any of these instruments the 3-way automatic ball valve will divert flow to the Regenerative Waste Sump and alarm locally and in Control Room panel CP-1

to provide indication of system anomalies.

A Sample Sink is also provided in the DW Analyzer Control Panel to provide grab samples from fivelocations on the vendor equipment and the final demineralized water effluent.

WSES-FSAR-UNIT-39.2-11Revision 8 (5/96)9.2.4POTABLE AND SANITARY WATER SYSTEM9.2.4.1Design BasisThe Potable and Sanitary Water System provides the plant with water suitable for human consumption,and for the operation of all sanitary plumbing fixtures and selected equipment. The Potable and Sanitary Water System provides potable water, both hot and cold, at required design pressures, flow rates and temperatures.The Louisiana State Plumbing Code was the governing document used for the design of the PSWS.

9.2.4.2System DescriptionThe St. Charles Parish Water System furnishes a metered supply of potable water to the site throughmunicipal water mains. A valved connection supplies the majority of the water via a backflow prevention and metering station located at the southeast corner of the plant site. The potable water distribution system then supplies water to various buildings throughout the site.A branch from this system supplies the majority of the various demands inside the Protected Areaincluding the following fixtures and equipment in the Administration Building, Chiller Building, Fuel Handling Building, Polisher Building, Reactor Auxiliary Building, Service Building, and Turbine Building:a)toilet and showers,b)drinking fountains,c)emergency shower, WSES-FSAR-UNIT-3 9.2-12 Revision 303 (06/09) d) personnel decontamination areas, e) laundry facilities,

f) mop sinks, service sinks, wash-up sinks,

g) food service equipment and kitchen units, and (DRN 01-111, R11-A EC-530, R303)

The water distribution system also supplies makeup water to the fire water storage tanks and to the Primary Water Treatment Plant clearwell tank located inside the protected area. (DRN 01-111, R11-A)

In addition, a hose connection in the makeup water suppl y to the fire water storage tank is provided to allow makeup to be provided from the potable water system to the wet cooling tower basins post tornado.

A separate and independent backflow prevention and metering station provides St. Charles Parish

potable water to the Maintenance Support Building from a parish water main located adjacent to state road LA-18. A branch line from the potable water s upply to the (MSB) with a backflow preventer is provided to allow makeup water to be supplied from the potable water system to the wet cooling tower basins post tornado. (EC-530, R303)

The Potable and Sanitary Water System distribution piping is sized to operate at a maximum velocity of seven ft./sec. The system provides a minimum of 25 ps i pressure at the uppermost plumbing fixtures in each building.

Electric hot water heaters of sufficient heating and st orage capacity are provided for all required plumbing

fixtures. Circulating pumps assure readily available hot water at demand.

Sanitary waste water from all site facilities are collected in one of seven sewage lift stations located around the plant site. The waste water is ultimately transferred to the St. Charles Parish Killona sewage treatment facility.

9.2.4.3 Safety Evaluation

The Potable and Sanitary Water System is not cro ss connected to any fixture or equipment having the potential for containing radioactive or other toxic ma terials. Therefore, there is no possibility of contamination to the system.

The failure of non-safety Potable and Sanitary Water System components which could affect the operation of safety related equipment (i.e. mechani cal equipment and piping, HVAC ducts, electrical cable trays and conduits, instrumentation and controls) are investigated with respect to the area of influence of the failed Potable and Sanitary Water Sy stem component. Interactions are eliminated by

adherence to criteria stated in Subsection 3.2.1.

(DRN 01-25, R11-A) 9.2.4.4 Test and Inspections All parts of the Potable and Sanitary Water System are subject to a hydrostatic pressure test utilizing the system working pressure for a period of two hour

s. The system is tested and cleaned before being put into operation. (DRN 01-25, R11-A) 9.2.4.5 Instrumentation Application (DRN 06-910, R15)

The main water supply for the Reactor Auxiliary Bu ilding including sanitary and kitchen facilities located within the control room envelope can be shutoff by an el ectrically operated valve.

The control switch is located in the control room proper. The valve is normally closed until energized by the operator and fails closed on loss of power. This design precludes the possibility of main control room flooding during a seismic event or other failure of the system. (DRN 06-910, R15)

WSES-FSAR-UNIT-3 9.2-13 Revision 303 (06/09) 9.2.5 ULTIMATE HEAT SINK

The function of the ultimate heat sink is to dissipat e the heat removed from the reactor and its auxiliaries during normal unit operation, during refueling, or after a design basis accident.

9.2.5.1 Design Basis

The design bases for the ultimate heat sink are:

a) The ultimate heat sink has sufficient capacity to dissipate heat removed from the reactor and its auxiliaries during normal unit operat ion, shutdown and refueling.

b) The ultimate heat sink has sufficient capacity to dissipate heat removed by the CCWS and ACCWS after a design basis accident, assuming a single active failure coincident with a loss of offsite power and the historically worst combination meteorological condition of 102 F dry bulb temperature and associated 78 F wet bulb temperature.

c) The ultimate heat sink has sufficient c apacity to dissipate heat removed by the CCWS and ACCWS from the reactor and its auxiliaries to permi t safe shutdown of the unit coincident with a loss of offsite power, multiple tor nado missiles and single active failure.

(EC-530, R303) d) The ultimate heat sink has a minimum of 30 day s post LOCA water supply from wet cooling tower basins for long term cooling. Replenishment of the wet cooling tower basins from on site water sources and/or the Mississippi River may be r equired in response to a tornado event as discussed in Subsections 9.2.5.3.2 and 9.2.5.3.3. (EC-530, R303) e) The ultimate heat sink equipment is able to perform design functions following any of the following design basis natural phenomena;

1) safe shutdown earthquake
2) tornado
3) hurricane
4) flood

The ultimate heat sink is designed to safety class 3 and seismic Category I requirements.

9.2.5.2 System Description

The ultimate heat sink consists of dry and wet cooling towers and water stored in the wet cooling tower basins. This arrangement is shown on Figures 1.2-24 and 25, and the design parameters of the principal

components are summarized in Table 9.2-8. Each of two 100 percent capacity loops employs a dry and wet cooling tower. The fan motors of one dry and one wet cooling tower are connected to the electrical safety related bus A and those of the other to bus B.

Electrical cooling tower loads will automatically be sequenced on the diesel generators in case of loss of offsite power.

Each dry cooling tower has been sized to dissipate to the atmosphere approximately 60 percent of heat removed by the CCWS after a LOCA assuming histor ically highest ambient dry bulb temperature (102 F), as shown in Figure 9.2-4. The heat removal capacity of the dry coo ling towers varies significantly depending on the component cooling water temperatur e, dry bulb atmospheric temperature and heat removed by the ACCWS. The heat removal capacit y under various dry bulb temperatures assuming the ACCWS is not operating and CCWS water WSES-FSAR-UNIT-3 9.2-14 Revision 306 (05/12) temperature is maintained at 95 F is shown in Figure 9.2-5.

Each dry cooling tower consists of five separate cells, each cell contai ning two 40 ft. long vertical cooling coils, arranged in a "V" shape. Cooling air for each ce ll is provided by three fans, each fan driven by a 40 horsepower, two speed motor. The dry cooling tower fans can be started and shutoff automatically to maintain the CCWS temperature between 88 F and 92 F. Two speed fans assure good temperature control and quiet operation.

(EC-32877, R306)

The cooling coils of three dry cooling tower cells of each tower (60 per cent) are protected from tornado missiles by grating located above the coils and capabl e of withstanding tornado missile impact. Grating design is described in Section 3.5. Dry cooling tower fans and motors are protected from tornado missiles by building walls and/or access platforms.

The motor control centers and the transformers for the dry and wet cooling towers are protected from tornado missiles by grating capable of withstanding tornado missile impact. (EC-32877, R306)

All dry cooling tower components are designed for safe shutdown earthquake loads and the maximum pressure differentials caused by the design tornado.

Component cooling water to and from each dry cooling tower coil can be isolated by manually operated

valves for maintenance. Dry cooling towers can al so be automatically bypassed to assure uninterrupted Component Cooling Water System operation in case of sudden damage to the coils, such as tornado missiles.

Each wet cooling tower is sized to dissipate to t he atmosphere approximately 40 percent of heat removed by the CCWS after a LOCA, assuming the co incident ambient wet bulb temperature (78 F) at the historically highest ambient dry bulb temperature (102 F).

The capacity of the wet cooling tower varies significantly, depending on the component cooling water temperature to be maintained and atmospheric wet bul b temperature. The heat removal capacities under various conditions for combinations of one dry and one wet cooling tower are indicated in Table 9.2-9.

Each wet cooling tower consists of two cells, each cell is serviced by four induced draft fans, and each fan driven by a 30 horsepower, single speed motor. Pr incipal components of the wet cooling towers are summarized in Table 9.2-8.

All wet cooling tower components are designed for safe shutdown earthquake loads and the maximum

pressure differentials caused by the design tornado.

Wet cooling towers remove heat from the Component Cooling Water System by a separate Auxiliary Component Cooling Water System as described in Subs ection 9.2.2. ACCWS takes water from the wet cooling tower basin, pumps it through the co mponent cooling water heat exchanger where its temperature is raised, and then to the wet cooli ng tower for heat dissipation to the atmosphere (see Figure 9.2-6).

The ACCWS can also be used to maintain the CCWS temperature below the range maintained by the dry cooling tower fans during normal operation if desired.

The setpoint for the ACCWS temperature control valve can be manually set below 88 F to allow ACCWS flow to modulate and control CCWS temperature.

When operating from the control room, with the fans control switch in the aut omatic position, the wet cooling tower fans 1 through 4 and 5 through 8 will star t automatically whenever the water temperature in the basin exceeds the setpoint temperature and stop automatically.

WSES-FSAR-UNIT-3 9.2-15 Revision 307 (07/13)

Manual controls are provided in the main contro l room and on the auxiliary shutdown panel for starting and stopping the wet cooling tower fans.

(DRN 03-2063, R14)

Each wet cooling tower basin contains sufficient wa ter for ultimate heat sink operation without makeup after a LOCA. Basins are interconnected by a valved Seismic Category I four inch line to allow 100

percent margin of safety for available water s upply. Wet cooling towers are not required after approximately eight days following a LOCA, as indicat ed on Figure 9.2-4. Post LOCA water requirements are summarized in Table 9.2-10. Wet cooling tower operation during normal shutdown is intermittent and water requirements are considerably smaller. (DRN 03-2063, R14)

The wet cooling tower basins are treated to ensure that deposits from the cooling water will not collect on

heat exchanger surfaces at the end of wet cooling towe r operation. Makeup to the basin is demineralized water. Basin water is periodically sampled for conductivity.

9.2.5.3 Safety Evaluation

9.2.5.3.1 Capacity

The ultimate heat sink is designed, and sufficient wa ter is stored in one wet cooling tower basin, to provide sufficient cooling for 30 days or longer and to permit safe shutdown and cooldown of the plant and maintain it in a safe shutdown condition without additional make-up water. To conserve water, the system is so designed that the dry cooling to wers are operating at full capacity post accident.

Total heat removed by one train of the ultimate heat sink after the design basis conditions is shown in Figure 9.2-4. Figure 9.2-4 also shows the calcul ated heat dissipation by one dry cooling tower and the heat dissipation required by one wet cooling tower.

Credit has been taken for storage in one wet cooling tower basin only. The basins of both wet cooli ng towers are interconnected, thereby providing 100 percent redundancy.

(EC-38632, R307)

Table 9.2-9 indicates the heat removal capacity of the ultimate heat sink under various conditions. It also indicates the required heat removal due to normal operation, shutdown and refueling operating modes.

Dry cooling tower fan operability is mainta ined by operating in fast or auto mode. (EC-38632, R307)

Figure 9.2-4a shows the integrated heat removed by the wet cooling tower for calculation of post-LOCA water storage requirements. Table 9.2-10 shows wate r storage requirements in wet cooling tower basins and the assumptions used in the basin sizing calculations.

9.2.5.3.2 Meteorological Conditions

The ultimate heat sink design is based on the met eorological conditions listed in Table 2.32(a) and discussed below:

a) Heat Removal Capacity

The dry and wet cooling tower design heat removal is based on the worst combination meteorological condition of 102 F dry bulb temperature and associated 78 F wet bulb WSES-FSAR-UNIT-3 9.2-16 Revision 307 (07/13) temperature. Equivalent meteorological conditi ons are given in Figure 9.2-5a. In addition 1.9 F has been added to the design dry bulb temperature, and 1.0 F to the design wet bulb temperature to account for possible recirculation.

b) Stored Water Requirements

Dry bulb temperature is the most significant parameter for water storage requirements of the ultimate heat sink, because it determines heat re moved by dry cooling towers. A high dry bulb reduces the heat removal capacity of the dry towe rs, so the wet towers must reject more heat and thus evaporate more water. The following assumptions have been used in calculating the required water storage for the ultimate heat sink.

(DRN 03-2063, R14)1) The wet cooling towers will operate for at mo st eight days post-LOCA. Conservatively, the maximum 3-day average dry bulb temperature of 89 F was used in the calculations of water inventory. The maximum 7-day average dry bulb temperature is 86 F. (DRN 03-2063, R14)

2) 2.0 F has been added to the maximum 3-day average dry bulb temperature of 89 F to account for possible recirculation. (DRN 05-1652, R14-B)3) A wet bulb temperature of 76 F and 50 percent relative humidity was used to calculate the evaporation losses over the eight day period of wet tower operation. The above wet bulb-temperature and relative humidity are associated with the maximum 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> dry bulb temperature. (DRN 05-1652, R14-B) 4) The Essential Chiller is manually realigned to the CCWS when CCWS temperature is <

110 F. (DRN 03-2063, R14; 05-1652, R14-B; EC-8465, R307)5) When adding the non-essential load of fuel pool cooling, approximately 113,807 gallons of makeup is required to the WCT basin if only one UHS Train is available. Adequate makeup can be supplied to a WCT basin by gr avity feeding from the Circulating Water System or the unavailable WCT basin. (DRN 03-2063, R14; 05-1652, R 14-B; EC-8465, R307) (EC-530, R303)6) If available, additional makeup for the wet cooling tower basins can be supplied from onsite storage tanks (CST, FWST, DWST, PWST

). Provisions are in place (hose connections) to draw water from these source s, post tornado, via a non-safety related, portable diesel driven pump, which will suppl y water via hose directly to the basin.

Additional makeup can also be provided directly to the wet cooling tower basins using a fire hose from the MSB potable water supply and fire hydrant #9. In the event these sources are not available, provisions are in place to utilize the portable diesel driven pump to supply water from the Mississippi Rive r to the Circulating Water system, which can be used to gravity feed makeup to the basin via the path described in 5) above. (EC-530, R303) 9.2.5.3.3 Site Related Phenomena

Wet and dry cooling towers are designed for safe shutdown earthquake loads and also to withstand differential pressure which may be induced by a tornado or postulated explosions at the site.

The wet and dry cooling towers are designed to ens ure low probability of damage by tornado missiles by the following features:

a) The cooling towers are protected on all sides by the plant outside walls up to elevation + 30ft. MSL.

b) The cooling towers have been designed with multiple cells (five cells for each dry cooling tower and two cells for each wet cooling tower), and multip le fans (15 fans for each dry and eight fans WSES-FSAR-UNIT-3 9.2-17 Revision 308 (11/14) for each wet wet cooling tower), to ensur e that damage by tornado missiles would not significantly affect heat removal capability.

Table 9.2-9 indicates approximate heat removal capacity of the system when portions of we t cooling tower components are damaged by tornado missiles.

c) In addition to the multiple cells and fans wh ich reduce the probability of damage to the cooling towers by tornado missiles, 60 percent of the dry cooling tower coils have been protected by grating located above them and designed to with stand tornado missiles. The arrangement of safety related cooling tower components protec ted by grating is shown in Figure 1.2-24.\ (DRN 05-446, R14; EC-530, R303)

Sixty percent of the dry cooling towers, in conjunction with the Emergency Feedwater System (EFS) and the wet cooling towers (without fans

), will provide sufficient heat dissipation to atmosphere and will assure safe shutdown of the unit after a design basis tornado under the following conditions: (DRN 05-1668, R14)

(DRN 05-1668, R14; EC-530, R303) 1) Assumed worst case single failure (loss of one emergency diesel generator), coincident with a loss of offsite power. (EC-530, R303; LBDCR 13-018, R308)

2) The Emergency Feedwater System is utilized to remove reactor decay heat until such time that the sum of the decay heat and the plant auxiliary heat loads are equal to or less than the heat transfer capacity of the operable dry cooling towers for 120°F CCW outlet temperature. (LBDCR 13-018, R308)

(DRN 99-0999)

3) After the volume of the condensate stor age pool (170,000 gallons) is exhausted, makeup water for the Emergency Feedwater System c an be provided from the wet cooling tower basins (approximately 333,000 gallons). (DRN 99-0999;05-446, R14) 4) Heat removal can be continuous by all or any of the following means:

(a) Prior to the wet cooling tower basins water volume being depleted makeup water to the wet cooling tower basins can be supplied by gravity from the underground

Circulation Water System to permit c ontinuous heat removal from the Component Cooling Water System. Permanent piping fr om the Circulating Water System to the wet cooling tower basins is provided fo r this purpose. This make-up piping is non-seismic. However, it terminates abov e the wet cooling tower basin's maximum water level and its failure, there, would not cause loss of wet cooling tower basin

volume.

Additional makeup for the wet cooling towe r basins is available from onsite storage tanks (CST FWST, DWST, PWST) if t hese water sources are available post tornado. Provisions are in place (hos e connections) to draw water from these sources via a non-safety related, portabl e diesel driven pump, which will supply water via hose directly to the basin. Additional makeup can also be provided

directly to the wet cooling tower basins using a fire hose from the MSB potable

water supply and fire hydrant #9. (LBDCR 13-018, R308)

In the event the onsite water sources are not available, provisions are in place to utilize the portable diesel driven pump to supply water from the Mississippi River via the Circulating Water system, which can be used to supply makeup to the basin via the path described above. The analysis shows that replenishment using pumps and/or hoses from onsite water sources is required in approximately 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> in order not to rely on raw river water for cooling or in approximately 68 hours7.87037e-4 days <br />0.0189 hours <br />1.124339e-4 weeks <br />2.5874e-5 months <br /> if the Circulating Water system gravity feed is used. (EC-530, R303; LBDCR 13-018, R308)

WSES-FSAR-UNIT-3 9.2-18 Revision 303 (06/09)

(b) By replacing or repairing damaged wet cooli ng tower fans to assure availability of wet cooling tower. (DRN 05-446, R14; EC-530, R303) (c) In order to conserve wet tower basin water, the only auxiliary heat load that remains on the wet cooling towers is the essential chiller once the undamaged 60

percent of the available dry cooling towe rs are returned to service (2 hrs post tornado). At this time, plant auxiliary heat loads are dissipated using the dry cooling towers, which will operate at full capacity until the wet cooling tower can be removed from service. (EC-530, R303)

5) In the unlikely event of a tornado strike to the dry cooling tower, damage by the tornado missiles to the dry cooling tower coils is aut omatically detected by a decrease in the CCW surge tank water level and the dry cooling towe rs are automatically bypassed. Wet cooling tower basins have sufficient water storage capac ity to remove the heat from the vital services for approximately two hours. This time period allows the operator to isolate the damaged dry cooling tower cells and put the operable dry cooling tower cells back into service. (DRN 05-446, R14) 9.2.5.4 Testing and Inspection

Performance of wet and dry cooling towers is monitor ed by the plant monitoring computer to assure its performance capability and availability.

The dry and wet cooling tower preoperational and func tional tests are described in Section 14.2. In-service inspection of cooling tower components will be performed in accordance with the requirements of

ASME Code,Section XI.

9.2.5.5 Instrumentation Application

Table 9.2-11 lists the safety related instrumentati on associated with dry and wet cooling towers and wet cooling tower basins.

9.2.6 CONDENSATE STORAGE FACILITIES

9.2.6.1 Design Bases

Condensate Storage System is designed to:

a) provide initial fill and make-up water for the condenser hotwell, (DRN 99-2227, R11) b) provide initial fill and make-up to t he auxiliary boiler feedwater subsystem, (DRN 99-2227, R11) c) provide initial fill and make-up water for the condensate storage pool, d) provide initial fill and make-up wate r for the refueling water storage pool, e) provide water for the Chemical Feed System,

f) provide water to the decontami nation facility and hot machine shop, g) provide make-up water for the stator coolers,

h) provide water to the Reactor Building,

i) provide water to the ultrasonic unit, c hemical cleaning line, Sampling System and CCWS radiation monitor cabinets, WSES-FSAR-UNIT-3 9.2-19 Revision 303 (06/09) j) provide make-up water to the Turbine Building Closed Cooling Water System, k) provide water for the wa shing of spent fuel casks,

1) provide seal water to the inst rument and station air compressors, m) provide make-up water to the supplementary chilled water expansion tank,

n) provide make-up water to the CCW surge tank.

The only portion of the system that is designed to Sa fety Class 2 and seismic Category I requirements is the containment penetration piping and valves.

9.2.6.2 System Description

The Condensate Storage System is shown schematically on Figure 9.2-2.

The Condensate Storage System c onsists of the following:

a) one 100 percent capacity, condensate transfer pump, b) two 100 gpm condensate storage tank pumps,

c) one 260,000 gallon capacity condensate storage tank,

d) one 100 percent capacity, hotwell transfer pump,

e) one 500,000 gallon capacity, demineralized water storage tank,

f) piping, valves and instrumentation. (DRN 99-2252, R11;01-559, R11-A)

Deaerated water from the make-up demineralizer is stored in the condensate storage tank and the demineralized water storage tank located in the yard. The condensate storage tank is blanketed with pressurized nitrogen to maintain deaerated inventory of condensate. The demineralized water storage

tank is blanketed with nitrogen to approximately 2.

5 inches water (gauge) pressure to maintain a deaerated inventory of condensate. (DRN 99-2252, R11;01-559, R11-A)

The condensate transfer pump and the condensate storage t ank pumps can take suction from either the condensate storage tank or the demineralized water storage tank. The hotwell transfer pump can take suction only from the condensate storage tank.

Normally, the condensate transfer pump and the condensate storage tank pumps are isolated from t he Condensate Storage Tank by a set of isolating valves. The equipment and systems listed in Subsec tion 9.2.6.1 normally receive their water supplies from the demineralized water storage tank. Initial fill of the condenser and the condensate system will be accomplished by transferring water from the condens ate storage tank via the hotwell transfer pump and transferring water from the demineralized water stor age tank via the condensate transfer pump. Make-up water to the condensers will normally be transferred from the condensate storage tank via the hotwell transfer pump.

Design data for the condensate storage tank, condens ate transfer pump with condensate storage tank pumps , demineralized water storage tank and hotwe ll transfer pump are given in Table 9.2-12.

(DRN 01-559, R11-A)

The condensate storage tank and the demineralized wa ter storage tank contain a pressurized nitrogen blanket which prevents air in-leakage inside the tanks. Tank vacuum breakers are provided to preclude tank collapse if vacuum conditions develop.

(DRN 01-559, R11-A)

The design of condensate storage pool is described in Subsection 10.4.9.

WSES-FSAR-UNIT-39.2-20Revision 9 (12/97)9.2.6.3Safety EvaluationThe normal supply of makeup water to the Demineralized Water Storage Tank is potable water processedthrough a vendor supplied system for demineralization, which is not expected to contain radioactivity. The Condensate Storage Tank may contain radioactivity temporarily, during periods of steam generator tube leakage and receipt of condenser hotwell water, but the amount of radioactivity is limited by the temporary tank limitations provided in Technical Specifications. Since this system is not serving any safety function and as failure of any of its components will not affect the function of any of the equipment required for the safe shutdown of the unit, the system, other than the containment penetration piping and valves, is not designed to any safety class or seismic requirements.9.2.6.4Test and InspectionThe tanks are hydrostatically tested after erection at the site. The pumps are shop hydrostatically tested.The entire system is flushed and hydrostatically tested after installation.9.2.6.5Instrumentation ApplicationThe Demineralized Water Storage Tank and Condensate Storage Tank have continuous level indicationlocally at the tanks and remote in the main control room. Level indication is also provided on the plant monitoring computer. Abnormally high and low level alarms are annunciated in the main control room.

Low nitrogen blanket pressure alarm annunciation for the Demineralized Water Analyzer Control Panel located in the Water Treatment Building. This alarm is provided to warn of possible air intrusion into these tanks.A pressure gage is installed in the condensate discharge line for local indication. A flow meter is providedin the line to the auxiliary boiler feed pump suction.9.2.7TURBINE CLOSED COOLING WATER SYSTEM9.2.7.1Design BasisThe Turbine Closed Cooling Water System is designed to provide a heat sink for power cycle equipmentduring normal operation and normal shutdown. The system serves no safety function, since it is not required to achieve safe shutdown or to mitigate the consequences of an accident. It is completelyindependent of the Component Cooling Water System.9.2.7.2System DescriptionThe Turbine Closed Cooling Water System is a closed loop system which uses demineralized water toremove heat from the turbine accessories and other components in the power cycle. System component design data are given in Table 9.2-13. A schematic diagram of this system is shown in Figure 9.2-7.The water is circulated by two turbine cooling water pumps, and the heat removed via two turbine coolingwater heat exchangers is transferred to the Circulating Water System. Turbine cooling water circulates through the shell side of the heat exchangers.A surge tank, open to the atmosphere, is connected to the Turbine Closed Cooling Water System. Thetank level is automatically controlled by level switches and a level control WSES-FSAR-UNIT-39.2-21valve, with makeup provided from the condensate storage tank. A main control room alarm is initiated onboth high and low water levels.A commercial corrosion inhibitor is used to maintain proper corrosion protection for the Turbine CoolingSystem. The turbine cooling water chemistry is sampled periodically, and inhibitor added from the chemical feed tank when needed to maintain a desired concentration.The plant components cooled by the Turbine Closed Cooling Water System include:a)turbine lube-oil cooler, b)turbine electrohydraulic fluid coolers, c)hydrogen seal-oil coolers, d)generator hydrogen coolers,e)generator stator water coolers,f)exciter cooling units, g)heater drain pump seal and stuffing box coolers, h)steam generator feed pump turbine coolers,i)condensate pump motor-bearing coolers,j)condenser vacuum pumps heat exchangers, k)instrument and station air compressor jackets, l)isolated phase bus heat exchangers.

Component a,b,d,e, and h listed above, are provided with automatic temperature control valves in thecooler outlet piping.Each of two pumps in the Turbine Closed Cooling Water System is designed to provide 100 percent of thetotal system capacity. Each of two heat exchangers is sized for 50 percent of the total system capacity.

Table 9.2-14 shows operating flow with a corresponding calculated heat load for the plant componentscooled by the Turbine Closed Cooling Water System. The Turbine Closed Cooling Water System is supplied with make-up by the Condensate Storage System.9.2.7.3Safety EvaluationThe Turbine Closed Cooling Water System serves no safety function and is not needed to shut down theturbine generator and accessories after a turbine trip. A failure of any component will not affect the function of any safety related equipment.

WSES-FSAR-UNIT-39.2-22 Revision 11-A (02/02) 9.2.7.4 Testing and InspectionPrior to installation in the system, each component is inspected and cleaned.

Preoperational testing consists of calibrating the instruments, testing the automatic controls for actuation at the proper setpoints and checking the operability and limits of alarm functions.The Turbine Closed Cooling Water System is in service during normal plant operation. System performance is monitored, and data taken periodically, to confirm mechanical, hydraulic, and heat transfer

characteristics.

9.2.7.5 Instrumentation ApplicationThe turbine cooling water pump can be started and stopped from the main control room. The pump's flow ismonitored by a flowmeter with flow transmitter through the plant monitoring computer. When one pump

trips, the other pump will be automatically started.

There are a number of temperature controlled valves in the system, which control flow through the:

a)turbine lube-oil cooler, b)turbine electrohydraulic fluid coolers,c)generator hydrogen coolers, d)generator stator water coolers, e)steam generator feed pump turbine coolers, f)turbine cooling water heat exchangers, g)turbine cooling water heat exchanger bypass, and h)seal oil unit coolers.

The turbine cooling water temperature at the outlets of the equipment listed above is monitored by the plant monitoring computer.

9.2.8 PRIMARY WATER STORAGE FACILITIES 9.2.8.1 Design Bases Primary Water Storage System is designed to:(DRN 00-1054; 02-89)a)Deletedb)Deleted(DRN 00-1054; 02-89)

WSES-FSAR-UNIT-39.2-23Revision 9 (12/97)c)Deletedd)provide make-up water to various tanks, e.g., waste concentrates storage tank, dewatering tank,volume control tank, waste condensate tank, laundry tank, waste tank, etc.,e)provide lubricating and flushing water for seals of charging pumps, and f)provide water to the resin sluice header, g)provide water to the reactor drain and quench tanks.

The only portion of the system that is designed to Safety Class 2 and seismic Category I requirements isthe containment penetration piping and valves.9.2.8.2System DescriptionThe Primary Water Storage System is shown schematically on Figure 9.2-2.

The Primary Water Storage System consists of the following:

a)one 260,000 gallons capacity primary water storage tank,b)two 100 percent capacity primary water pumps,c)piping, valves and instrumentation.

Design data for the primary water storage tank and the primary water pumps are given in Table 9.2-15.

The make-up demineralizer/secondary make-up water vacuum degasifier (refer to Subsection 9.2.3)provides deaerated water for the primary water storage tank located in the yard. A nitrogen blanket exists for the PWST to maintain a deaerated inventory of primary water.The primary water pumps, located near the primary water storage tank, take water from the tank to filland/or supply make-up water as required to those components or areas specified in Subsection 9.2.8.1.9.2.8.3Safety EvaluationThis water is expected to contain insignificant radioactivity; therefore, no automatic provision is made tomeasure radioactivity. Periodic grab samples are taken and analyzed for radioactivity and the amount of dissolved oxygen.9.2.8.4Tests and InspectionThe tank is hydrostatically tested after erection at the site. The pumps are shop hydrostatically tested.After the installation the entire system is flushed and tested.9.2.8.5Instrumentation Application WSES-FSAR-UNIT-39.2-24Revision 10 (10/99)The water level in the tank is controlled by a make-up valve operated by level switches. The liquid level iscontinuously indicated on the main control panel through a level transmitter. Local pressure gages are installed in primary water pump discharge lines. Annunciation in the main control room is provided for abnormally high ior low levels in the tank and for low pressure in the common discharge header of the two primary water pumps. Local annunciation is provided for low nitrogen pressure in the PWST to alarm for possible air intrusion into the tanks.The initial operation of the primary water pumps is manual. If one pump fails to start or is tripped, theother pump starts automatically.9.2.9ESSENTIAL SERVICES CHILLED WATER SYSTEM9.2.9.1Design BasesThe purpose of the Essential Services Chilled Water System is to provide chilled water for those airhandling systems which cool spaces containing equipment required for safety related operations.The system is designed to satisfy the following criteria:a)supply 42

°F chilled water to all chilled water cooling coils during normal plant operation, andduring design basis accident conditions,b)designed so that a single failure of any component, assuming a loss of offsite power, cannot resultin complete loss of chilled water to those chilled water cooling coils serving the essential spaces,c)designed to remain functional during and after a safe shutdown earthquake, and d)provide accessibility for adjustments and periodic inspections and testing of the principal systemcomponents to assure continuous functional reliability.The Essential Services Chilled Water System is designed to safety class 3 and seismic Category Irequirements (refer to Table 3.2-1 for safety and seismic classifications).9.2.9.2System Description9.2.9.2.1General The Essential Services Chilled Water System furnishes chilled water for space cooling purposes andrejects heat through the Component Cooling Water System to the ultimate heat sink (refer to Subsection 9.2.2).The Essential Services Chilled Water System flow diagram is shown on Figure 9.2-8 (for Figure 9.2-8,Sheet 3, refer to Drawing G853, Sheet 5. The system consists of three 100 percent capacity subsystems, each consisting of the following WSES-FSAR-UNIT-39.2-25Revision 9 (12/97)components:a)one water chiller, b)one chilled water pump, c)one chilled water expansion tank with level control actuated makeup, and d)instrumentation and controls, piping and valves.

Additionally, for corrosion protection, each subsystem is provided with an individual and integral chemicalfeed system consisting of a chemical feed tank, chemical feed and drain piping and all necessary valves, fittings, accessories and appurtenances. The chemical feed system is non-safety-related. However, it is isolated from the respective safety-related essential chilled water system by means of locked-closed, manual safety-related isolation valves.These subsystems are piped such that chilled water is circulated, from any two of the subsystems,through two loops which serve equipment in various parts of the Reactor Auxiliary Building. Table 9.2-16 provides a list of safety-related and non-safety air handling units.9.2.9.2.2Water ChillersThe water chillers are located in the Reactor Auxiliary Building on elevation +46 ft. MSL. Each waterchiller is a factory assembled package which is designed and built to satisfy seismic Category I requirements. The parts of the chillers classified as Code Class 3 are designed and fabricated in accordance with ASME,Section III, Code Class 3, 1974 edition up to, and including, the Summer 1975

addenda.The compressor motor, pumpout compressor motor and lubrication oil pump motor are qualified as Class1E equipment according to IEEE-323-1971 and IEEE 344-1975.Each water chiller is a centrifugal, electric motor driven, hermetic, water cooled factory assembledpackage having the following components:a)Structural steel base.b)Hermetic refrigerant compressor/motor assembly with the centrifugal compressor and the electricmotor contained in a single housing in which the heat generated within the motor is removed by the circulating refrigerant. The drive torque is transmitted from the motor to the compressor by a self-aligning, gear type transmission which is contained in the same housing thereby eliminating the need for a shaft seal to isolate the refrigerant circuit.c)Shell and tube, flooded type evaporator (refrigerant on the shell side; chilled water WSES-FSAR-UNIT-3 9.2-26 Revision 15 (03/07) in the tube side) with marine water boxes which have flanges for connections to the chilled water piping. Seamless copper tubes, with integral fins (chilled water side), are constructed and inspected in accordance with ASME Code,Section III, Code Class 3. Steel shell (refrigerant side) is constructed and inspected in accordance with ANSI B9.1 and ASME Section VIII Division 1.

d) Shell and tube refrigerant condenser (refrigerant on the shell side; component cooling water on the tube side) with similar construction to the evaporator, constructed and inspected in

accordance with ASME Code,Section III, Code Class 3.

e) Gauge panel and solid state control panel in a locked enclosure with capacity controls wired to permit fully automatic operation during normal and design basis accident conditions.

9.2.9.2.3 Chilled Water Pumps

The chilled water pumps are designated as Safety Class 3 equipment and designed to meet ASME

Section III, Code Class 3 requirements, 1986 Edition, No Addenda, Subsections ND and NF. They are designed to pump demineralized water at 42F from the evaporator through the associated chilled water piping loop and back to the evaporator. Each chilled water pump is directly driven by an electric motor qualified as Class 1E equipment. The assembly is mounted on a structural steel bedplate and satisfies

seismic category I requirements.

9.2.9.2.4 Chilled Water Piping and Valves

(DRN 06-843, R15)

The piping and valves which are necessary to provide chilled water to safety related air handling units are designed to ASME Section III, Code Class 3 requirements (piping 1971 edition, up to and including the

Winter 1972 addenda (ASME Section III, Winter 1981 Addenda, was used to forego further hydrotesting of welds that had been found to be undersized and had been rewelded); butterfly valves, 1974 edition, up to and including the Summer 1975 addenda; other valves, 1971 edition, up to and including the Winter

1972 addenda). (DRN 06-843, R15)

The chilled water A/B train is connected by piping to the chilled water supply header with normally closed isolation valves 3AC-B138A and 3AC-B139B to permit flow either into the A train or the B train, but not to both simultaneously during design basis accidents. Similarly, the chilled water return is controlled by

normally closed isolation valves 3AC-B145A and 3AC-B146B depending on which train is being

substituted for by the A/B train.

WSES-FSAR-UNIT-39.2-27 Revision 11-A (02/02)(DRN 00-418)

Makeup water for the chilled water system is normally supplied by the non-safety condensate system. Ifthecondensate system is unavailable or unable to maintain level in the chilled water expansion tanks, makeup water can be manually supplied by the control room via the component cooling water makeup system. The component cooling water makeup system is a safety-related, seismic category I system

which takes suction from the condensate storage pool.(DRN 00-418)The condenser water piping consists of valved connections to the inlet and discharge nozzles of each chillercondenser water box from the Component Cooling Water System. Heat rejected from the chiller refrigerant

is transferred to the component cooling water which is pumped to the ultimate heat sink.

9.2.9.2.5 Chilled Water Expansion Tanks The chilled water expansion tank has a capacity of 180 gallons to accommodate system volume changes, maintains positive pressure in the piping system and provides means of adding makeup water to the chilled

water system while permitting air to be vented out of the system.

Makeup water is admitted through solenoid valves 3AC-E611A, 3AC-E612B, and 3AC-E613A/B whenenergized from their respective level controllers for each expansion tank. Each solenoid operated makeup valve is provided with a normally closed valve bypass to permit makeup water to flow when solenoid valve

maintenance is being performed.

The tanks are designed to ASME Section III, Code Class 3 requirements 1974 edition up to, and including, the Summer 1976 addenda.

9.2.9.2.6 Chiller Operation and ControlsEach chiller is equipped with a solid state capacity control system. The refrigerant heat removal capacity iscontrolled by positioning the compressor suction inlet guide vanes. A temperature sensing device in the

chilled water line downstream from the chiller produces signals which are transmitted to an automatic guide vane operator. A decrease in the chilled water temperature causes the guide vanes to move toward the

closed position.(DRN 00-691)

Each chiller, its associated chilled water pump, motor operated valves, the systems served by it and thecontrol systems are all connected electrically to the associated A, B and AB safety channel. Each chilled

water pump is interlocked with its associated chiller so that the chiller operates when the pump is activated.(DRN 00-691)

WSES-FSAR-UNIT-39.2-28Revision 12-B (04/03)There are three separate and independent means of activating each chiller and pump combination:a)each combination can be energized directly from a control switch in the main control room, b)each combination can be energized directly from its own local integrally mounted control panel, and(DRN00-691, R11-A)c)each combination is energized automatically as a result of a loss of offsite power or SIAS Signal(DRN00-691, R11-A)When a pump is started, its chiller w ill operate if both chilled water and condenser water flows are established after a time delay determined by flow switches located in the chilled and condenser water outlet piping. Once the chiller is started, it remains under the control of the temperature controller located in the chilled water discharge piping of that chiller. Should a chiller become non-operational due to an action of an internally wired safety cutout, the chilled water pump will continue to operate until stopped manually.In the event of a loss of offsite power, each of the two normally operating chillers and pumps will be loaded automatically on its corresponding diesel generator. This equipment is connected three minutes into the diesel generator timing sequence. An internal time delay of approximately one minute is required to restart the chillers. Thus, as a result of the chillers' internal control timer, a total of four (4) minutes will be required

to restart the chiller motors after Loss of Offsite Power.9.2.9.3Safety Ev aluation(DRN 02-1623, R12-B)The Essential Services Chilled Water System is a safety-related system designed with functional reliability to assure chilled water flow to cooling coils of the air handling units which provide air conditioning for the

esse ntial equipment rooms and main control room during normal operation and operation following a design basis accident. In addition, the system is protected from the effects of a pipe rupture (ER-W3-2000-0563-00).(DRN 02-1623, R12-B)Each chiller refrigerant compressor casing and chilled water pump casing is designed to withstand penetration by missiles generated within that casing. The chilled water system is protected from any external missiles which could be generated outside of the Reactor Auxiliary Building by virtue of its location

inside the building.A failure modes and effects analysis for the Essential Services Chilled Water System is provided in Table 9.2-17. The system is designed with complete component redundancy and isolation features to assure that chilled water will be provided to A or B piping loops following a design basis accident assuming a single

failure in any one operating train.

WSES-FSAR-UNIT-39.2-29Revision 9 (12/97)9.2.9.4Inspection and TestingAll inspections, testing and a specific cooling capacity test conducted at the factory where the chillers arefabricated are documented prior to the delivery of the chillers. The chilled water pumps are tested hydrostatically at the factory. The tests are documented prior to delivery. The hydrostatic test pressure is 1.5 times the shutoff discharge pressure but at least 150 psig. Each pump is tested for vibration and accepted only if within 0.003 in. double amplitude measured at each bearing housing. Field tests todemonstrate performance are in accordance with provisions of ASME Power Test Code for CentrifugalPumps. Following the installation of the system, preoperational inspection and system tests of all Essential Services Chilled Water System functions are performed and the instrumentation and controls are used to balance the system for design flows, temperatures and pressures.In-service inspection of Code Class 3 components are discussed in the Technical Specifications.9.2.9.5Instrumentation RequirementsThe instrumentation and controls for the Essential Services Chilled Water System is designed to functionduring normal and emergency plant operating conditions. Normally, the system operates automatically after manual starting of the pumps and the water chillers. The automatic controls for each pump and chiller are so arranged as to prevent a start-up of a water chiller without having its associated chilled water pump establish a flow in the system. The chiller will start running only after a time delay, when flow has been proven by the flow switches located in the chilled water and condenser water outlets of the chiller.

After establishing the initial start-up, each chiller will be under the control of its own internal automatic control system to maintain the required water temperature. Temperatures of the water leaving the chillers are also monitored in the main control room and high temperature conditions are alarmed. Flow switches in the chilled water and condenser water discharge lines will monitor for flow failure and individually alarm on the main control board.The following alarms are provided in the main control room for each chiller:a)Electrical Failure - control circuit under voltage, overcurrent and ground condition, chilled waterpump, oil pump and compressorb)Chiller Failure - low chilled water temperature, low chilled water flow, low condenser water flow, lowoil pressure, high condenser pressure and low refrigerant pressure.c)motor compartment high temperature.

Indications in the control room allow the operator to identify the failed element except for chiller internalmalfunction which the operator can identify at the integral local chiller panel. Each of these is also identifiable through the plant monitoring computer.

WSES-FSAR-UNIT-39.2-30The following malfunctions are annunciated to a common alarm provided in the main control room foreach chiller:a)low oil pressure, b)high condenser pressure, and c)low refrigerant pressure.

Makeup water to the chilled water expansion tanks is automatically controlled by means of level switches.The level switches "Low" and "High" will open and close the solenoid valves 3AC-E611A, 3AC-E612B or 3AC-E613 A/B to admit makeup water to their respective expansion tanks. "High-High" and "Low-Low" water levels are annunciated in the main control room.

WSES-FSAR-UNIT-3 TABLE 9.2-1 (Sheet 1 of 5) Revision 14-B (06/06) DESIGN DATA FOR THE COMPONENT COOLING WATER SYSTEMAND AUXILIARY COMPONENT COOLING WATER SYSTEM COMPONENTS1. Component Cooling Water Pumps Type Centrifugal, horizontal split, double suction pump Quantity 3 (DRN 05-1652, R14-B) Capacity, each, gpm, rated 6800 (DRN 05-1652, R14-B) Head, ft., (TDH) 145 NPSH, ft. required 25 available 44 Material Case ASME SA 351-CF8 Impeller ASTM A 351-CF8 Shaft ASTM A 237-4140 CL"A" Bearing Sleeve type (radial); Kingsbury type (thrust) Motor 300 hp, 4000 V, 60 Hz, 3 phase, 1800 rpm Enclosure WP II Insulation F Code ASME,Section III, Class 3, 1971 Edition up to and including 1973 Winter addenda 2. Component Cooling Water Heat Exchangers Type Horizontal, counterflow, straight tubes rolled into tube sheets Quantity 2 WSES-FSAR-UNIT-3 TABLE 9.2-1 (Sheet 2 of 5) Revision 14-B (06/06) 2. Component Cooling Water Heat Exchangers (Cont'd) Flow, gpm Shell Side Tube Side Normal (Max) 6,500 6,500 (DRN 05-1652, R14-B) Accident 4,500 6,900 (DRN 05-1652, R14-B) Shutdown (Max) 6,500 6,500 Design duty, each, BTU/hr 40 x 10 6 (normal) (DRN 05-1652, R14-B) 54.62 x 10 6 (accident)(DRN 05-1652, R14-B) Heat transfer area, each, ft 2 10,514 Design pressure, psig Shell side: 125 Tube side: 125 Design temperature, F Shell side: 125 Tube side: 175 Material Shell Carbon Steel ASME SA-285 Gr C Tube Stainless Steel ASME SA-249 Tube Sheet ASME SA-516-70 Code ASME,Section III, Class 3, 1971 Edition up to and including 1973 Winter addenda 3. Surge Tank Type Vertical Quantity 1 Design pressure, psig 15 Design temperature, F 150 Volume, gal. 550 Material Shell ASME SA-283 Gr C Steel WSES-FSAR-UNIT-3 TABLE 9.2-1 (Sheet 3 of 5) Revision 14-B (06/06) 3. Surge Tank (Cont'd) Dished ASME SA-283 Gr C Steel Baffle ASME SA-283 Gr C Steel Code ASME,Section III, Class 3 1974 Edition up to and including 1974 Summer addenda 4. Chemical Addition Tank Type Vertical Quantity 1 Volume, gal. 70 5. Auxiliary Component Cooling Water Pumps Type Centrifugal, horizontal split, double suction pump Quantity 2 (DRN 05-1652, R14-B) Capacity, each, gpm, rated 6500 (DRN 05-1652, R14-B) Head, ft. (TDH) 145 NPSH, ft. required 23 available 26 Material Case ASME SA 351-CF8 Impeller ASTM A 351-CF8 Shaft ASTM A 237-4140 CL"A" Bearing Sleeve type (radial); Kingsbury type (thrust) Motor 300 hp, 4000V, 60 Hz, 3 phase, 1800 rpm Enclosure Dripproof WSES-FSAR-UNIT-3 TABLE 9.2-1 (Sheet 4 of 5) Revision 305 (11/11)

5. Auxiliary Component Cooling Water Pumps (Cont'd)

Insulation F

Code ASME,Section III, Class 3, 1971 Edition up to and including 1973 Winter addenda

6. Component Cooling Water Makeup Pump

Type Centrifugal, horizontal split, double suction pump

Quantity 2

Capacity, each, gpm 600

Head, ft. (TDH) 150

Material

Case ASME SA 351-CF8

Impeller ASTM A 351-CF8

Shaft ASTM A 276-410

Bearing Antifriction ball

Motor 40 hp, 460 V, 60 Hz, 3 phase, 1800 rpm

Enclosure Dripproof

(DRN 06-843, R15)

Insulation B (DRN 06-843, R15)

Code ASME,Section III, Class 3, 1971 Edition up to and including 1973 Winter addenda

7. Piping (EC-26241, R305)

Piping material Carbon Steel, ASTM A 106 Gr B Seamless or equivalent (EC-26241, R305)

CCWS ACCWS CCWMUS Design pressure, psig 125* 125 125

Design temperature, F 175 125 120 WSES-FSAR-UNIT-3TABLE 9.2-1 (Sheet 5 of 5)

Revision 13 (04/04)7.Piping (Cont'd)Construction:*A portion of the system is designed to 135 psig, 150 psig and 200 psig2-1/2 in. and larger Butt welded except at flanged connections2 in. and smallerS ocket welded except at flanged connections Code ASME,Section III, Class 3, 1971 Edition up to and including

1972 Winter addenda*8.Valves2-1/2 in. and largerGate, Ball and GlobeCarbon ste el, butt weld ends, ASME and ANSI, 150 psi and higher Check and butterfly Carbon steel and cast iron, flanged, butt weld,and/or wafer, ASME and ANSI, 150

psi and higher(DRN 02-1197, R13)2 in. and smallerCarbon and Stainless Steel, socket weld ends, ASME and ANSI, 150 psi and higher(DRN 02-1197, R13)CodeASME,Section III, Class 3, 1971 Edition up to and including

1972 Winter addenda for gate, globe

and check valves, and 1971 Edition up to and including 1973 Summer addenda for butterfly valves, 1989 Edition for BNL check valves, and 1977 Edition up to and

including 1978 Summer addenda for

ball valves.* ASME Section III, Winter 1981 addenda, was used to forego further hydrotesting of piping welds that had been found to be undersized and had been rewelded.

WSES-FSAR-UNIT-3 TABLE 9.2-2 (Sheet 1 of 3) Revision 305 (11/11)

CCWS AND ACCWS TEMPERATURE A ND FLOW CONTROL DESCRIPTION NORMAL NORMAL SHUTDOWN REFUELING ACCIDENT (EC-8477, R305)

Fuel Pool Heat

Exchanger (or

Backup Fuel Pool

Heat Exchanger)

The temperature control valve 3CC-

FM138A/B maintains the fuel pool cooling water temperature leaving the heat exchanger to between 98 F - 105 F, not to exceed 120 F. Same as normal Same as normal, except not to exceed 140°F. Upon SIAS, CCW A division continues to flow through a portion of the non-essential loop to t he RCP seal coolers. CCW A division flow to the fuel pool heat exchangers is shut by closure of the valve 3CC-FM138A/B. Valve 3CC-FM138A/B will automatically close on a SIAS (A Channel), or closure of CCW B

division non-essential isolati on valves 3CC-F121B and 3CC-F123B, or closure of CCW A di vision non-essential isolation valves 3CC-F120A and 3CC-F122A. 3CC-FM138A/B may be manually re-opened. (EC-8477, R305)

Reactor Coolant

Pump (RCP) Flow through the RCP coolers and the CEDM air cooler is set by manually operated outlet valves; the CCWS flow to each pump is shut- off automatically by inlet valves 3CC-B188A1, -189B1, -

190A2, and

-191B2, whenever the pump is not operating; CCWS flow to the CEDM air cooler can also be shutdown from the main control room by closing the inlet

valve 3CC-B187A/B. Same as normal Same as normal Upon SIAS the A division and B division CCW essential loops will be isolated from each other and the non-essential, non-

seismic loop. The A division CCW will continue to supply CCW to the RCP seal coolers. U pon CSAS, containment isolation valves 2CC-F146A/B, 2CC-0F243A/B and 2CC-F147A/B will be automatically closed, thereby shutting CCWS flow to the reactor coolant pump coolers and CEDM air cooler.

Letdown Heat

Exchanger The temperature control valve 3CC-TM169A/B maintains the letdown water temperature below 140 F. Same as normal Same as normal Temperature control valve 3CC-TM169A/B closes automatically when either containment isolation 2CH-F151BA/B or 1CH-F2501A/B in the letdown line closes. The TCV will return to its normal temperature control mode when both of these

containment isolation valves open. These latter valves are closed on SIAS or CIAS.

HPSI, LPSI and Containment Spray

Pumps The required flow is set by manually

adjusting the respective outlet valves. Same as normal Same as normal Same as normal Waste Gas Compressors, Sample Coolers, Boric Acid

Concentrators The required flow is set by manually

adjusting the respective outlet valves. Same as normal Same as normal The SIAS automatically closes the isolating valves 3CC-F133A/B and 3CC-F132A/B, thereby shutting the CCWS flow to the waste gas compressors sample coolers, and concentrators.

Diesel Generator Outlet valves 3CC-F268A and 3CC-F269B are closed. Bypass valves are set to maintain approximately 100 gpm

through each diesel generator. Same as normal Same as normal On loss of offsite power, the diesel generators start automatically. The starting of diesel generators will automatically open the outlet valves 3CC-F268A and 3CC-

F269B, to pass 800 gpm through each diesel generator. The flow is set by manual vales 3CC-B27A, -B28A, -B31B, and -

B32B.

WSES-FSAR-UNIT-3 TABLE 9.2-2 (Sheet 2 of 3) Revision 307 (07/13)

CCWS AND ACCWS TEMPERATURE A ND FLOW CONTROL DESCRIPTION NORMAL NORMAL SHUTDOWN REFUELING ACCIDENT Containment Fan

Coolers Only three containment fan coolers are

operating. One fan cooler is isolated by closing the containment isolation

valves to and from that particular

cooler. The control valves 3CC-

TM148A and 3CC-TM149B control the CCWS flow through the coolers, at 670 gpm for the channel in which the

isolated cooler is located, and at 1340

gpm for the other channel.

Same as normal

Same as normal

Post LOCA, the control valves 3CC-TM148A and 3CC-TM149B open fully to permit 2700 gpm through two fan coolers of each

channel. (EC-30976, R307) Shutdown Heat

Exchanger (SDHX)

(EC-30976, R307)

Outlet valves CC-963A (3CC-F130A)

and CC-963B (3CC-F131B) are closed. Bypass valves are set to maintain approximately 100 gpm flow

through the SDHX.

Outlet valves CC-963A

(3CC-F130A) and CC-

963B (3CC-F131B) are opened fully by operator.

Opening of the valves will provide each SDHX with 3000 gpm, controlled by the flow

restricting orifices 3CC-

K296A and 3CC-K297B.

The operator has the capability from the main control room to partially

close the discharge

valves to a

predetermined position, to reduce the CCWS flow through each SDHX

to 2000 gpm.

Same as normal shutdown Upon SIAS, SDHX B outlet valve will automatically open to pass 3000 gpm; the SDHX A outlet valve will remain as is. Upon CSAS, the SDHX A outlet valve will open automatically to pass 3000 gpm. The operator has the capability to manipulate these

valves from the control room to adjust either valve to a pre-set flow.

Chillers CCWS flow through each chiller is set at 850 gpm, by manually adjusting

valves 3CC-V34A,

3CC-V35A/B, and 3CC-V36B. One chiller is normally isolated. Same as normal Same as normal The chiller water supply valves (3CC-F272A, -F273B -F274A, -F275B, -F276A, -F277B, -F278A, & -F279B) align automatically when temperature exceeds a nominal set point of 102F to supply cooling water to the chillers from the ACCW. Valves will realign automatically to supply cooling water to the chillers from CCWS when the cold CCWS temperature decreases below 95 F. This realignment can be accomplished manually through operator control. Post LOCA, this manual realignment can occur when CCWS cold temperature decreases below 110F to conserve wet cooling tower basin water.

WSES-FSAR-UNIT-3 TABLE 9.2-2 (Sheet 3 of 3) Revision 9 (12/97)CCWS AND ACCWS TEMPERATURE AND FLOW CONTROL DESCRIPTIONNORMALNORMAL SHUTDOWNREFUELINGACCIDENTCCW HeatCCWS temperature is maintainedThe set point forSame as normalThe set point for the control valves 3CC-TM290A andExchangerby either (a) automatic DCT fanthe control valvesshutdown.3CC-TM291B automatically readjust on receipt of aoperation between 88

°F and 92°F,3CC-TM290A and 3CC-TM291BSIAS and if the wet cooling tower basin is > 74

°F to maintainor (b) control valves 3CC-TM290Acan bed adjusted by the the CCWS cold temperature at 115

°F. This feature isand 3CC-TM291B modulate ACCWSoperator from the main con-required to reduce water consumption the wet cooling towerflow to control CCWS at a manualtrol room to maintain the post LOCA.setpoint below 88

°F.CCWS cold temperature at 80

°Fto permit faster shutdown.

WSES-FSAR-UNIT-3 TABLE 9.2-3 (Sheet 1 of 2) Revision 307 (07/13)

HEAT REMOVAL AND WATER REQUIREMENTS FOR THE CCWS ACCIDENT (9) NORMAL SHUTDOWN REFUELING NORMAL OPERATION

ITEM

NO.

OF UNITS

EQUIPMENT

NO. OF UNITS OPERAT-ING PER TRAIN MAX HEAT TRANS-FERRED TO COM-PONENT COOLING WATER SYSTEM 10 6 BTU/HR

MAX FLOW REQUIRE

-

MENTS

-gpm

NO. OF UNITS OPERAT-ING MAX HEAT TRANS-FERRED TO COM-PONENT COOLING WATER SYSTEM 10 6 BTU/HR

MAX FLOW REQUIRE

-

MENTS

-gpm

NO. OF UNITS OPERAT-ING MAX HEAT TRANS-FERRED TO COM-PONENT COOLING WATER SYSTEM 10 6 BTU/HR

MAX FLOW REQUIRE

-

MENTS

-gpm

NO. OF UNITS OPERAT-ING MAX HEAT TRANS-FERRED TO COM-PONENT COOLING WATER SYSTEM 10 6 BTU/HR

MAX FLOW REQUIRE

-

MENTS

-gpm (DRN 03-2063, R14; 05-1652, R14-B)1 2 Shutdown Heat Exchanger 1 Note 1 3100 2 179.74 6000 1 23.9 3000 0 - 200 (EC-8465, R307) 2 4 Containment Fan Coolers 2 165.2(1) 3000 3 4.7 2010 0 0 0 3 4.7 2010 (EC-8465, R307) 3 2 Diesel Generators 1 9.71 950 0 0 200 0 - 200 0 - 200

4 3 HPSI Pumps 1 0.1 25 (14) 0 0 40 0 - 40 0 - 40 5 2 LPSI Pumps 1 0.1 25 (14) 2 0.2 40 2 0.2 40 0 - 40 6 2 Containment Spray Pumps 1 0.1 10 (14) 0 0 10 0 - 10 0 - 10 (DRN 05-1652, R14-B) 7 3 Chillers 1 5.1 (2) 850 (2) 2 6.3 1700 2 6.3 1700 2 6.3 1700 8 4 Reactor Coolant Pumps and Motors 0 - - 2 5.04 1560 0 - - 4 10.08 1560 9 1 Letdown Heat Exchanger 0 - - 1 3.0 300 0 0 0 1 19.92 (3) 1200 (3) (EC-8477, R305) 10 1 Fuel Pool Heat Exchanger (6) 0 (12) - - 1 6.54 (8) 495 1 45.4 (13) 4499 1 20.17 (7) 1230 (EC-8477, R305) 11 3 Boric Acid Concentrators 0 - - 0 - - 2 23.4 1170 2 23.4 1170 12 2 Component Cooling Water Filters (6 vessels per filter) 0 - - - - - 2 - 600 2 - 600 (DRN 06-898, R15) 13 5 Sample Coolers 0 - - 0 - - 5 0 160 5 2.46 160

14 2 Waste Gas Compressor 0 - - 0 - - 1 0.05 5 1 0.05 5 (DRN 03-2063, R14;06-898, R15)

WSES-FSAR-UNIT-3 TABLE 9.2-3 (Sheet 2 of 2) Revision 307 (07/13)

HEAT REMOVAL AND WATER REQUIREMENTS FOR THE CCWS ACCIDENT (9) NORMAL SHUTDOWN REFUELING NORMAL OPERATION

ITEM

NO.

OF UNITS

EQUIPMENT

NO. OF UNITS OPERAT-ING PER TRAIN MAX HEAT TRANS-FERRED TO COM-PONENT COOLING WATER SYSTEM 10 6 BTU/HR

MAX FLOW REQUIRE-MENTS

-gpm

NO. OF UNITS OPERAT-ING MAX HEAT TRANS-FERRED TO COM-PONENT COOLING WATER SYSTEM 10 6 BTU/HR

MAX FLOW REQUIRE-MENTS

-gpm

NO. OF UNITS OPERAT-ING MAX HEAT TRANS-FERRED TO COM-PONENT COOLING WATER SYSTEM 10 6 BTU/HR

MAX FLOW REQUIRE-MENTS

-gpm

NO. OF UNITS OPERAT-ING MAX HEAT TRANS-FERRED TO COM-PONENT COOLING WATER SYSTEM 10 6 BTU/HR

MAX FLOW REQUIRE-MENTS

-gpm (DRN 03-2063, R14;06-898, R15) 15 1 CEDM Cooler 0 - - 1 4.0 (4) 700 (4) 0 - - 1 4.0 700 16 1 Post-Accident Sampling System (10) 1 0 - - 0 - - 0 - - (DRN 06-898, R15)

(DRN 05-1652,R14-B;EC-8477,R305; EC-8465, R307

) TOTALS 180.3 7960 210.75 13055 98.15 11424 91.08 10825 TOTAL PER TRAIN 180.3 7960 105.38 6527.5 55.5 7300 (15) 45.54 5413.5 (DRN 05-1652, R14-B; EC-8477, R305; EC-8465, R307)

NOTES: (1) Maximum post LOCA heat load removed from containment by shutdown heat exchangers and cont ainment fan coolers concurrently. The heat Load for the shutdown Heat Exchanger is included with the heat Loads for the containment fan coolers (2) Cooling water supplied from the ACCWS.

(3) Maximum load during plant loading.

(4) Cooling required until reactor cool ant temperature decreases from to 350 to 300F. (EC-8477, R305)

(5) CCW Pump design capacity is 6800 gpm at 145 ft. T.D.H. CCW Pump run out is 8300 gpm. (EC-8477, R305)

(DRN 99-1097, R11)

(6) FPHE is capable of removing maximum fuel pool heat load of 52.5 x 10 6 BTU/hr. This is not indicat ed in this table since this load will not be present during any of the four operating modes listed. (DRN 99-1097, R11)

(EC-8477, R305)

(7) Maximum heat load with 23 batches in pool plus fresh batch decayed 15 days after shutdown.

(8) Maximum heat load with 23 batches in pool with newest batch 1.5 year old. (EC-8477, R305)

(9) Maximum heat load with only one train available.

(10) PASS not in continuous service. PASS heat load and flow requirements during sampling are negligible compared to the total heat load on the CCW system.

(11) The data in this table is also applicable to the Backup Fuel Pool Heat Exchanger, except for full core discharge heat load given in Note (6).

(12) Fuel pool cooling restored before fuel pool temperature exceeds 180F. (EC-8477, R305)

(13) The fuel pool heat Load is for a full co re offload and is administratively controlled. (DRN 03-2063, R14; EC-8477, R305) (DRN 05-1652, R14-B) (14) Total CCW flow through HPSI, LPSI, and CS pumps together is 60 gpm. (DRN 05-1652, R14-B) (EC-8477, R305)

(15) Fuel Pool Cooling Single Failure Analysis assumes only one CCW train available. (EC-8477, R305)

WSES-FSAR-UNIT-3 TABLE 9.2-4 (Sheet 1 of 2) Revision 15 (03/07)

FAILURE MODES AND EFFECTS ANALYSIS FOR THE CCWS AND ACCWS POST LOCA

FAILURE MODE EFFECT ON SYSTEMS METHOD OF DETECTION MONITOR REMARKS One diesel generator(D-6) fails to start One channel of the CCWS and ACCWS is out of service D-G speed switch Flow meter CRI The redundant channel is operating and is sufficient to shutdown the unit. The nonessential headers are isolated by valves which close on power failure, and by redundant valves which are powered from different bus. Isolating valves, which close after the accident to form two separate CCWS channels, are redundant and powered from different buses.

Loss of one CCW pump One CCWS channel is temporarily out of service Flow meter CRI The operator has the capability to start the standby CCW pump, thereby maintaining 200% capacity of the CCWS.

Failure of an active valve to operate (CCW)

No effect Limit switch CRI Redundant valves are provided. (DRN 06-500, R14-B; 05-1663, R15)

CCW supply line thermal relief

valve (CC-6443)

A) Fails to open Thermal overpressure protection Lost For portion of CCW supply line bounded by containment isol.

valve CC-641 and isolation valves CC-661A(B), CC-651A(B), CC-660A(B), CC-666A(B) &

CC-646 None None B) Fails to shut No effect None None Water inventory loss would be limited since containment isolation valve CC-641 will be shut following an isolation signal. (DRN 06-500, R14-B; 05-1663, R15)

(DRN 00-1638)

CCW return line thermal relief

valve (CC-7102)

A) Fails to open Thermal overpressure protection lost for portion of CCW return line bounded by containment isolation

valves CC-710 and CC-713.

None None B) Fails to shut No effect None None Water inventory loss would be limited since containment isolation valves CC-710 and CC-713 would be shut following an isolation signal. (DRN 00-1638)

Failure of one CCWS control

valve to SDHX or to diesel

generator, or to containment fan coolers No cooling to one SDHX or one diesel generator or two

containment fan coolers Flow meter CRI The unit can be shutdown safely without one SDHX or one diesel generator, or two containment fan coolers.

WSES-FSAR-UNIT-3 TABLE 9.2-4 (Sheet 2 of 2) Revision 307 (07/13)

FAILURE MODES AND EFFECTS ANALYSIS FOR THE CCWS AND ACCWS POST LOCA FAILURE MODE EFFECT ON SYSTEMS METHOD OF DETECTION MONITOR REMARKS Failure of chiller cooling water

transfer valves

A) ACCWS supply valve or

ACCWS discharge valve fails to

open Loss of ACCWS coolant for one chiller Flow meter -

Limit switch CRI The redundant chiller is sufficient to shutdown the unit. B) CCWS supply valve fails to

close High cooling water temp. to one chiller Thermocouple Limit switch

CRI The redundant chiller is sufficient to shutdown the unit safely. C) CCWS discharge valve fails

to close No effect Limit switch CRI Pressure in the CCWS return header is higher than in ACCWS header, and return flow would be directed to the wet cooling towers

(EC-41355, R307)Loss of air

(EC-41355, R307)

No effect The active valves are provided with accumulators and/or springs to ensure proper alignment of the system. Safety

related accumulators are capable of providing motive air to pneumatically operated valves for 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />. Procedures

are established for operating manual handwheel overrides or lining up backup air supplies for continued safety

function after 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />.

Loss of water in CCW surge tank Loss of one channel Level switch CRI The surge tank is separated by internal baffles to ensure that water loss in one channel will not effect the operation

of another channel

Loss of one ACCW pump One ACCWS channel is out of service Flow meter CRI Cooling capacity by the two remaining CCWS channels and redundant ACCWS channel is sufficient to shutdown the unit safely.

Failure of an active valve to

operate (ACCW)

Loss of one ACCW train Limit Switch Flow Meter CRI " Excessive valve leakage following

a Loop (i.e. ACC-114, ACC-108, ACC-1045) Loss of one ACCW train Periodic Testing "

WSES-FSAR-UNIT-3 TABLE 9.2-5 (Sheet 1 of 3) Revision 15 (03/07)

CCWS AND ACCWS INSTRUMENT APPLICATION Indication Alarm*

System Parameter & Location Control Control Function Instrument Local Room High Low Range CCW Heat Exchanger

1. Outlet Temperature CP-8 X(CP-8) X(CP-8) Start auxiliary CCW 50-130F pumps on high temp. 2. System Pressure X PMC X(CP-33) Start ACCW Pump 0-80 psig on low pressure
3. Outlet Pressure CP-8 X(CP-8) 0-150 psig 4. Outlet Flow CP-8 X(CP-8) 0-10,000 gpm

Shell Side

1. Outlet Flow CP-33 X(CP-33) 0-7500 gpm

Shutdown Heat Exchanger

1. Outlet Pressure X 0-150 psig 2. Outlet Flow CP-8 X(CP-8) 0-7000 gpm

Fuel Pool Heat Exchanger (or Backup Fuel Pool Heat Exchanger)

1. Outlet Flow CP-8 0-6500 gpm

Containment Fan Coolers

1. Outlet Flow CP-18 X(CP-18) 0-1500 gpm 2. Inlet Temperature CP-18 40-150F (DRN 03-1988, R15)
3. Outlet Temperature CP-18 40-240F (DRN 03-1988, R15)

Reactor Coolant Pump

1. Inlet Pressure X(CP-2)10-200 psig 2. Pump Seal Cooler 10-200 psig Outlet Pressure X(CP-2)
3. Pump Seal Cooler Outlet Temperature CP-2 X(CP-2) 60-160F HPSI Pump 1. Outlet Flow X(CP-8) -

WSES-FSAR-UNIT-3 TABLE 9.2-5 (Sheet 2 of 3)Revision 11-A (02/02)IndicationAlarm*

System Parameter & LocationControlControl FunctionInstrument Local RoomHighLow Range LPSI Pump1. Outlet FlowX(CP-8) -Containment Spray Pump1. Outlet FlowX(CP-8) -

Boric Acid Concentrator1. Outlet FlowX(CP-4) -

Waste Management Concentrator1. Outlet FlowX(CP-4) -

Waste Gas Compressors1. Outlet FlowX(CP-4) -

Letdown Heat Exchanger(DRN 00-691)1. Outlet PressureX 0-150 psig2. Outlet FlowCP-8 X(CP-4)0-1400gpm Chemical Feed Tank1. Outlet PressureX 0-160 psig CCW Pump1. Discharge PressureX 0-150 psig CCW Surge Tank1. LevelX CP-8X(CP-8)X(CP-8)1.

Control makeup flow into 0-100%2. Level tank (Primary Water Pumps)3. Level2. Automatic bypass of dry towers on low level in corre sponding side of surge tank.

3. Isolates CCW Trains and operates CCW Make-up Pumps.(DRN 00-691)
  • All alarms indicated are in the main control room.

WSES-FSAR-UNIT-3 TABLE 9.2-5 (Sheet 3 of 3) Revision 9 (12/97)Indication Alarm* System Parameter & LocationControlControl FunctionInstrumentLocalRoomHighLow RangeWater Chiller1. Inlet TemperatureCP-18X(CP-18)X(CP-18) 40-150°F2. Outlet TemperatureCP-18 40-150°F3. Inlet PressureCP-18 0-125 psig4. Outlet PressureCP-18 0-100 psig5. Outlet FlowCP-18 0-1500 gpm* All alarms indicated are in the main control room.

WSES-FSAR-UNIT-3 TABLE 9.2-6 Revision 11-A (02/02)

DESIGN DATA FOR PWTP COMPONENTS(DRN 01-111)1)Raw Water Service Pumps *Quantity22)Flush Pumps *Quantity23)Upflow Filters *Quantity24)Clearwell TankQuantity1Capacity, gallons12,000Diameter, feet125)Transfer PumpsQuantity2Flow rate, gpm2756)Primary Water Treatment Drain Pumps *Quantity2*Equipment inactivated in place(DRN 01-111)

WSES-FSAR-UNIT-3 TABLE 9.2-7 (Sheet 1 of 2) Revision 8 (5/96)DESIGN DATA FOR DWS COMPONENTSDELETED SPECIFICDATA WSES-FSAR-UNIT-3 TABLE 9.2-7 (Sheet 2 of 2) Revision 9 (12/97)Equipment Abandoned WSES-FSAR-UNIT-3TABLE 9.2-8 (Sheet 1 of 2)Revision 11 (05/01)PRINCIPAL COOLING TOWER COMPONENTSDRY COOLING TOWERSTypedry, forced draft Quantity2 Number of Fans15/tower Number of Coils10/tower Tube design pressure, psi155 Net Effective Heat TransferSurface Area, each, ft 242,255/towerMaterial TubesASME SA 178, Gr C Tube BundlesASME SA-36 HeaderASME SA-516 Gr 70 Finextruded aluminum Fan Bladesfiberglass reinforced epoxy Fan HubASTM - A48, Class 35 Motor40 hp, 460 V, 60 Hz, 3 phase, 2 speed1800 rpm high speed, 900 rpm low speed(DRN 99-2235)Motor InsulationClass H (DRN 99-2235)Motor EnclosureTEFCGear Reducer Typehelical Bearingsantifriction Governing Code for PressureASME Section III, 1974/Summer 1974Retaining PortionsAddenda WSES-FSAR-UNIT-3 TABLE 9.2-8 (Sheet 2 of 2)Revision 11-B (06/02)

PRINCIPAL COOLING TOWER COMPONENTS WET COOLING TOWERS Material Cell Distribution Piping Hot dip galvanized carbon steel Nozzle316 Stainless Steel Drift EliminatorsSS 304 Fan Bladecast aluminum w/phenolic coating Fan Hubcast aluminum w/phenolic coatingMotor30 hp, 460 V, 60 Hz, 3 phase, 900 rpmMotor Enclosure TEFC(DRN 01-1323)

Motor Insulation Class B or Better(DRN 01-1323)

Governing Code for Pressure ASME Section III, 1974 Edition Retaining Portions WSES-FSAR-UNIT-3 TABLE 9.2-9 Revision 309 (06/16)

ESTIMATED WET-DRY COOLING TOWER HEAT DISSIPATION FOR ALL OPERATIONS

Heat Dissipated by One UHS Train - 10 6 BTU/HR (Note 4) (Note 1) Ambient Total Cold CCW Dry Bulb/Wet Bulb (Note 2) CCW Heat(Note 3) Heat Temperature

( F) Temperature ( F) Dry Tower ExchangerWet Tower Dissipated Heat Removal Requirements (DRN 03-2063, R14) Normal Operation - 100% of dry and wet cooling Towers 95 92/83 27.25 18.29 18.29 45.54 45.54 x 10 6 BTU/HR per one loop (EC-8477, R305) Refueling - 100% of dry and wet cooling towers

are in service 80(5) 80/55(6) 26.12 29.34 29.34 55.5 53.60 x 10 6 BTU/HR per one loop (EC-8477, R305) Normal Shutdown - 100% of dry and wet cooling towers are in service 105 92/83 80.43 24.95 24.95 105.38 105.38 x 10 6 BTU/HR per one loop (DRN 05-1652, R14-B; EC-8465, R307) Accident - 100% of dry and wet cooling towers are in service 115 102/78 117.36 57.84 62.94 180.3 180.3 x 10 6 BTU/HR per one loop (DRN 05-1652, R14-B; EC-8465, R307) (DRN 05-446, R14; EC-530, R303) Tornado Missile Analysis - T = 0 to 2 hrs.

DCT out of service, WCT in natural draft mode. 120 86/76 0 13.17 18.27 18.27 18.27 x 10 6 BTU/HR per one loop Tornado Missile Analysis - T = >2 hrs, 60%

DCT in service, WCT in natural draft mode. 120 86/76 33.67 0 5.1 38.77 38.77 x 10 6 BTU/HR per one loop (LBDCR 15-032, R309) Tornado Missile Analysis - T = 172 hrs, 60% DCT

in service, WCT in natural draft mode, enter SDC

mode. 120 86/76 69.49 0 5.1 74.59 74.59 x 10 6 BTU/HR per one loop (DRN 03-2063, R14;05-446, R14; EC-530, R303, LBDCR 15-032, R309) Note: 1. The design temperature of CCWS is 120 F 2. A 1.9 F/2.0F was added for dry bulb temperatures of 102 F <102F respectively to account for hot air recirculation effects. 3. A 1F wet bulb temperature was added to account for tower hot air recirculation effects. 4. Total capacity of the UHS is the sum of the dry tower and wet tower (DRN 05-446, R14) (DRN 05-446, R14)

(EC-8477, R305) 5. Cold CCW Temperature based on Fuel Pool Cooling Heat Exchanger with single active failure after full core offload commencin g four days after shutdown. 6. Ambient Temperature based on single failure where only one Fuel Pool Cooling Pump and one Component Cooling Water pump are available after a full core offload that commenced four days after shutdown. Administrative controls will require addition al in-reactor hold time depending on expected ambient conditions. For example, maximum te mperature experienced during the time period between October 20 and April 27 would typically require full core offload to be delayed until at least nine days after shutdown. (EC-8477, R305)

WSES-FSAR-UNIT-3 TABLE 9.2-10 Revision 307 (07/13)

WATER REQUIREMENTS FOR WET COOLING TOWERS POST LOCA ESSENTIAL LOADS (DRN 03-2063, R14) WCT A WCT B (DRN 05-1652, R14-B; EC-8465, R307)Evaporation, gallons 93,378 93,378

5% Allowance for Concentration of solids, gallons 4,669 4,669

Drift, gallons 8,589 8,589

Total Consumption, gallons 106,636 106,636 (DRN 05-1652, R14-B; EC-8465, R307)

WCT Basin Capacity, gallons (based on Technical Specification 174,000 174,200

(DRN 05-1652, R14-B; EC-8465, R307)Margin, gallons 67,364 67,564 (DRN 05-1652, R14-B; EC-8465, R307)

Assumptions:

1. Maximum three day average dry bulb temperature (89 F) is used for dry cooling tower heat removal. Actual post-LOCA operation of the wet cooling towers is approximately eight days.
2. Fifty percent relative humidity and 76 F wet bulb temperature are used in the calculations.
3. Essential Chiller is manually realigned back to the CCWS when CCWS cold temperature is below 110 F. (DRN 00-703, R11-A; 05-1652, R14-B; EC-8465, R307)4. Does not include Spent Fuel Pool heat loads. When adding the non-essential load of fuel pool cooling, approximately 113,807 gallons of makeup is required to the WCT basin if only one UHS Train is available. Adequate makeup can be suppli ed to a WCT basin by gravity feeding from the Circulating Water System or the unavailable WCT basin. (DRN 00-703, R11-A; 03-2063, R14; 05-1652, R14-B; EC-8465, R307)

WSES-FSAR-UNIT-3 TABLE 9.2-11 Revision 7 (10/94)COOLING TOWER INSTRUMENT APPLICATION Indication Alarm ControlSystems Parameter & LocationLocalRoomHighLowControl FunctionWet Cooling Towers1. Motor Vibration X (3)2. Fan Operation X (1)Wet Cooling Tower Basin1. Level X (2) X (2) X (2) open/close make-up valves2. Temperature X (1) X (1)Start Wet Cooling Tower FansDry Cooling Tower1. Motor Vibration X (3)Fans are automatically2. Fan Operation X (1)controlled by CCWS temperature Notes (1) Control Panel CP-33 (2) Control Panel CP-8(3) Control Panel CP-13 WSES-FSAR-UNIT-3TABLE 9.2-12 (Sheet 1 of 2) Revision 11-A (02/02)

DESIGN DATA FOR CONDENSATE STORAGE SYSTEMA.Condensate Storage TankQuantity1 Capacity, gal.

260,000Height, ft.36 Diameter, ft.35(DRN 01-559)

Operating Pressure Positive with respect to atmospheric pressure(DRN 01-559)

Operating Temperature, °F0-100Design Pressure, psig1

Design Temperature, °F100 Material Carbon SteelB.Condensate Transfer PumpQuantity1 TypeHorizontal, Radial Flow Capacity,gpm500 Total Dynamic Head, ft.50 Shutoff Head, ft.70 Runout Capacity, gpm700

Speed, rpm 1800Brake Horsepower8.6 Efficiency, %74 Materials of Construction Bedplate Cast Iron CasingDuctile Iron ImpellerCast Iron Shaft 316 SS Driver TypeE lectric-Induction Motor Rating/Speed 10 hp/1800 rpm Voltage/Phase/Frequency460 V/3 ph/60 hz Service Factor1.0C.Condensate Storage Tank PumpsQuantity2TypeIn Line Capacity,gpm100 Total Dynamic Head, ft.220

Speed, rpm 3600 WSES-FSAR-UNIT-3 TABLE 9.2-12 (Sheet 2 of 2) Revision 13-B (01/05) Materials of Construction Casing 316 SS Impeller 316 SS Shaft Carbon Steel Driver Type Electric-Induction Motor Rating/Speed 15 hp/3600 rpm Voltage/Phase/Frequency 460 V/3 ph/60 hz (DRN 04-92, R13-B) Service Factor 1.0 or 1.15 (DRN 04-92, R13-B)D. Demineralized Water Storage Tank Quantity 1 Capacity, gal. 500,000 Height, ft. 42 Diameter, ft. 50 Operating Pressure, inch WC 2.5 Operating Temperature, F 0-100 Design Pressure, psig 1 Design Temperature, F 120 Material Carbon Steel E. Hotwell Transfer Pump Quantity 1 Type Horizontal, Radial Flow Capacity, gpm 500 Total Dynamic Head, ft. 50 Shutoff Head, ft. 70 Runout Capacity, gpm 700 Speed, rpm 1750 Brake Horsepower 8.6 Efficiency, % 74 Materials of Construction Bedplate Cast Iron Casing Ductile Iron Impeller Ductile Iron Shaft 316 SS Driver Type Electric - Induction Motor Rating/Speed 10 hp/1800 rpm Voltage/Phase/Frequency 460 V/3 ph/60 Hz Service Factor 1.0 WSES-FSAR-UNIT-3TABLE 9.2-13 (Sheet 1 of 2)DESIGN DATA FORTURBINE CLOSED COOLING WATER SYSTEM COMPONENTSTurbine Cooling Water Heat ExchangersTypeHorizontal, straight-tube, single pass Quantity2 half capacityDesign Duty, Each, Btu/hr.45 x 10 6Heat Transfer Area, Each, Ft.

211,400 effectiveDesign Pressure, psig125 shell side, 50 tube side Design Temperature, F150 shell side, 150 tube sideMaterial ShellCarbon steel, ASTM A-285, Grade C TubesTP-304S/ASTM A-249 Tube SheetASTM A-516, Grade 70CodesTEMA, Class C, ASME Sections VIII and IX,1971 Edition, 1973 Summer AddendaTurbine Cooling Water PumpTypeHorizontal centrifugalQuantity2 full capacityCapacity, Each, gpm12,000Head, ft.144 Material CaseCast iron, ASTM A-48 ImpellerCast iron, ASTM A-48 ShaftCarbon Steel, AISI-1045 Motor600 hp, 4000 V, 3 phase, 60 Hz, 1180 rpmInsulation ClassBEnclosureTEFC WSES-FSAR-UNIT-3TABLE 9.2-13 (Sheet 2 of 2)DESIGN DATA FORTURBINE CLOSED COOLING WATER SYSTEM COMPONENTSTurbine Cooling Water Pumps (Cont'd)CodesNEMA, Standards of Hydraulic Institute Turbine Cooling Water Surge TankTypeVertical Quantity1Design Pressure, psig5Design Temperature, F125Volume, gal550 MaterialASTM A-283, Grade C CodeASME Section VIII, 1974 Edition,1974 Summer AddendaChemical Feed TankTypeVertical Quantity1 Design Pressure, psig125 Design Temperature, F125 Volume, gal46 MaterialCarbon Steel SA-106BCodeASME Section VIII, 1971 Edition,1972 Winter Addenda WSES-FSAR-UNIT-3TABLE 9.2-14 Revision 9 (12/97)TURBINE PLANT OPERATING FLOW RATESAND CALCULATED HEAT LOADSFlow/UnitHeat Load/UnitComponent Description (gpm)(Btu x 10 6/hr) Turbine Lube-Oil Coolers (1) 3400 13.478Turbine Stator Coolers (2) 1280 11.8 Turbine E-H Fluid Coolers (2) 20 0.1 Hydrogen Seal Oil Unit (1) 100 0.365Air Seal Oil Unit (1) 260 1.04Hydrogen Coolers (4) 1227 9.8 Exciter Air Cooler Units (4) 90 0.323 Feedwater Turbine Lube-OilCoolers (2) 80 0.30Vacuum Pumps (1) 150 0.57 (2) 180Condensate PumpMotor-Bearing Coolers (3) 20 0.1Air Compressors (5) 75 0.31 Heater Drain Pump SealCoolers (3) 10 0.05Heater Drain Pump MotorCoolers (3) 5 0.018Isolated Phase Bus Cooler (1) 200 0.71 WSES-FSAR-UNIT-3TABLE 9.2-15 Revision 11-A (02/02)DESIGN DATA FOR PRIMARY WATER STORAGE SYSTEMPrimary Water Storage TankQuantity1 Capacity, gal.

260,000Height, ft.36 Diameter, ft.35(DRN 01-559)

Operating Pressure Positive with respect to atmospheric pressure(DRN 01-559)

Operating Temperature, F0-100Design Pressure, psig1 Design Temperature, F100

Material Carbon Steel Primary Water PumpsQuantity2 Type Horizontal, Radial FlowCapacity,gpm300 Total Dynamic Head, ft231 Shutoff Head, ft240 Runout Capacity, gpm750

Speed, rpm 3500 Brake Horsepower 28.2Efficiency, %62 Materials of Construction Bedplate Cast Iron Casing Stainless Steel Impeller Stainless Steel Shaft 316 SS DriverTypeE lectric-Induction MotorRating/Speed40 hp/3600 rpmVoltage/phase/Frequency460 V/3 ph/60 hzService Factor1.0 WSES-FSAR-UNIT-3TABLE 9.2-16 Revision 9 (12/97)SAFETY-RELATED AND NON-SAFETY-RELATED AIR HANDLING UNITSSafety-Related Air Handling UnitsElevation (ft. MSL)Quantity per subsystemTag No.Area Served+461AH-12Control Room+461AH-26Control Room (Mechanical Equipment Room)+461AH-25Switchgear Area, Cable Vault and Battery Rooms+211AH-24CCW Heat Exchangers+211AH-20CCW Pump AB+211AH-10CCW Pumps

+ 71AH-30Switchgear Area-351AH-21Safeguard Pump AB-352AH- 2Safeguard Pumps

-351AH- 3Shutdown Heat Exchangers-351AH-17Emergency Feedwater Pumps-351AH-18Charging Pumps-351AH-22Charging Pumps ABNon-safety Air Handling Units+ 71AH- 5'HVAC Area+ 71AH- 6Chemical Lab+ 71AH- 8Decontamination and First Aid Area+ 71AH-36I & C Room+461AH-32Decontamination Room+461AH-33Hot Machine Shop WSES-FSAR-UNIT-3TABLE 9.2-17ESSENTIAL SERVICES CHILLED WATER SYSTEMFAILURE MODE AND EFFECTS ANALYSISComponent/Identifi- Failure Effect on Method ofcation & Quantity Mode System DetectionMonitor RemarksWater Chiller (2)1- Loss of powerLoss of cooling1- Breaker tripCRI*100 percent capacity capacitystandby system will2- Loss of refrigerant2- Water temperaturebe operable.

3- Condenser/Evaporator indicator with sen-tube leakage sor at chiller outlet3- Temperature alarm with sensor at operating main control room air handling unit supply fan dischargeChilled Water Pump Loss of powerLoss of chilledFlow switch at chillerCRI100 percent capacityMotor (2)water flowoutletstandby system will beoperable.Chilled Water Piping Rupture1- Loss of chilled1- Flow switch in chilledCRI100 percent capacity water flow water pipingstandby system will be operable2- Increase in chilled2- Temperature indicator water temperature with sensor at chiller outlet3- Increase in room air temperature3- Temperature alarm with sensor at oper- ating main control room air handling unit supply fan discharge4- Temperature alarm from each safety related pump

roomCCW Water Piping Rupture1- Increased in chilled1- Temperature indicatorCRI100 percent capacity water temperature with sensor at chillerstandby chilled water outletsystem will be operable.2- Increase in supply2- Temperature alarm with air temperature sensor at each main con- trol room air handling unit supply fan discharge*CRI = main control room indication